Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on October 14, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Utilities John Young Parkway 20-Inch High-Density Polyethylene Replacement

Closed
Y25-714State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221112
Federal
SPE60427R0400 - MISO 2027
Solicitation # SPE60427R0400
Solicitation SPE60427R0400 is a request for proposal issued by DLA Energy for a Firm Fixed-Price Requirements Type contract to supply electricity, including ancillary and incidental services, to various Department of War and Federal Civilian facilities within the Midcontinent Independent System Operator (MISO) market area. The scope covers four specific locations: the Army Corps of Engineers, Scott Air Force Base, the US Department of Agriculture-National Center for Agriculture Utilization Research, and the Illinois Air National Guard. The contract features a 24-month delivery period starting from the May 2027 meter read date through the May 2029 meter read date, with a total estimated quantity of 240,033,144 kWh across four contract line item numbers. The award will be based on the best value, considering price and non-price factors. Past performance is the most critical non-price factor, followed by technical capability and risk, and finally small business participation. Price is weighted approximately equal to the combined non-price factors. Proposals must be submitted through the PIEE Solicitation module, and pricing will be handled via a reverse auction at a later date. Offerors must maintain active SAM registration and provide a Unique Entity Identifier and CAGE code. The contract incorporates standard commercial terms under FAR 52.212-4 and includes specific requirements for HUBZone and small business preferences, as well as Buy American and domestic commodity certifications.
DLA Energy

POSTED

20 days ago

DEADLINE

in 20 days
NAICS: 221112
SLED
Northtown Backup Generating Facility
Solicitation # 25-SPPE-02
The Northtown Backup Generating Facility is a 97.3 megawatt diesel-fired emergency power system designed to provide uninterrupted backup power exclusively to the Northtown Data Center in San José, California, without any connection to the transmission or distribution grid. Located on a 28.5-acre site at the southwest corner of West Trimble Road and Orchard Parkway on APNs 101-02-018 and 101-02-021, the facility will consist of 42 diesel generators—40 rated at 3 megawatts each and two smaller units at 1.75 megawatts—arranged in two generation yards adjacent to the data center buildings. Of the 3-megawatt units, eight are designated as redundant to ensure reliability. The two smaller generators will support office loads, building systems, and life safety services. The facility will include a new 115-kilovolt to 34.5-kilovolt, 110-megavolt-ampere electrical substation with a two-bay, two-transformer design, allowing one transformer to be taken offline without loss of service, effectively providing 105 megavolt-amperes of redundancy. On-site diesel fuel storage capacity is 234,000 gallons, and the generators will operate using renewable diesel fuel to minimize emissions and comply with sustainability mandates. The project is subject to comprehensive environmental review under the California Environmental Quality Act and requires permits from the Bay Area Air Quality Management District, the City of San José, the California Department of Fish and Wildlife, and the Federal Aviation Administration for structure height compliance. It must also participate in San José Clean Energy’s Total Green program to ensure 100 percent carbon-free electricity use. The California Energy Commission is the lead agency overseeing the project and has determined it qualifies for an exemption under Public Resources Code §25541. All generators must meet Tier 4 emissions standards with controls for nitrogen oxides and diesel particulate matter. Environmental mitigation measures include noise reduction, wildfire risk management, and protection of biological and cultural resources, with preconstruction surveys mandated. The project is currently in the environmental review phase, with a public comment period scheduled from July 21 to August 20, 2026. No procurement or contract pricing details are available, and while the project is not governed by federal acquisition regulations, compliance with state and local environmental, zoning, and safety codes
Energy Commission

POSTED

4 months ago

DEADLINE

N/A

AI Contract Overview

Show more

Orange County, Florida is soliciting sealed bids for the replacement of a 20-inch high-density polyethylene utility pipeline along John Young Parkway, with the project estimated at approximately 2.8 million dollars. Bidders must submit their responses electronically through the OpenGov e-Procurement Platform by 5:00 pm EST on November 19, 2024, and are prohibited from submitting bids via hand delivery, mail, fax, or email. The procurement process emphasizes the importance of timely electronic submission, with detailed instructions provided for creating an account and uploading bids, and support available through OpenGov technical assistance. Questions regarding the solicitation must be submitted by November 5, 2024, through the OpenGov Q&A module, and all responses, clarifications, and modifications will be issued as written addenda, which will be available for download. The contract is managed by the Orange County Procurement Division, with Rochelle Chambers serving as the primary contact. The project falls under NAICS code 221112 and is part of the county’s efforts to upgrade its utility infrastructure, with the entire process governed by strict deadlines and procedural requirements to ensure transparency and fairness.

Documents

3
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Orange County Administrative Service, Procurement Division
Contacts1 person available
OfficeN/A

Full Description

Show more
NOTICE IS HEREBY GIVEN that Orange County, Florida, henceforth referred to as the County is accepting sealed bids for Utilities John Young Parkway 20-Inch High-Density Polyethylene Replacement (Y25-714)Sealed offers for furnishing the above will be accepted up to 5:00 pm EST on Tuesday, November 19, 2024.The Estimated Cost for this project is $2,805,000.00NOTE: Respondents are required to submit responses electronically via the OpenGov e-Procurement Platform. Respondents shall not be permitted to hand-deliver, mail, telephone, fax or email offers.Responses received after the submission deadline and/or transmitted outside of the designated OpenGov e-Procurement Platform shall be rejected.Important Instructions for Electronic SubmittalThe County is ONLY accepting electronic bid submissions using the OpenGov e-Procurement Platform. Respondents shall create a FREE account with OpenGov by signing up at https://procurement.opengov.com/login Once you have completed account registration, browse back to this page, click on Submit Response, and follow the instructions to submit the electronic bid.It is the respondent's responsibility to ensure they commence their upload efforts timely to meet the submission deadline. The County shall not be responsible for delays caused by any occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties.OpenGov Technical SupportFor Technical Support, respondent's can reach the OpenGov Service Desk:Chat (preferred): Click the button in the lower right hand corner of the portal Email: Sign up to see this detail: Sign up to see this detail Hours: Mon-Fri 7am - 10pm ESTTimely Questions Regarding this SolicitationThe question and answer module of OpenGov IS being utilized for this solicitation. Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions: Tuesday, November 5, 2024 at 5:00 pm EST. Respondents are instructed not to contact the initiating division directly.Consideration for modification or alteration of the documents contained in this solicitation shall be requested during the specified question period, before the applicable deadline. No oral interpretation of the meaning of the plans, specifications, or other Contract documents shall be considered binding. The County shall be bound by information and statements only when such statements are written and executed under the authority of the Manager, Procurement Division.Answers for timely questions will be addressed in the OpenGov question and answer module or as an addenda to this solicitation depending on volume, participants are encouraged to subscribe as a follower and monitor all notifications. Beyond questions and answers, any and all modifications, clarifications, interpretations and supplemental instructions will be in the form of a written addendum which, if issued, will be available for download. All addenda and questions/answers so issued shall become part of the Contract Documents and receipt shall be acknowledged as specified herein.This provision exists solely for the convenience and administrative efficiency of Orange County. No respondent or other third party gains any rights by virtue of this provision or the application thereof, nor shall any respondent or third party have any standing to sue or cause of action arising there from.Untimely questions are unable to be submitted in the question and answer module, thereafter respondents raising critical concerns must email Sign up to see this detail. Critical clarifications may be made via addenda, however, untimely questions may not be considered.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS