Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on April 20, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USNS ERICSSON - OVERHAUL #1 AC COMPRESSOR

Awarded
N40442-09-T-5367Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management and Training Corporation is soliciting lump sum fee proposals for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires a qualified contractor to provide all transportation, labor, materials, and equipment to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as needed. The contractor must perform all work according to manufacturer specifications and provide a final summary of diagnostic findings, an itemized list of replaced parts, and warranty documentation upon completion. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bids must be submitted via email to Angie Mahoney by 3:00 PM CST on November 3, 2026, and must include a bid sheet, proof of insurance, a completed supplier packet with a W-9, and applicable SBA certification letters. Award decisions will be based on best value, with a focus on administrative compliance and technical qualifications. The contract is subject to various Federal Acquisition Regulations, including standards for combating trafficking in persons, Buy American restrictions, and Service Contract Labor Standards per Wage Determination 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 6 hours ago

DEADLINE

in about 2 months
NAICS: 811310
New
SLED
Roseville Electric Utility – Gas Compressor Maintenance
Solicitation # 07-137
The City of Roseville is soliciting proposals for Gas Compressor Maintenance Services to support the Roseville Energy Park and the Roseville Energy Center and RPEAK. The selected contractor will provide all labor, supervision, technical expertise, specialized tooling, equipment, and materials necessary for both scheduled preventive and corrective maintenance on natural gas compressors, specifically Gas Packagers and Ariel models, and their associated auxiliary systems. The contract is intended to run for an initial term of five years, with services estimated to commence in April or May. This is a prevailing wage project requiring adherence to all fair employment laws, with certified payroll required for contracts exceeding 25,000 dollars. The successful proposer must provide a 100 percent Faithful Performance Bond and a 100 percent Labor and Materials Bond. Proposals are due by December 17, 2026, and must include a Proposer’s Certification, a Non-collusion Declaration, a Levine Act Disclosure Statement, and proof of active registration with the California Secretary of State. Award will be made to the responsible proposer determined to be the most advantageous to the City through a formal evaluation panel process. Invoicing is to be submitted monthly, delineated by task and personnel, with payment terms set at 30 days following receipt of satisfactory services.
City of Roseville

POSTED

about 6 hours ago

DEADLINE

in about 2 months

General Info

Contract Value

$112,200

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

BLDG 6060 NAVAL STATION, SANTA RITA, GUAM, VA, 96915, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Military Sealift Flt Supp Command Norf
Contacts2 people available
OfficeNORFOLK, VA, 23511, USA
Office AddressNORFOLK, VA, 23511, USA
Contacts
Cheryl SomersContract Specialist
Diane C. KruegerDeputy Director, Contracts

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format prescribed in Subpart 12.6 of the Federal Acquisition Regulation (FAR), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. The solicitation number is N40442-09-T-5367, and it is being issued as a request for quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-29. NAICS 811310 applies. The Small Business Competitiveness Demonstration Program is not applicable. Military Sealift Fleet Support Command (MSFSC), Norfolk, VA intends to award a firm fixed price purchase order for the USNS Ericsson for the following: 1.0 ABSTRACT 1.1 This item describes the requirements to provide an OEM's Authorized Manufacturer's Representative to provide repair parts, repair and Operationally Test the ships No. 1 Air Conditioning (AC) compressor and associated equipment. 2.0 REFERENCES/ENCLOSURES 2.1 REFERENCES 2.1.1 Technical Manual, Air Conditioning-Chilled Water-Heating and Refrigeration Units. NAVSEA T6230-AS-MMC-010 (Available onboard ship) 2.2 ENCLOSURES: None 3.0 ITEM LOCATION/DESCRIPTION 3.1 LOCATION/QTY 3.1.1 LOCATION - Engine Room, Fr. 2-63-2 3.1.2 QTY - One (1) Air Conditioning Compressor 3.2 DESCRIPTION 3.2.1 Quarters Area Packaged Water Chilling - Unit, reciprocating, single acting, direct motor driven unit. Condenser, receiver, and heat exchanger mounted on a common base, complete with pressure and temperature control switches, and "King" solenoid valve. 3.2.1.1 Mfr.: Carrier Air Conditioning Co. Syracuse, NY Single System Charge: 283 lb. Refrigerant (R-134A) Compressor: Model: 5MH126-452 Capacity: 75 Tons at 32.4 deg F saturated suction and 110 deg F condensing temperature. No. of cylinders: 12 Bore: 3-1/4" Stroke: 3-7/8" Speed: 1750 rpm Motor: HP: 100 Volt: 440 VAC Phase: 60 cycle Speed: 1750 rpm Condenser: Model No: 90C01-3274 No. of Tubes: 100 Tube Size: 3/4" OD x .035" Wall Effective Cooling Surface: 537 Sq. Ft Cooling Water Quantity: 280 GPM Receiver: Assembly No: 90C01-6253 Shell Dia: 10-3/4" OD Overall Length: 98" Mounting: Horizontal Capacity: 283 lb. Refrigerant (R-134A) Heat Interchanger: Assembly No: 90C01-1064 Shell Dia: 8-5/8" OD Overall Length: 31-15/16" Connections: 1-5/8" I.D. Liquid 4-1/8" I.D. Suction Compressor Control Switches (CARRIER) High Pressure Cut Out: HK02UA300B Low Pressure Cut Out: HK02UB050B Oil Pressure Safety: 90C01-1061-46 Water Pressure Failure: 90C01-4962 Temperature Control Switches Operating thermostat Mfg.: Detroit Carrier P/N: 90C01-6842-1 Model: 400 Range: +25 deg to +90 deg F Differential: 1.5 to 2 deg F Low Limit thermostat Mfg.: Detroit P/N: 2506568RL Range: 10 to 60 deg F Water Regulating Valve Carrier P/N: 90c01-3113 Water connections: 3" ANSI flanged 3.2.1.1.1 Required Material to be provided by the Government 4 EA. HAND HOLE COVER GASKET 5H40 1042 P12 1 EA. BEARING, CENTER 5H80 1242 1 EA. SHAFT SEAL ASSEMBLY 5H120 732 1 EA. MAIN BEARING 6L80 2172 1 EA. PLUG GASKET AU51YA011 P12 1 EA. CONTROL OIL STRAINER 5H120 3301 1 EA. CHAMBER COVER GASKET 5H120 3341 P12 1 EA. CAP/SCRW GASKET SURGE CHAMBER AU41YA005 P12 1 EA. HYDRAULIC RELAY GASKET 5H120 3351 P12 1 EA. OIL PUMP PACKAGE 5H120 A773 1 EA. CAPACITY CONTROL VALVE 5H40 2201 P12 GASKET INNER 1 EA. CAPACITY CONTROL VALVE 5H40 1411 P12 GASKET OUTER 1 EA. CENTER BEARING 5H120 1242 1 EA. HOUSING GASKET 5H120 4482 1 EA. OIL FILTER PACKAGE 5H120 351 4 EA. SUCTION MANIFOLD GASKET 5H120 4462 1 EA. MAIN BEARING SEAL END 5H40 1012 8 EA. CYLINDER GASKET BOTTOM 5H40 1711 P12 8 EA. CYLINDER GASKET TOP 5H40 1701 P12 8 EA UNLOADER BRACKET GASKET 5H40 1451 8 EA PISTON RING PACKAGE 5H46 481 1 EA VALVE PLATE PACKAGE 5H46 120A 4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES 4.1 GOVERNMENT FURNISHED EQUIPMENT - None 4.2 GOVERNMENT FURNISHED MATERIAL 4.2.1 Compressor oil and Parts listed on paragraph 3.2.1.1.1. 4.3 GOVERNMENT FURNISHED SERVICES - None 5.0 NOTES: 5.1 All work and repair parts procured as stipulated in this Service Order Request, shall be accomplished by an OEM's Authorized Manufacturer's Representative. 6.0 QUALITY ASSURANCE: None additional 7.0 STATEMENT OF WORK REQUIRED 7.1 Ensure that all pertinent machinery, valves and circuit breakers are Secured and - Tagged IAW MSC Procedures before commencing with this Work Item. 7.2 Pump down the system and remove refrigerant (R-134A) for reuse. 7.3 Drain the cooling waterside of the condenser. 7.3.1 Remove the condenser inlet and outlet water chest heads. 7.3.2 Mechanically clean condenser tubes, using rotating soft, flexible brass or nylon bristle tube cleaning brushes. Flush water through tubes during cleaning. Take care not to destroy the thin protective film of corrosion resistant products on the inner surfaces of tubes. 7.3.3 Pressure Test the condenser shell IAW the requirements of Ref. 2.1.1. Inspect with a halide torch or an electronic type leak detector for tube leaks. Submit an "As Found" Condition Report. 7.3.3.1 Include in Price Quote the cost to re-roll (20) leaking tubes. 7.3.4 Clean the condenser heads and tube sheet mating surfaces. 7.3.5 Reinstall condenser heads using proper gaskets. 7.3.6 Re-connect water lines utilizing proper gaskets and flush the condenser to remove any sediment. 7.3.7 Conduct a hydrostatic test with fresh water on the tube side of the condenser IAW the requirements of Ref. 2.1.1. Install temporary bolting to secure the tube sheets to the condenser shells after the removal of the inlet and outlet and return ends of the condensers to prevent separation under Freon pressure tests. 7.4 Remove from ship to shop (1) condenser Water Regulating valve. 7.4.1 Disassemble, clean and inspect all parts. Submit an "As Found" Condition Report. Repair as required. 7.4.2 Reassemble the Water Regulating Valve and Hydro Test to l50 Psig. 7.4.3 Reinstall the Water Regulating valve in its parent location using CRES fasteners. 7.5 Disassemble the Thermal Expansion Valve. 7.5.1 Clean and inspect all parts. Submit an "As Found" Condition Report. Replace parts as required. 7.5.2 Reassemble and reinstall. 7.6 Disassemble each solenoid valve. 7.6.1 Clean and inspect all parts. Submit an "As Found" Condition Report. 7.6.2 Reassemble and reinstall each solenoid valve. 7.7 Uncouple the No. 3 Air Conditioning Compressor from its drive motor. Note: Accomplish the below listed work either onboard or in a Repair Shop. If the compressor is conveyed to a repair shop install temporary blanks on the suction and discharge valve flange's where disconnected from each compressor. 7.7.1 Drain and discard the compressor's crankcase oil. 7.7.2 Disassemble each compressor IAW Ref. 2.1.1. Clean all components and inspect for damage. Take and record all measurements utilizing Table 5.4 of Ref. 2.1.1 for guidance, in a format which will provide comparison data based on the dimensional data shown in the table. Specify the serial number of the compressor being inspected. 7.7.2.1 Submit an "As Found" Condition Report. 7.7.3 Furnish material as described in Par. 3.2.1.1.1 and utilize in rebuilding the No. 1 AC Compressor. 7.7.4 Reassemble/reinstall No. 1 AC Compressor in its parent location using new coupling assembly. 7.7.5 In the presence of the MSCREP and the Chief Engineer prove proper alignment between the compressor and motor - to within .003 IAW Ref. 2.1. Alignment to be accomplished using dial indicators. Drill, ream and install stainless steel taper pins to lock alignment. Contractor estimate shall provide for reshimming the compressor. 7.8 Evacuate and dehydrate the entire refrigerant piping systems using a vacuum pump which will produce at least .2" Hg absolute. 7.8.1 Furnish and install new dryer cartridges in the Air Conditioning Unit. 7.9 Charge the complete Air Conditioning Plant with the refrigerant (R-134A) removed under Par. 7.2 and refill No. 1 AC Compressor using oil as designated in Par. 4.2.1. 7.10 After completion of all work, replace insulation and lagging, including removable pads, on piping and components removed or disturbed in this item. 7.11 In the presence of the MSCREP and the Chief Engineer adjust and set (IAW Ref. 2.1.1) all Temperature, Pressure and Safety Cut-Out Switches. 7.11.1 Accomplish a pressure and leak test IAW Ref. 2.1.1 on the entire refrigerant piping systems using refrigerant R-134A and dry nitrogen. Test high pressure side IAW Ref. 2.1.1. Test for leaks with an electronic or halide leak detector. Prior to test remove rupture or bursting discs and blank openings. Upon completion of test replace discs. 7.12 Conduct a pull-down operational test of No. 1 Air Conditioning Compressor and associated auxiliary components. Take and record temperature and pressure readings to ensure that all components are operating properly. 7.12.1 Conduct a full and complete 48 Hr. Operational Test of the No. 1 Air Conditioning Compressor and associated auxiliary components. 7.13 Prep, prime and paint all new and disturbed areas to match surrounding. 7.14 Manufacturer's Representative 7.14.1 OEM Technical Representative per Par. 5.2. 7.15 Preparation of Drawings: None 8.0 GENERAL REQUIREMENTS: None Additional 3. VESSEL AVAILABILITY: 29 JUNE 2009 TO 29 JULY 2009 4. VESSEL LOCATION: AGANA, GUAM 5. PERIOD OF PERFORMANCE: 29 JUNE 2009 TO 29 JULY 2009 The following FAR provisions and clauses apply to this solicitation and are incorporated by reference: 52.204-7 Central Contractor Registration; 52.211-6 Brand Name or Equal 52.212-1 Instructions to Offerors-Commercial Items; 52.212-3 Offeror Representations and Certifications-Commercial Items Alternate I The offeror has completed the annual representations and certification electronically via the ORCA website at http://orca.bpn.gov . After reviewing the ORCA database information, the offeror verifies by submission of this offer that the representation and certifications currently posted electronically at FAR 52.212-3, Offeror Representations and certifications'Commercial Items, have been entered or updated in the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference); 52.212-4 Contract Terms and Conditions-Commercial Items; Addendum to 52.212-4 (q) Other Compliances applies: Federal Law and regulation require Government contractors to possess appropriate insurance coverage for their employees. The Government reserves the right to request evidence of appropriate insurance, including Longshoreman's and Harbor Workers' Compensation Act (LHWCA) coverage required to perform work on or near ships. (33 U.S.C. S903(a). All policies shall contain an endorsement stating that any cancellation or material change in the coverage adversely affecting the Government's interest shall not be effective unless the Contractor provides written notice of the same to the Contracting Officer. Within 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders the following clauses apply and are incorporated by reference: 52.219-28 Post-Award Small Business Program Representation. 52.222-3 Convict Labor, 52.222-19 Child Labor - Cooperation with Authorities and Remedies, 52.222-21 Prohibition of Segregated Facilities, 52.222-26 Equal Opportunity, 52.222-36 Affirmative Action for Workers with Disabilities, 52.222-50 Combating Trafficking in Persons 52.225-13 Restrictions on Certain Foreign Purchases, and 52.232-33 Payment by Electronic Funds Transfer --Central Contractor Registration; and The following Defense FAR Supplement (DFARS) provisions and clauses apply to this solicitation and are incorporated by reference: 252.204-7004 Required Central Contractor Registration. Alternate A; 252.211-7003 or 252.211-7003 Alternate I Item Identification and Valuation; Within DFARS 252.212-7001 Contract Terms and Conditions Required To Implement Statutes or Executive Orders Applicable to Defense Acquisitions of Commercial Items the following clauses apply and are incorporated by reference: 252.225-7001 Buy American Act and Balance of Payment Program, 252.225-7000 Buy American Act--Balance of Payments Program Certificate, 252.232-7003 Electronic Submission of Payment Requests; and 252.247-7023 Transportation of Supplies by Sea Alternate III. The following additional clauses apply: 52.215-5 Facsimile Proposals: +1 (555) 000-0000. The following numbered notes apply to this requirement: None. At a minimum, responsible sources shall provide the following: a price proposal which identifies the requested item, with its unit price, extended price, total price, prompt payment terms, remittance address, Tax I.D. #, Duns #, and Cage Code. Responses to this solicitation are due by 30 April 2009 @0900 A.M. Offers can be emailed to contact@example.gov or faxed to the above number. Reference the solicitation number with your quote.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS