Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Valero SJV Crude Pipeline Repair Project (Notification of Lake or Streambed Alteration, No. EPIMS-CCA-57024-R3)

Forecast
EPIMS-CCA-57024-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-CCA-57024-R3 with Valero Refining Company California for the Valero SJV Crude Pipeline Repair Project. Located in Contra Costa County at two emergent wetlands adjacent to Peyton Slough, the project involves assessments and maintenance at four locations along the San Joaquin Valley Crude Pipeline where thinning has occurred. The scope of work includes clearing and grubbing, pipeline excavation, installation of trench plates and coffer dams, pumping standing water, removing pipeline coating for external inspection, performing necessary repairs, and restoring sites to pre-construction contours. The project is categorized as a repair and maintenance activity without expansion of use, qualifying for a categorical exemption under California Code of Regulations title 14, section 15301. Execution will involve various heavy equipment, including excavators, backhoes, and welding rigs, with hand digging required when working in close proximity to the pipeline. Access is restricted to existing paved and dirt roads. Environmental impacts are limited to temporary effects on approximately 0.391 acres of brackish marsh habitat and 0.064 acres of freshwater emergent habitat, with a strict requirement that no trees be removed.

General Info

Valero permitted to conduct routine pipeline maintenance with minimal habitat impact in Contra Costa County.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-CCA-57024-R3, pursuant to Section 1602 of the Fish and Game Code to Valero Refining Company – California, as represented by Mark Galicia. The project proposes to conduct assessments and maintenance at four locations along the San Joaquin Valley Crude Pipeline that have exhibited thinning. The project is limited to the following activities: clearing and grubbing; excavation of the pipeline at each site; installation of trench plates; installation of coffer dams as necessary; pumping of standing water to a water tank to dry each trench; removal of pipeline coating to facilitate external inspection for anomalies; repairs to the pipeline as needed; and the backfill of trenches and restoration of each site to pre-construction contours. Equipment may include an excavator, backhoe, hand tools, generators, dewatering pumps, water storage tanks, hoses, dump trucks, reach lift, compressor, welding rig, semi-truck tractor, sandblaster, and pump truck. Hand digging will be utilized when in close proximity to the pipeline. Access routes will be restricted to existing paved and dirt roads, and will be cleared to the extent necessary to allow equipment to reach the work site, while staging and work areas will encompass only the area needed to perform pipeline maintenance. Temporary impacts will occur to approximately 0.391 acres of brackish marsh habitat and 0.064 acres of freshwater emergent habitat as a result of project activities, and no trees will be removed.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
SLED
WH Ford RTC Fueling System Repairs, Kentucky
Solicitation # W9128F27RA054
Solicitation W9128F27RA054 is a Firm Fixed Price, Design-Build project for fueling system repairs at the Wendell H. Ford Regional Training Center in Greenville, Kentucky. The comprehensive scope of work includes upgrading Automatic Tank Gauges, repairing dispenser and offload island concrete, installing Emergency Fuel Shut-Offs, and mounting leak detector probes on diesel aboveground storage tanks. Additional requirements involve replacing canopy and fuel pipe coatings, installing concrete circulation pavement and splash blocks, replacing tank vents and roof penetration boot seals, providing dead man controls for truck loading, and repairing tank grounding and access platforms. All work must adhere to UFC, NFPA, ASTM, and MIL-STD-161H standards, with specific compliance required for ADA and ABA accessibility guidelines. The project is evaluated using the Lowest Price Technically Acceptable (LPTA) method, with award based on technical acceptability in relevant experience, a detailed Gantt chart covering preconstruction, construction, and post-construction phases, and a well-defined construction methodology. Proposals must be submitted in two separate volumes: a Technical volume and a Price volume. The performance period requires work to commence within 10 days of the Notice to Proceed, with a final completion deadline of June 18, 2027. Contractors must maintain a three-phase quality control system and comply with the Davis-Bacon Act for labor rates. Final acceptance is contingent upon a multi-stage inspection process, including punch-out and pre-final inspections, to ensure the facility is ready for occupancy.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
Federal
WH Ford RTC Fueling System Repairs
Solicitation # W9128F27RA054
Solicitation W9128F27RA054 is a firm-fixed-price, design-build project for fueling system repairs at the Wendell H. Ford Regional Training Center in Kentucky, managed by the Omaha District of the U.S. Army Corps of Engineers. This procurement is restricted to 100 percent small businesses under NAICS code 237120. The scope of work involves comprehensive upgrades to two 10,000-gallon above-ground storage tanks, including upgrading the automatic tank gauging system from Veeder Root TLS-350 Plus to TLS-450, installing an emergency fuel shutoff station and leak detection equipment, and repairing concrete pavement and splash blocks. Additional requirements include recoating fuel system canopies and piping, replacing tank vents, improving grounding systems, and modifying tank access platforms. Proposals are due by December 21, 2026, at 14:00 CST and must be submitted in two separate volumes: a technical volume and a pricing volume. The government will utilize the Lowest Price Technically Acceptable (LPTA) source selection process, evaluating offerors on specialized experience in military base construction, a logical Gantt chart for a 410-calendar day period of performance, and a detailed technical approach. Work must adhere to EM 385-1-1 safety standards, UFC, NFPA, and EPA regulations. The successful contractor must commence work within 10 days of the Notice to Proceed, with a final completion deadline of June 18, 2027.
W071 Endist Omaha

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
Federal
Z1DA--NRM-CON-663A4-27-001 Under Dispenser Containment (UDC) and sump installation at VAMC American Lake
Solicitation # 36C26027R0029
The Department of Veterans Affairs, VA Puget Sound Health Care System, is soliciting proposals for the installation and commissioning of Under Dispenser Containment (UDC) and a containment sump at the American Lake Campus in Tacoma, Washington. The scope of work includes installing new UDCs and a containment sump, replacing and commissioning Dispenser No. 1, reinstalling other existing dispensers, and installing new piping between extractor valves and UDCs. The contractor is also responsible for verifying and repairing existing fuel lines from tanks to dispensers. All regulated piping tightness testing must be performed or supervised by a provider holding ICC U3 certification and must comply with Washington State Department of Ecology requirements. This is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS 237120, with a small business size standard of $45.0 million in average annual receipts. Eligible offerors must be SBA-certified SDVOSBs with active SAM registration and must submit a bid bond with their proposal. The government will use a best-value tradeoff process to award a firm-fixed-price contract, evaluating proposals based on price, past performance, and technical capability, the latter of which includes personnel certifications, equipment sourcing, and a 90-day project schedule. The period of performance is 90 calendar days following the approval of the project schedule and receipt of deliverables. Proposals must be submitted via email to the contracting office by November 19, 2026, at 15:00 PST. Required submission documents include a signed SF 1442, a bid bond, a certificate of compliance for subcontracting limitations, and detailed technical certifications for proposed personnel. The project is subject to a three-phase quality control process and Davis-Bacon Act wage determinations for Pierce County.
260-NETWORK Contract Office 20 (36C260)

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 237120
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total small business set-aside. The scope of work involves comprehensive repairs to AVGAS fueling systems, including the installation of sampling gauge hatches, mechanical gauges, and an automatic tank gauge system. Key construction tasks include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additionally, the project requires the demolition and replacement of the POL operation building, relocation of a generator with a new concrete pad, repair of remote containment basin drainage, and various asphalt and concrete pavement replacements. The procurement utilizes the Lowest Price Technically Acceptable (LPTA) source selection method, evaluating proposals based on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed project schedule. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict regulatory standards, including UFC 3-460, OSHA, EPA, and DOT requirements. Deliverables include design documents in English units, as-built drawings, and a multi-stage inspection process consisting of punch-out, pre-final, and final acceptance inspections. Performance and payment bonds are required within 10 days of award.
W071 Endist Omaha

POSTED

11 days ago

DEADLINE

in 17 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS