USACE SPK DBB Construction - Military Ocean Terminal Concord (MOTCO) Pier 2 Generator Site Work, Concord, California

Awarded
W9123822B0013Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, and right-of-way restoration. Specifically, the contractor will install 48-strand buried fiber optic cable provided by the contractor and 48-strand all-dielectric fiber provided by the District. The project must adhere to RUS Form 515a and IEEE Standard 1333-1994 for guided boring. Work is expected to be awarded by November 25, 2026, with a final completion deadline of April 15, 2027. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet and current all-inclusive equipment and labor rates. Evaluation factors for the award include quoted price, conformance with specifications, past schedule performance, and the bidder's financial responsibility and experience. To qualify, bidders must certify the completion of at least three similar buried fiber optic installation projects within the last five years. Payment terms specify that 95 percent of the price is paid within 30 days of acceptable performance, with 5 percent retained until final acceptance. An optional pre-bid teleconference is scheduled for November 5, 2026, to review contract specifications.
Nebraska Public Power District

POSTED

about 11 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
W076 Endist Ft Worth

POSTED

about 12 hours ago

DEADLINE

in 14 days
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 17 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 17 hours ago

DEADLINE

in 19 days
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in about 1 month

General Info

Contract Value

$5,100,804.06

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

CA

Set-Aside

SBA

Award Issued Date

Documents

1

Bid+Opening+Abstract-+20220909.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Aug 23, 2022 to Sep 2, 2022. The notice description changed.

Notice updated

Response deadline changed from Sep 2, 2022 to Sep 9, 2022. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Sacramento
Contacts1 person available
OfficeSACRAMENTO, CA, 95814-2922, USA
Office AddressSACRAMENTO, CA, 95814-2922, USA
Contacts

Full Description

Show more
Project Description: The project scope consists of the civil site work necessary to support a complete stand-by power plant to power the MOTCO Pier. The power plant will consist of day tanks, main fuel storage tanks, fuel transfer pump(s), paralleling switchgears, generator management relays, switchgear management relay (which will be placed in the Substation switchgear), load bank, automatic transfer switch, transformer, and other electrical / mechanical equipment deemed necessary for the successful installation and operation of the generators. The civil site work includes site preparation, concrete pads for the equipment, electrical grounding, site lighting, fencing and bollards, and any required site demolition. In accordance with FAR 36.204(f) the estimated magnitude of construction is expected to be between $1,000,000 to $5,000,000. This prospective contract action will be conducted using NAICS Code is 237130 - Power Communication Line and Related Structures Construction. The size standard is $39,500,000 in average annual receipts. Product Service Code is 6115 Generators and Generator Sets, Electrical. The only INTERESTED VENDORS LISTS (plan-holder/bidder list) is available via SAM.gov. Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors. Contractors should check SAM.gov frequently for any changes to the interested vendors list and notice. **Note**: All prospective contractors and their subcontractors and suppliers must be registered in SAM.gov before they will be allowed to download solicitation information. Contractors must be registered in the System for Award Management (SAM) at https://sam.gov/content/home prior to award of this contract. Solicitation documents, plans and specifications will only be available via the Procurement Integrated Enterprise Environment (PIEE) website, link provided at the bottom of this description. Instructions on getting access to the PIEE Solicitation Module and submitting your proposal were provided with the Pre-Solicitation posting for this requirement and are also available via the PIEE website training module. Registration for plans and specifications should be made via the Procurement Integrated Enterprise Environment (PIEE) website https://wawf.eb.mil. Registration in PIEE is a multi step process and can take several days so plan accordingly. If you are not registered, the United States Government is not responsible for providing you with notifications of any changes to this solicitation. The solicitation will be available only as a direct download. It is therefore the Contractors responsibility to monitor the website daily for any posted changes or amendments to this solicitation. The plans and specifications and all notifications of changes to this solicitation shall only be made through this posting and modifications hereto. This solicitation is in .pdf format and requires Adobe Acrobat Reader. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader. SAM/PIEE Amendment 1: Addition of Site Visit Agenda, Site Visit Sign in Sheet, and Site Visit Photos to posting. SAM/PIEE Amendment 2: Solicitation Amendment 0001 issued to (1) Extend the bid due date from 23 August 2022 at 10:00A.M. (PDT) to 02 September 2022 at 10:00A.M. (PDT) and (2) Include the most recent Construction Wage Rate Determination CA20220018 dated 11August2022 SAM/PIEE Amendment 3: Solicitation Amendment 0002 issued to (1) Extend the bid due date from 02 September 2022 at 10:00A.M. (PDT) to 09 September 2022 at 10:00A.M. (PDT), (2) Extend the period of performance from 365 calendar days to 548 calendar days, (3) Include the most recent Construction Wage Rate Determination CA20220018 dated 26August2022, and (4) Provide Revised Specification Section 26 32 15 SAM/PIEE Amendment 4: Solicitation Amendment 0003 issued to (1) Change to Product Service Code (PSC) from 6120 Transformers: Distribution and Power Station to Y1NZ Construction of Other Utilities, (2) Include the most recent Construction Wage Rate Determination CA20220018 dated 02September2022, and (3) Update Delivery Schedule for each CLIN to match PoP of 548 days included in Solicitation Amendment 2. Posting of Bid Opening Abstract in SAM (not in PIEE) *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822B0013' to obtain more details.*

More opportunities from Department Of Defense → W075 Endist Sacramento

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS