Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Arizona was posted on January 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Utility Adjustment and Conflict Mitigation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
This contract, titled ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction, involves providing Davis Bacon construction services for the Federal Aviation Administration's Pavement Research and Development Section at the William J. Hughes Technical Center in Atlantic City, NJ. The scope of work includes the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs and pavement structures measuring approximately 310 feet by 52.5 feet with a thickness of 15.5 inches. The project requires the provision of aggregate subbase, updates to the asphalt base course for a stabilized drainable base, and the performance of material characterization tests such as California Bearing Ratio and Plate Load tests. The subcontractor is responsible for procuring materials, managing waste disposal, and providing professional testing laboratory and geotechnical engineering services. Work is generally scheduled for normal business hours, Monday through Friday, from 6:00 a.m. to 6:00 p.m., with occasional after-hours or weekend work as needed. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB).
Parsons Corporation

POSTED

about 1 hour ago

DEADLINE

in 2 months
NAICS: 237130
New
SLED
Pre-Qualification: Overhead Contact System (OCS) Rehabilitation Project Phase 4A – Tasman West/East
Solicitation # C26152F
The Santa Clara Valley Transportation Authority (VTA) is soliciting pre-qualifications for the Overhead Contact System (OCS) Rehabilitation Project Phase 4A – Tasman West/East (Contract C26152F). This project involves the detailed engineering design, procurement, and installation of new 300 kcmil contact wire, registration insulators, and surge arresters on Tasman Drive and East Java Drive. The estimated construction cost is between $1.7 million and $2.3 million. Work will be performed in an active light rail operating environment, requiring strict adherence to VTA safety procedures and close coordination to minimize impacts on the LRV wash facility. To be eligible to bid, firms must be approved through a pre-qualification process by submitting a qualification questionnaire and a Statement of Qualifications (SOQ) via the OpenGov portal by December 14, 2026. Key requirements include having successfully installed at least 5 miles of OCS for a mainline electrification railroad or urban transit system within the last 10 years, with each contract valued at a minimum of $800,000. Management and supervisory personnel must also possess similar experience. Bidders are evaluated using a scoring matrix; those scoring below 55 are disqualified, while those scoring 56 to 72 may require additional interviews. Once pre-qualified, the final contract will be awarded to the lowest responsive and responsible bidder.
Engineering and Program Delivery

POSTED

about 15 hours ago

DEADLINE

in 25 days
NAICS: 237130
New
Federal
Robins RAPID Construction OTA Progressive Design Build Fiber Replacement
Solicitation # FA8501-27-RAPID-CIRCUIT-F1-170129-OTA
The Department of the Air Force, 78th Civil Engineer Group at Robins Air Force Base, Georgia, is seeking solution briefs for an Other Transaction Agreement (OTA) to replace Circuit F-01 from the Fowler Substation. This project utilizes a Progressive Design-Build (PDB) approach under the RAPID umbrella framework and the statutory authority of 10 U.S.C. § 2808a. The scope of work involves the complete replacement of 15kV, 500MCM cabling, the removal and replacement of broken breakers or deteriorated cable racks, the installation of new bell ends on conduits, and the pumping of water and dirt from manholes. The project is estimated to have a construction magnitude between $5 million and $10 million. The project is divided into two phases: Phase 1 focuses on preconstruction, collaborative design development to 65%, and the establishment of an open-book Guaranteed Maximum Price (GMP) over a target timeline of six months. Phase 2 involves final design and full construction execution with a target timeline of 14 months from the project start. Selection is based on a two-step Qualifications-Based Selection (QBS) process where price is not evaluated in the initial stage. The government requires the Design-Builder to demonstrate at least five years of experience in projects of comparable size and complexity, specifically focusing on work in occupied facilities and congested site logistics. There is no set aside used for this requirement.
FA8501 Opl Contracting Afsc/pzio

POSTED

about 20 hours ago

DEADLINE

in about 12 hours
NAICS: 237130
New
Federal
N6247327R0006 Project Labor Agreement Request for Information
Solicitation # N6247327R0006
The P283 Electrical Infrastructure, On-Site Generation, and Microgrid Improvements project at Marine Corps Air Station Miramar in San Diego, California, is a comprehensive modernization and expansion effort managed by NAVFAC Southwest. The scope involves the design, procurement, construction, testing, and commissioning of a Microgrid Control System (MCS) and Utility Control Systems (UCS/SCADA) to enable seamless transitions between grid-connected and islanded modes. Key infrastructure upgrades include the modernization of the 12kV electrical distribution system, the deployment of a unified fiber-optic loop, and the replacement of SF6 gas switches with non-SF6 alternatives. The project also expands on-site generation through the integration of a 1.6 MW / 1.8 MWh Battery Energy Storage System (BESS) and a 1,000 kW solar photovoltaic expansion. A critical component of the project is the achievement of a Department of Defense Risk Management Framework (RMF) Authority to Operate (ATO) for all installed industrial and facility-related control systems, adhering to DoDI 8500.01, DoDI 8510.01, and UFC 4-010-06 standards. The contractor must also ensure BESS fire protection complies with NFPA and UFC codes, manage San Diego Air Pollution Control District permitting, and coordinate interconnection agreements with San Diego Gas & Electric in accordance with California Rule 21. This effort is currently in the market research phase via a Sources Sought Notice under NAICS 237130, with an anticipated firm-fixed-price contract and a performance period of 920 days.
Navfacsyscom Southwest

POSTED

about 20 hours ago

DEADLINE

in 14 days
NAICS: 237130
New
SLED
SEALED RFP -OUTDOOR WARNING SIREN IMPLEMENTATION PHASE II
Solicitation # Procurement #165064
The Cherokee Nation is seeking sealed proposals for the implementation of Phase II of its Outdoor Warning Siren system. The project involves providing all labor, materials, engineering, and project management to deploy a modern, resilient, and IPAWS-compliant outdoor warning system across the 14 county jurisdictional area of the Cherokee Nation in northeast Oklahoma. The system must be interoperable and utilize multiple communication pathways, including spread-spectrum radio, IP, cellular, and satellite communications to ensure reliability across varied terrain. Key deliverables include a comprehensive Standard Operating Plan, FEMA-compliant Environmental and Historic Preservation documentation, and updated siren coverage maps and as-built drawings. The contract performance period runs from the date of final signature through September 30, 2027. Proposals must be submitted by December 18, 2026, and will be evaluated based on a composite score, with a preference granted to vendors providing proof of certification from the Cherokee Nation Tribal Employments Office (TERO). Awardees must possess a valid Oklahoma Business License and maintain comprehensive insurance coverage, including general, professional, pollution, and automobile liability. The contract is governed by United States law and maintains the Cherokee Nation's sovereign immunity. Compensation will be based on negotiated prices or rates identified in the proposal.
Cherokee Nation

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 237130
New
SLED
Underground Utility District 38 Overhead-to-Underground Service Conversions
Solicitation # CS 09-26-07
Alameda Municipal Power (AMP) is soliciting bids for the Underground Utility District 38 Overhead-to-Underground Service Conversions project in the City of Alameda. The primary objective is to safely convert existing overhead electric facilities to underground service for approximately 195 residential locations. The scope includes furnishing and installing aluminum service conductors for standard and 3-inch lateral locations, as well as implementing voltage-drop mitigation for laterals exceeding 100 linear feet. The project is not intended to increase customer service capacity or modernize customer-owned equipment; existing meter sockets and service equipment will remain in place if deemed safe by the City Building Division. The contract requires the selected bidder to hold a C-10 Electrical Contractor license and maintain DIR registration. Bids are due by November 25, 2026, and must be submitted via the electronic bid portal by registered vendors. A mandatory virtual pre-bid meeting was held on November 5, 2026, and attendance was required for bid eligibility. The project must be completed within 365 calendar days from the Notice to Proceed, with an anticipated start date of March 1, 2027. Work is restricted to normal business hours, Monday through Friday, excluding holidays. Award will be granted to the lowest responsive and responsible bidder based on the total evaluated bid. Required submittals include a 10% bid security, a subcontractor list, and a bid schedule. Upon award, the contractor must provide performance and payment bonds for 100% of the maximum contract price. The project is subject to California Department of Industrial Relations prevailing wage determinations and a Project Stabilization Agreement for contracts valued at $1,000,000 or more. There is no specific set-aside status for this solicitation.
Engineering and Operations

POSTED

1 day ago

DEADLINE

in 5 days
NAICS: 237130
New
SLED
Oates to Centerville Transmission Line Construction Services (GP&L)
Solicitation # REQ00003581
The City of Garland is soliciting competitive sealed proposals for the Oates to Centerville Transmission Line Construction Services (GP&L), with a response deadline of December 8, 2026. The project involves the construction of transmission lines, including the installation of steel Monopolite riser tangent structures using A572 GR65 and A572 GR50 steel specifications. Award will be based on the most advantageous offer, considering price and other evaluation factors. Bidders must provide a 5% bid bond to be considered responsive, and a performance, payment, and maintenance bond (2 year) will be required upon award. All bids must be submitted through the Ion Wave portal, as emailed or faxed bids are not accepted. The scope of work includes strict requirements for aerial and ground markers, with specific hardware and vinyl adhesive numbering for structure identification. Contractors must comply with Texas Government Code Chapter 2258 regarding prevailing wage rates and the Davis-Bacon Act. Quality control is paramount, requiring an ACI-certified Concrete Quality Control Technical Manager and adherence to ASTM C1077 standards. Bidders must submit a QA/QC form, provide five years of Insurance Modifier (EMR) documentation, and acknowledge the City's terms and conditions. Final project acceptance is contingent upon the Owner's approval of site restoration to its original condition.
City Of Garland

POSTED

1 day ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The Utility Adjustment and Conflict Mitigation subcontract involves performing necessary adjustments for water, electric, and gas lines based on established utility conflict matrices. The scope of work requires close coordination with the City, APS, SRP, and COX to ensure proper mitigation of utility conflicts. Managed by the Design and Construction Procurement agency for Arizona, the project falls under NAICS code 237130. The solicitation was posted on January 15, 2026, with a response deadline of February 10, 2026. There is no specified set-aside status for this contract.

Documents

This scope was carved out of ST87600136.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

20TH STREET: GRAND CANAL TO HIGHLAND AVENUE DESIGN-BID-BUILD

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ANE-1256-02 BNACTS - UIS COMM BDF RCAG Tower InstallationOpen now, due in 20 days
  • ANE-1251-01 BNACTS-UIS COMM- LNK RTR Tower InstallationOpen now, due in 20 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Design and Construction Procurement
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform utility adjustments for water, electric, and gas lines as identified in utility conflict matrices; coordinate with CITY, APS, SRP, and COX.

More opportunities from Arizona → Design and Construction Procurement

Same awarding agency

NAICS: 237110
New
SLED
ARIZONA SCIENCE CENTER STORMWATER AND SEWER PIPE REPLACEMENT CONSTRUCTION MANAGER AT RISK SERVICES
Solicitation # PW26740069
The City of Phoenix is seeking a Construction Manager at Risk (CMAR) for the Arizona Science Center Stormwater and Sewer Pipe Replacement project, with an estimated construction cost of $8.2 million. The scope of work involves the replacement or approved remedy of all existing drain, waste, vent, and storm drainage systems to address aging infrastructure. The selected CMAR will provide preconstruction services, including detailed cost estimating and budget validation, and will be responsible for developing two Guaranteed Maximum Price (GMP) proposals in MAG or CSI format. Construction services include site operation management, safety oversight, and a requirement for 24-hour, 7-day emergency response coverage with on-site arrival within two hours of notification. The project also includes an add alternate for ADA upgrades, specifically adult changing stations, and may require the use of the UNIFIER project management database. Qualified firms must submit a Statement of Qualifications (SOQ) and a separate bonding capacity statement from a surety company rated A- or better by December 11, 2026. The SOQ is limited to 12 pages and must be submitted electronically via the City's Procurement Portal. Evaluation criteria focus on the firm's general information, key personnel, and experience with at least three comparable CMAR projects. The contract emphasizes Small Business Enterprise (SBE) participation, requiring the CMAR to implement goals for local SBEs located within Maricopa County. Required documentation for GMP submittals includes a Contractor’s Statement of Proposed SBE Utilization and Letters of Intent for each SBE subcontractor. There is no specified set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

about 14 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237110
New
SLED
SANITARY SEWER REHABILITATION PROGRAM JOB ORDER CONTRACT
Solicitation # JOC261
The City of Phoenix is seeking up to five qualified contractors for the Sanitary Sewer Rehabilitation Program Job Order Contract (JOC261). This on-call program focuses on the rehabilitation of sanitary sewer pipes, primarily those with 8-inch to 15-inch diameters, using cured-in-place pipe (CIPP) lining as the primary method, alongside occasional dig-and-replace operations. The scope of work includes CIPP structural liner installation, PVC-liner repair, manhole rehabilitation, sewer cleaning, CCTV digital scans, bypass pumping, and trenching. The contract has a duration of 36 months with a potential value of up to $50,000,000, though individual JOCs are capped at $30,000,000. Selection is based on a qualifications-based process using Statements of Qualifications (SOQs), with evaluation factors including general firm information, Arizona contractor licensing, and performance evaluations from references. Submittals must be electronic, in PDF format, and limited to 10 pages, excluding the information sheet and a required separate bonding capacity statement. The response deadline is November 30, 2026, at 12:00 pm Phoenix time. While the contract includes Small Business Enterprise (SBE) clauses and reporting requirements, the specific SBE goal for this project is set at 0.00%. There is no specific set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
SLED
ESTRELLA CIVIC SPACE BRANCH LIBRARY (GO BOND) AND ROAD IMPROVEMENTS CONSTRUCTION MANAGER AT RISK SERVICES
Solicitation # PA75200751 & LS71200119
The City of Phoenix is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction and construction services for the Estrella Civic Space Branch Library (GO Bond) and Road Improvements project. Located near W. Lower Buckeye Road and S. 99th Avenue, the project has an estimated construction cost of $9.7 million. The scope includes the construction of a 12,000 square foot branch library with associated parking and landscaping, as well as significant street improvements including a new traffic light at 95th Avenue, bike lanes, and center medians. The selected CMAR will be responsible for delivering the project through a Guaranteed Maximum Price (GMP) contract, with the GMP required to be submitted in MAG or CSI format. Selection is based on a qualifications-based process evaluating project approach, firm experience, key personnel qualifications, and reference checks, with additional points awarded for interviews. Applicants must submit a Statement of Qualifications (SOQ) in PDF format, not exceeding 20 pages, along with a separate bonding statement from a surety company rated A- or better. Submissions are due by December 4, 2026, via the City's Procurement Portal. The project incorporates a Small Business Enterprise (SBE) program, requiring contractors to submit a Statement of Proposed SBE Utilization and Letters of Intent. Administrative requirements include the use of the UNIFIER project management database for invoicing and progress payments.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS