Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on February 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

US 395, NSC Sprague Ave to Spokane River - Stage 3

Closed
XE3595State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County (HOC) for the demolition of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and lead walks. While above-grade utilities must be removed, underground utilities are to be capped or abandoned in place, and all asphalt, curbs, and gutters are to remain. Additionally, the contractor is responsible for removing dumped materials from the neighboring Emory Grove Village parcel. The initial period of performance is four months from the Notice to Proceed, and the contractor is responsible for obtaining all necessary raze permits and adhering to the Montgomery County Approved Sediment Control Plan. Proposals must be submitted via the OpenGov Procurement Portal by November 13, 2026, at 12:00 pm. Evaluation is points-based, with 20% of the score weighted toward the schedule and 15% toward the price proposal. Award criteria emphasize safety, expedited completion, and quality assurance. Mandatory requirements include 100% payment and performance bonds, comprehensive insurance, and strict adherence to HOC Contractor and Subcontractor Background Screening Requirements. Compliance with the HOC Works Program, Davis-Bacon Wages, Maryland Prevailing Wage Laws, and HUD certifications regarding debarment and suspension is required. Payment terms include a 30-day processing window following approval, with a 5% retainage held until final acceptance by HOC.
Real Estate

POSTED

about 7 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This contract involves the construction and demolition work related to the US 395 corridor from NSC Sprague Avenue to Spokane River, specifically within the city limits of Spokane, Washington. Key activities include the construction of three sign bridges, including two cantilever sign structures, as well as the installation of new signing, curbing, and hot mix asphalt paving. The project also encompasses the demolition and removal of existing WSDOT property, which involves asbestos abatement, building and contents removal, and fence removal. The scope aims to improve roadway infrastructure and signage, ensuring safety and functionality. The contract is valued between five million and fifteen million dollars and is managed by the Washington Department of Transportation. It is open for responses until May 14, 2025, with the primary contact being Kristina L. Peart, the Contracting Officer. The project emphasizes compliance with environmental safety standards, especially regarding asbestos abatement, and requires coordination for demolition and paving activities within the urban setting. Interested parties can find more details and submit proposals through the official WSDOT contracting portal.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Kristina L. PeartContracting Officer

Full Description

Show more
New Bridges No. 395/407W and No. 395/407E, three sign bridges, cantilever sign structure, hot mix asphalt paving, signing, curbing and demolition of WSDOT property within the city limits of Spokane. Abatement of asbestos materials, removal and disposal of buildings and contents, fence removal,…

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS