Utility-Scale Solar Amendments

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project seeks to amend land use regulations in Santa Barbara County to eliminate the 600-acre utility-scale solar overlay restriction in the Cuyama Valley and permit such projects through Conditional Use Permits on appropriately zoned lands across unincorporated areas. It introduces a new community-scale solar category for smaller facilities and updates multiple comprehensive plans and codes including the County Comprehensive Plan, Coastal Land Use Plan, County Land Use and Development Code, Montecito LUDC, Article II Coastal Zoning Ordinance, and the Uniform Rules for Agricultural Preserves and Farmland Security Zones to align with state mandates. The initiative aims to streamline the permitting process for solar energy development while ensuring compliance with environmental protection laws such as CEQA, AB 52, and SB 18, as well as local environmental thresholds and the County’s 2030 Climate Action Plan. Construction activities for the associated solar facility involve extensive site preparation and grading across approximately 559 acres with a projected timeline extending from January 2026 through May 2030, including land clearing, earthwork, and material export of 825,000 cubic yards, managed through phased construction with active dust mitigation measures targeting a 61% reduction in PM10 and PM2.5 emissions and coordination of up to 250 workers and over 13,000 vehicle trips. Environmental and cultural resource protection form a central component of the project’s implementation, with inspections and acceptance tied to compliance with County Archaeological Guidelines, CEQA Section 15064.5, and protocols from the California Native Heritage Commission and California Invasive Plant Council. Mitigation measures include restrictions on work hours to protect wildlife, mandatory WEAP training for all personnel, prohibitions on firearms and pets on site, strict control of invasive species, and spill containment protocols. Oversight is shared between the contractor, responsible for executing and documenting mitigation efforts, and the County’s Planning and Development Department, which conducts verification and approves final compliance. The project site spans unincorporated areas including Buellton, Carpinteria, Goleta, Guadalupe, Lompoc, Santa Barbara, Santa Maria, and Solvang, with no contractual pricing or payment terms identified, and no formal FAR clauses, contract administration data, evaluation criteria, or procurement structures applicable because this is a policy and zoning amendment initiative rather than a traditional procurement contract. The process is led by County Planner Zoe Carlson and consulting planner Luci Hise-F

General Info

Amend zoning to permit utility and community-scale solar via CUPs, align plans with state law, manage 559-acre construction with strict environmental safeguards.

Agency

California → Santa Barbara County

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Countywide, CA

Set-Aside

NONE

Documents

(6)

Draft PEIR Utility-Scale Solar Amendments Santa Barbara County Nov 2024

PDFpeir

Draft Program Environmental Impact Report for Santa Barbara County Utility-Scale Solar Amendments August 2025

PDFenvironmental-impact-report

Notice of Availability - Draft Program Environmental Impact Report for Utility Scale Solar Amendments Project

PDFspecial-notice

CDFW Comments on Draft Program EIR for Utility-Scale Solar Amendments Project SCH No. 2024110254

PDFcomment-letter

Draft Program Environmental Impact Report - Utility-Scale Solar Amendments Project

PDFenvironmental-impact-report

Notice of Completion - Utility-Scale Solar Amendments SCH# 2024110254

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Barbara County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Santa Barbara County
Office AddressN/A
Contacts
Luci Hise-FisherConsulting Planner

Interested Companies (1)

Show more
Environmental Science Associates
Los Angeles, CA

Full Description

Show more
The project proposes to remove the 600-acre utility-scale solar overlay restriction in Cuyama Valley and allow such projects with Conditional Use Permits (CUPs) on various zoned lands throughout the unincorporated county. It also introduces a new "community-scale" solar category for smaller facilities. The project aims to streamline solar permitting processes and update multiple county plans and regulations to meet state requirements including the County of Santa Barbara Comprehensive Plan; Coastal Land Use Plan; County Land Use and Development Code (LUDC); Montecito LUDC; Article II Coastal Zoning Ordinance; and Uniform Rules for Agricultural Preserves and Farmland Security Zones (Uniform Rules).

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Monterey One - Renewable Energy Improvements (CP361), Marina, CA
Solicitation # monterey-one-renewable-energy-improvements-cp361-marina-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to participate in the Monterey One Water Regional Treatment Plant CP361 Renewable Energy Improvements Project located in Marina, California. The project scope includes extensive upgrades and replacements such as digester gas piping and safety equipment, new access roof hatches with concrete repairs, recoating and structural repairs to all four digesters and the digester building, installation of new level measurement devices, and integration of five Owner-furnished linear generators with associated electrical systems. Additional work involves installing biogas conditioning and renewable natural gas upgrading equipment with a pipeline to the PG&E injection station, replacing the existing steam system with a hydronic heating water boiler, removing old waste gas flares and installing new enclosed flares, and demolishing the Cogen facility and related structures. The project also encompasses civil, structural, mechanical, electrical, and demolition tasks necessary to support these improvements. Bidders must be prepared to comply with the project’s set-aside requirements, which include participation from Disadvantaged Business Enterprises certified by the Department of Transportation, Minority Business Enterprises certified by NMSDC, and Women Business Enterprises certified by WBENC. Responses are to be submitted by August 20, 2026, and interested parties must email estimating@gseconstruction.com to request access to the complete project documentation via a secure link. The solicitation is open to vendors under various NAICS codes related to construction specialties and is not restricted to federal procurement standards, with the lead point of contact being Michael Demissie at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238910
New
SEA S Concourse Evolution (SCE) – Bid Package 02
Solicitation # sea-s-concourse-evolution-sce-bid-package-02
The Seattle-Tacoma International Airport’s S Concourse Evolution (SCE) Bid Package 2, managed by Hensel Phelps as General Contractor/Construction Manager, encompasses a comprehensive suite of construction and systems integration activities critical to the modernization of the airport’s infrastructure. The scope includes demolition and abatement, building concrete retrofit, structural steel and metal stairs and railings, fire suppression systems, site paving, runway and taxiway marking, site demolition and earthwork, deep foundations, site utilities, aviation fueling systems, and baggage handling systems, with estimated contract values ranging from $124.2 million to $143.7 million across eleven subsystems. This bid package is structured under a Project Labor Agreement (PLA), requiring all workers to adhere to union labor standards, and mandates the use of Hensel Phelps’ standardized subcontract forms for all subcontracts. All subcontractors must provide performance bonds for contracts exceeding $100,000 and are required to submit a Workers’ Compensation Waiver of Subrogation. The work is to be performed entirely at the airport in Washington State, with bids due by August 11, 2026, and must be submitted via email to SEA-SCEBids@henselphelps.com using the official bid form provided in the Instructions To Bidders document. This solicitation is specifically reserved for Small Disadvantaged Businesses (SDB) under NAICS code 238910, with Hensel Phelps acting as an Equal Opportunity Employer and Contractor. Documentation requirements include the submission of the bid form, applicable bonds using provided templates, and strict adherence to the defined submission process, though specific performance periods, inspection criteria, payment terms, and evaluation factors are not detailed in the available materials.
Hensel Phelps

POSTED

about 7 hours ago

DEADLINE

in 25 days
View Details
NAICS: 238910
New
Pismo - DB Services for the Central Coast Blue AWPF, Pismo Beach, CA
Solicitation # pismo-db-services-central-coast-blue-awpf-pismo-beach-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to participate in the Design-Build construction of the Central Coast Blue Advanced Water Purification Facility in Pismo Beach, California, under solicitation number 2026-138. The project will deliver a new 0.50 million gallon per day facility aimed at producing approximately 500 acre-feet of purified water annually, incorporating critical components such as a 200,000-gallon equalization tank, membrane filtration, two-stage reverse osmosis, UV/advanced oxidation, post-treatment stabilization, chlorination, chemical storage and feed systems, purified water storage and pumping, and about 2,000 linear feet of HDPE conveyance pipelines. Additional scope includes groundwater recharge infrastructure comprising one injection well and two monitoring wells, along with full electrical, instrumentation, SCADA, and control systems. The solicitation targets specific NAICS codes related to construction, water and wastewater systems, chemical supply, and specialized fabrication, and is open to small businesses including Small Disadvantaged Businesses, Women-Owned Small Businesses, Disadvantaged Business Enterprises, and Minority Business Enterprises certified through NMSDC. Interested parties must contact estimating@gseconstruction.com to request secure access to all project documents prior to submitting a bid, with the response deadline set for August 11, 2026. The solicitation is managed under a set-aside designation supporting small and disadvantaged business participation, and key points of contact for inquiries are Michael Demissie and Juan Catano via their respective GSE email addresses. All technical details, scope requirements, and submission protocols are provided exclusively through the secure link issued after request, ensuring bidders have full context before preparing their proposals. The place of performance is confirmed as Pismo Beach, California, and GSE Construction Co., Inc. is acting as the lead contracting entity on behalf of the City of Pismo Beach for this municipal water advancement initiative.
GSE Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238910
New
SLED
AL ROLLINS PARK ARTIFICIAL TURF BASEBALL FIELDS RFP
Solicitation # PE-75552-NONST-2026-000000066
The City of Dalton is soliciting proposals for the supply and installation of four new artificial turf baseball fields at Al Rollins Park located at 521 Threadmill Road in Dalton, Georgia. The project requires the contractor to provide and install a complete artificial turf system, including a stone base, storm drainage, nailers, artificial turf, infill, base inserts, and field striping, along with all necessary labor and materials. The City will handle preliminary site work by removing soil to sub-grade and providing a connection point for the underdrainage system, as well as installing a concrete perimeter curb for the wood nailer. The selected contractor must coordinate closely with the City to ensure proper scheduling and phasing of installation. All interested parties are required to attend a mandatory pre-proposal meeting on August 25, 2026, at 2:00 p.m. at KRH Architects Inc. in Dalton; late arrivals will not be admitted. Sealed proposals must be submitted to the City’s Finance Department by 2:00 p.m. on September 8, 2026. The City reserves the right to request additional information from proposers and may shortlist qualified firms for interviews scheduled for September 10 and 11, with notifications sent by the end of the day on September 8. The solicitation number is PE-75552-NONST-2026-000000066, and the primary point of contact is Kenneth Harless of KRH Architects.
City of Dalton

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details