Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on July 14, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCGC Polar Star Boiler Inspection

Closed
70Z08525Q0020189Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation is soliciting proposals for the complete repower of a 30 foot Munson landing craft. The selected contractor will be responsible for the decommissioning and removal of two existing Honda BF250A outboard engines and the procurement and installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing structural transom inspections, the installation of Honda iST electronic control heads at dual helm stations, integration with the SeaStar Power Assist steering system, and a comprehensive fuel system overhaul using USCG Type A1-15 lines. The project concludes with NMEA 2000 network integration, digital gauge installation, and a minimum two hour sea trial to validate performance and safety protocols. To ensure factory warranty coverage, the contractor must maintain active Honda Marine Authorized Dealer or Service Center status. The vessel will be delivered via trailer to the contractor facility, which must provide a secure, fenced yard or indoor shop. Award evaluation is based on a weighted criteria of cost, technical expertise, and TERO status, with a preference for Colville Business Enterprises. Proposals must be submitted in PDF format by November 13, 2026. Final contracts are subject to tribal appropriation and may require a performance bond for values exceeding 100,000 dollars or a 25 percent retainage.
Confederated Tribes of the Colville Reservation

POSTED

about 9 hours ago

DEADLINE

in 24 days
NAICS: 336611
New
Federal
USCGC CROCODILE DD2 FY27 #1 MDE W5
Solicitation # 70Z08027PBPLCROCODILE
The Department of Homeland Security, through the U.S. Coast Guard Surface Forces Logistics Center, has issued a Sources Sought Notice under solicitation number 70Z08027PBPLCROCODILE to conduct market research for drydock and dockside repairs to the USCGC CROCODILE (WPB-87369). This notice is intended to identify capable sources, determine the availability of suitable commercial items, and understand current commercial practices to inform future competition and set-aside decisions. The anticipated scope of work includes 34 specific items, such as Main Diesel Engine W-5 maintenance, propulsion shaft and rudder assembly renewal, 100 percent underwater body and hull plating preservation, tank cleaning, and the provision of drydocking and sea trial support. The anticipated period of performance is 63 calendar days, scheduled from April 20, 2027, to June 22, 2027. All work is to be performed at the contractor's facility with no geographical restrictions. Interested firms under NAICS code 336611, which has a size standard of 1,300 employees, must submit capability statements, business size certifications, and past performance information by October 21, 2026. This notice does not constitute a formal solicitation or an obligation for the government to take further action, and potential offerors are advised to monitor Sam.gov for any future solicitations.
CG-SEA-C21

POSTED

about 12 hours ago

DEADLINE

in about 15 hours

AI Contract Overview

Show more

This contract involves a boiler inspection and repair project for the USCGC Polar Star, scheduled from July 21 to August 4, 2025, with the solicitation extended until July 17, 2025. The scope includes investigating a leak in the #2 boiler fire side casing, inspecting the remaining casing for leaks, ensuring the integrity of pressure components, and providing repair recommendations. The contractor is responsible for performing all work in accordance with Coast Guard standards, including welding, brazing, fire prevention, and material procurement, while adhering to specified safety and environmental regulations. The work will be conducted while the vessel is in drydock at Mare Island Drydock in Vallejo, California, with the contractor required to submit insurance certificates, technical personnel credentials, and participate in site visits during the solicitation period. Key tasks include conducting a thorough fireside cleaning, visual inspections for damage or corrosion, and performing a hydrostatic pressure test at the design working pressure of 150 PSI under Coast Guard supervision. The contractor must provide qualified technical representatives, including a National Board-certified inspector and a refractory specialist, to oversee inspections, repairs, and testing. All residual fluids and waste must be disposed of legally, with documentation provided to the USCG. The contractor must also prepare detailed reports on findings, damage assessments, and recommended corrective actions, ensuring all work aligns with applicable Coast Guard and federal standards. The project emphasizes safety, compliance, and thorough documentation to maintain vessel integrity and operational readiness.

General Info

Inspection and repair of USCGC Polar Star boiler leak, with certified inspectors, July-August 2025.

NAICS

336611 - Ship Building and Repairing

Place of Performance

Vallejo, CA, 94592, USA

Set-Aside

SBA

Documents

1

SOW-BoilerInspect_WAGB-399rev1

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jul 14, 2025 to Jul 17, 2025. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA

Full Description

Show more
SOLICITATION EXTENDED UNTIL 17JULY 0800. UPDATED POP 21JUL-04AUG USCGC Polar Star Boiler inspection. POP: 21July-04Aug Please see Attached SOW for images General Requirements 1. SCOPE 1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors for Coast Guard vessels. 2. REFERENCES COAST GUARD DRAWINGS None COAST GUARD PUBLICATIONS Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response OTHER REFERENCES None 3. REQUIREMENTS 3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirement of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract. 3.2 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740. 3.3 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550 3.4 Materials. The Contractor must obtain all the materials required to complete this job except for the Government-furnished Property shown in Paragraph 1.2 of Work Item 1, if any specified. 3.5 Period of Performance. The period of performance for this requirement starts on 16 July 2025 and ends on 1 August 2025. 3.6 Location. The Contractor must perform this work while the USCGC POLAR STAR is in drydock at Mare Island Drydock (MIDD) - 1180 Nimitz Ave, Vallejo, CA, 94592. Contractor must provide Certificate of Insurance and full name of contractors, subcontractors, and technical representatives to the designated USCG representative at least 24 hours prior to arriving on-site. Contractor does not require access to designated restricted and/or controlled access spaces on the ship in execution of this work. 3.7 Release of References. For any listed references to be distributed, the contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide your JCP number and expiration date to the listed point of contact (POC) for this work. 3.8 Solicitation Period Site-Visit. The Contractor can perform a ship check during the solicitation period of this requirement. The Contractor must contact the designated points of contact (POC) at least 48 hours prior to requested access for USCG to process. The POC for a site visit is listed in Paragraph 3.10. Access prior to award cannot be guaranteed and depends on the availability of the POCs and the Contractor providing request documentation needed for access. USCG is not responsible for any costs associated with the Contractor's site visit. 3.9 Documentation for Contractor's Proposal. The Contractor must include at least the following in their proposal for this requirement: basic information (name, company name, contact details, the date, Unique Entity ID), company overview, past performance (if applicable), technical representative certifications and qualifications, and signature of the authorized person. 3.10 Points of Contact. The USCG Technical POCs for this requirement include but are not limited to the following: 3.10.1 SFLC-LREPL Asset Manager, LT Mike Axelsson, Mikael.J.Axelsson@uscg.mil 3.10.2 SFLC-LREPL Engineer Officer, LT Joshua Herring, Joshua.C.Herring@uscg.mil ITEM 1: #2 Boiler, Open and Inspect 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to investigate a leak in the #2 boiler fire side casing, inspect the rest of the casing for leaks, ensure the pressure-containing components are intact, and provide repair suggestions. See Figure 1 for nameplate information of the boiler. 1.2 Government-furnished property. None. 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 400 WAGB 103-003, Rev AM, Booklet of General Plans (POLAR STAR) Coast Guard Drawing 400 WAGB 5101-7, Rev 1, SDW 350M Marine Auxiliary Boiler Bare Boiler Design Arrangement Coast Guard Publications Coast Guard Technical Publication (TP) 2035, SWBS 517, Section A, Rev -, Auxiliary Boiler Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Other References Code of Federal Regulations (CFR) Title 46, Part 61.05, 2025, Tests and Inspections of Boilers National Board of Boiler and Pressure Vessel Inspectors (NBBI), NBIC, 2023, National Board Inspection Code 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. None. 3.1.2 Tech Rep. The Contractor must provide the following Technical Representatives. 3.1.2.1 Inspection Tech Rep. The Contractor must provide the services of a National Board of Boiler and Pressure Vessel Inspectors (NBBI) Commissioned Inspector or Pressure Equipment Inspect for Inservice boilers with an - R endorsement to accomplish the following tasks - on site: Inspect the boiler Inspect any repairs of the boiler 3.1.2.1.1 The Contractor must submit the name of the NBBI inspector and their current credential in their solicitation proposal for this work. 3.1.2.2 Refractory Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with boiler refractory and firebox construction to accomplish the following on site: Inspect refractory and other firebox components Recommend repairs 3.1.2.2.1 Ensure the Tech Rep has experience with the equipment stated above and demonstrated on their r'sum. 3.1.2.2 Submit the name and r'sum of the Tech Rep to the designated USCG representative in the solicitation proposal for this work. 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences) including, but not limited to the following: Insulation Sheathing 3.1.5. Residual Fluids. The Contractor must dispose of residual fluids in compliance with all applicable Federal, state, and local laws, ordinances, regulations and SFLC Standard Specification 0000. Notify the designated USCG representative (in writing) at least 5 days prior to removal of wastes and fluids. Document a complete chain of custody record of the removed contents and generated wastes, from the vessel to the point of destination or delivery. Submit document to the designated USCG representative upon completion of work. note Coast Guard personnel will operate all shipboard machinery and equipment 3.2 Boiler Pressure Testing 3.2.1 Test Plan. The Contractor must include a test plan that complies with the requirements of NBIC Part 2, Paragraph 4.3.1 in the proposal. Submit a CFR documenting any post-award changes to the hydrostatic test plan to the designated USCG representative for approval at least 2 business days prior to the proposed test date. The plan must address the following topics and be signed by all tech reps: Test pressure (Design Working Pressure is 150 PSI) Source and treatment of testing water Location and installation status of all blanks or valves that will hold pressure Air Removal Make, model and arrangement of pressurizing pump Date, time, and duration of hydrostatic test Data to be monitored and recorded during the testing 3.2.2 Execute the pressure test per plan in the presence of a Coast Guard Inspector. Submit a CFR documenting the results of the pressure testing and the associated data called out in the test plan. 3.2.3 The Inspection Tech Rep must be present for the hydro test. 3.2.4 Pressure test must not exceed the test design working pressure. 3.3 Fireside cleaning. The Contractor must disassemble the boiler sufficiently to allow complete access to the fireside for cleaning. The Contractor must mechanically clean the firesides of the boiler. Mechanically clean the surfaces of the tubes and the combustion chamber with a wire brush or other approved alternatives. Remove all debris. Vacuum and dispose of all soot in accordance with General Requirements. Figures 1 and 2 show the known damaged area 3.3.1 Prior to commencing mechanical cleaning, install containments to collect soot and airborne debris and conduct an initial inspection with a Coast Guard inspector to document existing condition. 3.3.2 Wire brush and clean the seating surfaces of all hand hole and manhole plates. 3.4 Inspection. Upon completion of cleaning and in the presence of a Coast Guard Inspector, the Contractor must visually inspect the fireside of the boiler with emphasis on the following items: Indications of broken refractory Soot deposits Pitting, cracking or corrosion on the water pipes. 3.4.1 The Contractor must reassemble the boiler to the as-found condition at the beginning of the contract accordance with all references in Section 2 of this work item. 3.4.1 Mud drum and steam drum gaskets must be renewed. 3.4.2 Disturbed insulation and sheathing must be renewed. 3.4.3 Submit a CFR detailing the damage and other issues found during the inspection, recommend corrective actions, and potential causes for these problems. 3.5 Touch-up preservation, general. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs).

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS