Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from General Services Administration was posted on September 18, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

US Probation Office-6 Office Build Out

Closed
GS-09P-08-WJ-C-0029Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 9 days

General Info

Contract Value

$48,503.48

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

United States Probation Office Suite 1200 300 Las Vegas Blvd. Las Vegas, NV 89101, LAS VEGAS, NV, 89101, USA

Set-Aside

NONE

Award Issued Date

Documents

1

GS-09P-08-WJ-C-0029 - Build out 6 office spaces for US Probation Office

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R9 Amd Sat San Diego Support Section
Contacts1 person available
OfficeSan Diego, CA, 92101, USA
Office AddressSan Diego, CA, 92101, USA
Contacts
Herbert Tom OrrellProperty Manager Intern

Full Description

Show more
Scope of Work Material and Labor for Construction of Six (6) Office Spaces United States Probation Office Suite 1200 300 Las Vegas Blvd. Las Vegas, NV 89101 Scope of Work Part 1 - General 1.01 Location/ Objective A. The project is located in the United States Probation Office, Suite 1200, 300 Las Vegas Blvd., Las Vegas, Nevada 89101. B. The objective of this project is to provide material and labor for the construction of six (6) office spaces. 1.02 Work Summary A. General Intent - Frame approximately 182 lineal feet of wall utilizing 3 5/8, 22 gauge metal studs, mechanically fastened to metal upper and lower track. Mechanically fasten lower track to flooring no less than 24 on center. Top track to be flush with the underside of the existing T-Grid ceiling. Upper track shall be attached to and or braced to joist above no less than 4 foot on center. All angle bracing shall be staggered. - Provide material and labor for the installation in each office, one (1) dedicated 110VAC 20 amp outlet, two (2) general purpose 110VAC outlets, two (2) data lines, one (1) phone line and one (1) four square box, mud ring and blank cover plate with conduit running six inches above top plate. - Provide material and labor for the installation of one (1) 110 VAC , 20 amp outlet at the hallway outside of room #3. - Relocate six (6) existing 2'X 4 florescent light fixtures, furnish and install six (6) additional 2'X 4 florescent light fixtures to ensure each office has two (2) fixtures. Furnish and install lighting motion sensor in each office. - Relocate any and all annunciating speakers that fall within the office spaces to the closest adjacent hallway. - Provide labor and material for the relocation of three (3) existing fire sprinkler heads and the addition of three (3) fire sprinkler heads. (one head per office) - Provide labor and material to reroute five (5) existing HVAC supply ducts to new office spaces. Provide material and labor for the installation of one (1) new HVAC supply duct. Provide material and labor for the installation of six (6) return air registers. - Provide material and labor to bead blast, primer coat and spray finish coat on five (5) GSA provided door jambs with side lights and one (1) GSA provided 3'0X 7'0 metal door jamb with trim. Install six (6) client provided 3'X 7 wood doors with hardware, verify proper door swing. All paint colors and hardware are to match existing offices. - Furnish and install necessary locking hardware for each door and rekey to existing keylock system. - Provide material and labor for the installation of one 4'X 3 metal cased window. - Provide material and labor for glazing of sidelights and window. NOTE: Tempered glass must be utilized on all side lights. - Provide material and labor for the installation of 5/8 Type X, gypsum board. Mechanically fasten gypsum board to newly studded walls, provide and install corner bead on all outside corners. Provide and install L-metal on the top leading edge of the gypsum board at the T-Grid ceiling. Provide material and labor to tape all inside corners and joints, sand and prepare walls to receive primer and paint. Wall shall be Class 4 minimum. - Provide material and labor for the application of outside perimeter walls of these offices to be painted a burgundy-type color (similar to the paint in Room 2-235). These walls to be painted with one coat of latex primer and as many as final coats needed of the color to cover evenly. - one (1) coat of latex primer and one (1) coat of finish paint. Paint and finish to match existing. - Provide material and labor for installation of 4 vinyl cove base on all newly constructed walls. Cove base to match existing. - Contractor to provide adequate labor and refuge box to ensure the work area is maintained in a safe, neat and orderly fashion. - Contractor will be responsible to field verify all utility locations, dimensions and existing conditions. 1.05 Coordination A. All work on-site shall be coordinated with GSA or GSA's representative. Part 1 Executions A. All activity of this contract shall be completed within 30 calendar days after - Notice to Proceed. 1.1.A. Temporary Services A. Owner will pay cost of any energy used (i.e. water, electricity, etc.) during the performance of this task; however, contractor should exercise measures to conserve energy to the maximum extent possible. B. Contractor shall provide their own equipment, flexible power cords and any other tools needed to complete this project. 1.1.B. Facilities A. Existing permanent designated facilities located in another location may be used during the installation to be determined by the owner representative. 1.1.C. Parking A. Use of existing agency (U.S. Probation Office) on-site parking may be provided during the duration of this project. B. Tracked vehicles will not be allowed on paved areas without the expressed written consent of GSA or GSA's Representative. 1.1.D. Temporary security access and control A. All contract employees will be required to fill out a background security clearance form prior to starting work or will be escorted by an U.S. Probation Office representative if the urgency of the repairs is deemed necessary. B. All contract employees must be properly supervised to ensure work is satisfactorily performed and industry standards are maintained. 1.1.E. Cleaning and waste removal A. At regular intervals during progress of work, clean-up building premises and site and dispose of waste material, rubbish, and debris. B. Do not allow material, rubbish, and debris to accumulate and become an unsightly or hazardous condition. Maintain site in a clean and orderly condition. C. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space. 1.1.F. Owner Occupancy A. The owner and tenant will occupy the premises during the entire period of the cleaning for the conduct of normal operations. B. Cooperate with owner to minimize conflict, and to facilitate owners operations. END.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS