Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Utility Structure Removal (Wood H-Frame and Steel Caisson)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the full removal of public utility structures for California Department of Fish and Wildlife projects located in the Santa Clara River near Ventura. The scope of work specifically requires the removal of two wood H-frame poles and the extraction of a steel caisson to a depth of 24 inches below grade. To complete these tasks, the contractor must utilize heavy equipment specifically capable of operating within riverbed environments to ensure the site is cleared of all utility debris. All operations must strictly adhere to riparian zone protections and comply with the established Lake or Streambed Alteration Agreement. This project is categorized under NAICS code 238910 and is managed by the California Fish and Wildlife Region 5 - South Coast agency. The primary objective is to deliver a fully cleared site while maintaining environmental compliance throughout the extraction and removal process.

General Info

Removal of utility poles and caissons in Santa Clara River following environmental compliance.

Agency

California → Fish and Wildlife, Region 5 - South Coast, San Diego

Place of Performance

Ventura, CA

Set-Aside

NONE

Documents

This scope was carved out of EPIMS-VEN-19609-R5.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

TD708755 – On-Ramp Santa Clara Crossing Project (Notification of Lake or Streambed Alteration, No. EPIMS-VEN-19609-R5)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 5 - South Coast, San Diego
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 5 - South Coast, San Diego
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs full removal of public utility structures for prime contractors on California Department of Fish and Wildlife projects in the Santa Clara River. Removes wood H-frame poles 4244682E and 4244683E and extracts a steel caisson to 24 inches below grade. Uses heavy equipment capable of operating in riverbed environments. Complies with Lake or Streambed Alteration Agreement and riparian zone protections. Delivers a site cleared of utility debris.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 18 hours ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS