Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USS SEAWOLF SSMG

Closed
N4523A25R0812Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation is soliciting proposals for the complete repower of a 30 foot Munson landing craft. The selected contractor will be responsible for the decommissioning and removal of two existing Honda BF250A outboard engines and the procurement and installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing structural transom inspections, the installation of Honda iST electronic control heads at dual helm stations, integration with the SeaStar Power Assist steering system, and a comprehensive fuel system overhaul using USCG Type A1-15 lines. The project concludes with NMEA 2000 network integration, digital gauge installation, and a minimum two hour sea trial to validate performance and safety protocols. To ensure factory warranty coverage, the contractor must maintain active Honda Marine Authorized Dealer or Service Center status. The vessel will be delivered via trailer to the contractor facility, which must provide a secure, fenced yard or indoor shop. Award evaluation is based on a weighted criteria of cost, technical expertise, and TERO status, with a preference for Colville Business Enterprises. Proposals must be submitted in PDF format by November 13, 2026. Final contracts are subject to tribal appropriation and may require a performance bond for values exceeding 100,000 dollars or a 25 percent retainage.
Confederated Tribes of the Colville Reservation

POSTED

about 5 hours ago

DEADLINE

in 24 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Bremerton, WA, USA

Set-Aside

NONE

Documents

1

Statement of Work - #2 Ship’s Service Motor Generator (SSMG) Refurbishment

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

special-notice

Notice updated

Notice type changed from Contract Update to Special Notice. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense
Contacts2 people available
OfficeN/A
Organization / AgencyDepartment Of Defense
Office AddressN/A
Contacts
Andrew Skelley

Full Description

Show more
THIS NOTICE OF INTENT IS NOT A REQUEST FOR QUOTES. A DETERMINATION NOT TO COMPETE THE PROPOSED PROCUREMENT BASED UPON RESPONSES TO THIS NOTICE IS SOLELY WITHIN THE DISCRETION OF THE GOVERNMENT. Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS& IMF) hereby provides notice of its intent to award a sole-source, firm fixed price contract, to Amee Bay, LLC. A Justification and Approval has been prepared. The period of performance is estimated to be May 2025 to June 2025. PSNS & IMF requires an in-place refurbishment and testing of #2 Ships Sercive Motor Generators (SSMG) to OEM specifications. THIS NOTICE OF INTENT IS NOT A REQUEST FOR COMPETITIVE QUOTES. However, interested parties may identify their interest and capabilities, in a quote. To do so, respond to this requiremnt no later than 09 May, 2025 12:00 PM, PST. A determination not to compete this requirement, based upon responses to this notice, is solely within the discretion of the Government. Information received will normally be considered soley for the purpose of determining whether to conduct a competitive procurement. PSNS & IMF will NOT be responsible for any costs incurred by interested parties in responding to this notice of intenet. Only written responses will be considered. As a result of analyzing responses to this notice of intent, thte Government shall determine if a solicitation will be issued. Any prospective contractor must be registered in the System for Award Management (SAM) in order to be eligible for award. Interested parties are encouraged to furnish information by email only with "RESPONSE TO INTENT TO SOLE SOURCE FOR N4523A25R0812 SSMG" in the subject line. All documents submitted will not be returned. All interest parties shall submit clear and convincing documentation demonstrating their capabilities to satisfy the requiremnts listed above to Carly Stotts, Contract Specialist, by email at carly.j.stotts.civ@us.navy.mil. The capability documentation should include general information and technical background describing in detail the prospective contractor's capabilities and experience that will demonstrate the ability to support these requirments.

More opportunities from Department Of Defense

Same awarding agency

NAICS: 332812
New
Federal
Area of Interest (AoI) – Metal Cleaning and Finishing Services
Solicitation # W911KF25SC002-AoI0016
The Army Contracting Command Anniston Army Depot is seeking innovative commercial solutions for depot-level metal cleaning, surface preparation, and finishing services for combat vehicle components. This requirement, issued under solicitation W911KF25SC002-AoI0016, encompasses chemical stripping, alkaline immersion cleaning, and abrasive media cleaning to remove paint, corrosion, scale, and carbon. The scope includes a wide array of plating and coating processes such as anodizing, chromate conversion, black oxide, electroless nickel, hard chrome, zinc, tin, copper, and phosphate. The government anticipates utilizing a Multiple Award Task Order Contract structure to ensure technical redundancy and coverage. Key performance requirements include a strict seven-working-day turnaround time and the contractor's responsibility for the secure pick-up and delivery of parts to and from the depot in Alabama. Offerors must demonstrate significant facility capabilities, including specific tank and oven dimensions, crane clearances, and the capacity to handle high-volume part streams of varying sizes. A rigorous quality assurance approach is mandatory, requiring the ability to perform various ASTM and MIL-SPEC tests, such as salt spray, adhesion, and hydrogen embrittlement, either in-house or through certified laboratories. Evaluation will be based on technical feasibility, the safety and efficiency of cleaning methods, innovation in eco-friendly processing, and the robustness of quality control systems. Additionally, the government will assess the offeror's track record with hazardous material management and compliance with environmental regulations. Interested parties must submit a written Solution Brief by October 28, 2026, including a Rough Order of Magnitude or unit pricing structure for evaluation.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details
NAICS: 541330
New
Federal
Army Contracting Command – Red River Army Depot (ACC-RRAD) Organic Industrial Base (OIB) Modernization Commercial Solutions Opening (CSO)
Solicitation # W911RQ-27-S-C001
The Army Contracting Command – Red River Army Depot (ACC-RRAD) has issued Commercial Solutions Opening (CSO) W911RQ-27-S-C001 to modernize its Organic Industrial Base (OIB). This initiative focuses on Convergent Manufacturing, seeking innovative commercial items, technologies, and services in areas such as digital twins, automation, cyber security, and agile facilities to enhance the Defense Manufacturing Base. The CSO utilizes a streamlined acquisition process authorized by DFARS Subpart 212-70, allowing both traditional and non-traditional defense contractors to compete for FAR Part 12 commercial item contracts. The overall solicitation remains open until September 30, 2027, with a general period of performance for awarded solutions typically not exceeding 12 months. The procurement is executed through specific Areas of Interest (AoIs), which have included requirements for micro trucks, industrial parts washer leasing and maintenance, and fire suppression system repairs for Building 431. The evaluation process is conducted in three phases: an initial solution brief, a presentation or pitch, and a final Commercial Solutions Proposal. Technical evaluations prioritize responsiveness to the AoI, technical merit, and innovation, while price proposals must be determined as fair and reasonable. Awardees must be registered in the System for Award Management (SAM) and possess a Unique Entity ID. Specific project requirements may include strict adherence to military marking standards, environmental liability insurance, and certification by registered professional engineers.
Engineering Services

POSTED

1 day ago

DEADLINE

in 12 months
View Details
NAICS: 541330
New
Federal
AIR FORCE CRYPTOLOGIC OFFICE COMMERCIAL SOLUTIONS OPENING
Solicitation # FA7037-21-S-C001
The Air Force Cryptologic Office Cyberspace Intelligence Surveillance and Reconnaissance and Multi-Domain Innovation Division is soliciting innovative commercial capabilities through Commercial Solutions Opening FA7037-21-S-C001. The agency is seeking mature technologies and services in Electromagnetic Warfare, Information Operations, and electromagnetic digital communications, with a specific goal of achieving a field demonstration within one year. This effort emphasizes the use of novel material approaches and innovative services, including a recent update to incorporate Super Intelligence. Awards may be issued as contracts or Other Transactions with periods of performance typically ranging from one to five years. The procurement follows a competitive two-phase submission process governed by 10 USC 3458 and DFARS 212.70. Phase I requires the submission of Quad Charts and White Papers, which are evaluated based on technical merit, importance to the AFCO mission, and fund availability. Offerors who are determined to be technically qualified may be invited to submit full Phase II proposals, including a detailed Statement of Work and a price proposal. All submissions are treated as commercial items, and offerors must possess the necessary personnel and facility security clearances to handle classified work in accordance with the National Industrial Security Program Operating Manual.
Engineering Services

POSTED

5 days ago

DEADLINE

in 11 months
View Details
NAICS: 236220
New
Federal
EIE485 Consolidated Munitions on Quarry Hill, Eielson AFB, AK
Solicitation # W911KB27RWP04
The U.S. Army Corps of Engineers, Alaska District, is conducting market research for project EIE485, which involves the consolidation of munitions storage functions at Eielson Air Force Base, Alaska. The project scope includes the design and construction of new munitions storage facilities at Quarry Hill, including a warm storage vehicle facility, and the demolition and debris removal of 12 existing facilities at Engineer Hill. All designs must strictly adhere to Air Force Standard Designs, specifically Defense Explosives Safety Regulation 6055.09 and Air Force Manual AFMAN 91-01 Explosives Safety Standards. The target budget for this effort is approximately 196.4 million dollars. The anticipated period of performance spans from fiscal year 2027 to 2031, with design work beginning in FY27 and construction starting no earlier than FY29. The government is currently evaluating the most effective project delivery method and contracting vehicle, considering options such as Accelerated Design-Build to Budget via a FAR-based approach or Other Transaction Authority vehicles like Construction Manager at Risk or Progressive Design-Build. Key project challenges identified for industry feedback include site constraints such as permafrost and PFAS. The government is seeking input from a wide range of socioeconomic business categories to determine the optimal acquisition strategy and evaluation criteria, focusing on technical approach, past performance, and team integration.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS