Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Maryland was posted on August 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Utility Relocation and Coordination Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and related site improvements. The project requires the provision of all necessary labor, materials, transportation, tools, and equipment to ensure a complete and operational system, including disinfection, startup, and commissioning. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for various trade scopes, including traffic control, survey and staking, trenchless construction, steel pipe welding, and electrical and instrumentation. All bids and quotes are due by September 18, 2026, at 2:00 PM PT. Because Garney Pacific, Inc. is a union contractor, all subcontractors must utilize union labor. Additionally, potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company and must provide their bond rate at the time of the bid. The primary point of contact for this solicitation is Alyssa Callaway.
Garney Pacific, Inc.

POSTED

about 13 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract seeks a subcontractor to identify, coordinate, and manage the relocation of gas, water, telecommunications, and electric utility infrastructure within project right-of-ways across Dorchester, Caroline, and Talbot Counties. This effort requires close collaboration with utility providers, the Maryland State Highway Administration, and Miss Utility to ensure seamless planning and execution. Verification of subsurface utility locations is mandatory through the use of test holes to mitigate risks and prevent damage during construction activities. The scope encompasses all logistical and procedural steps necessary to safely move utilities in alignment with project timelines and regulatory requirements. The work is classified under NAICS code 237110 for utility system construction and is issued by the Maryland Department of Transportation under the title Utility Relocation and Coordination Services. Solicitation details indicate a posted date and response deadline of August 27, 2026, although the contract is structured as a subcontract with no set-aside provisions specified. Performance is expected across the designated counties without a defined city-level location, reflecting a region-wide scope. The opportunity is accessible via a public UI link for proposal submission, with no point of contact listed in the provided data, suggesting proposers should refer to the designated portal for further guidance.

General Info

Subcontractor to relocate gas, water, telecom, and electric utilities across Dorchester, Caroline, and Talbot Counties.

Agency

Maryland Department of TransportationView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Area Wide, MD, USA

Set-Aside

NONE

Documents

This scope was carved out of AZ5736114SB.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Call 301 AZ5736114SB

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Maryland Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Identify, coordinate, and manage relocation of gas, water, telecom, and electric utilities within project right-of-ways in Dorchester, Caroline, and Talbot Counties. Includes coordination with utility providers, SHA, and Miss Utility, and verification via test holes.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS