UPS System Testing and Commissioning
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves post-installation testing and commissioning of an uninterruptible power supply (UPS) system to ensure seamless power transition during generator switchover periods of 3 to 10 seconds. The scope includes verifying system stability and confirming full integration with critical IT and security infrastructure, which is essential for maintaining operational continuity and safeguarding vital systems. The work is classified under NAICS code 541340, indicating technical and testing services. Issued by the Department of Defense through the 0906 Aq Co Contracting Battalion, this subcontract opportunity was posted on June 10, 2026, with a response deadline of June 19, 2026. Specific location details for performance and contact information were not provided in the summary. The contract requirements emphasize the importance of reliability and compatibility of the UPS system with existing defense infrastructure.
General Info
Agency
NAICS
Place of Performance
AP, KORSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
