Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

USDA-Forest Svc Multi-Bridge Repair Kisatchie NF LOUISIANA

Awarded
12445126C0021Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The USDA Forest Service is awarding a contract for multi-bridge repair work within the Kisatchie National Forest in Louisiana, identified by solicitation number 12445126C0021 and NAICS code 237310 for Heavy and Civil Engineering Construction. This is a total small business set-aside under FAR 19.5, meaning only small business concerns are eligible to compete. The contract was posted on May 26, 2026, and performance will be centralized in the Kisatchie National Forest with a primary place of performance at zip code 71468 in Louisiana. The awarding office is the Csa East 11 Usda-Fs, under the Department of Agriculture, based in Atlanta, Georgia, with a mailing address of 30309-2449. Primary point of contact is Cynthia Granderson, reachable via email at cynthia.granderson@udsa.gov, with Adam Doyle as the secondary contact, reachable by phone at 573-917-0857 and email at adam.doyle@usda.gov. Further details and documentation are accessible through the official SAM.gov workspace link.

General Info

USDA Forest Service awards small business contract for bridge repairs in Kisatchie National Forest, Louisiana.

Agency

Department Of Agriculture → Csa East 11 Usda-FsView Agency

Contract Value

$412,708

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

LA, 71468, USA

Set-Aside

SBA

Awardee

DURABLE PILING RESTORATION, L.L.C.View Profile

Award Issued Date

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseAwarded
Awarded

Contract was awarded

Posted

award-notice

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa East 11 Usda-Fs
Contacts2 people available
OfficeAtlanta, GA, 303092449, USA
Organization / Agency
Department Of Agriculture → Csa East 11 Usda-Fs
View Agency Profile
Office AddressAtlanta, GA, 303092449, USA

Full Description

Show more
https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=4653a42a80df4a839f2c9c02fbb916a0

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in 2 months

DEADLINE

in 2 months
View Details