Valley Clean Infrastructure Plan (VCIP)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Valley Clean Infrastructure Plan (VCIP) is a long-term initiative led by the Westlands Water District in California to develop up to 21,000 megawatts of clean energy generation and delivery capacity across approximately 136,000 acres of repurposed farmland. The plan outlines a decade-long construction timeline from 2029 through 2038, focusing on the deployment of utility-scale solar photovoltaic facilities, battery energy storage systems, collection substations, gen-tie lines, and high-voltage transmission infrastructure to connect these assets to the regional grid. Compliance with California environmental and safety regulations is central to the plan, requiring adherence to CEQA guidelines, the California Building Code, CALGreen standards, CPUC General Order 167-C for grid interconnection, and specific safety standards including UL 9540 for battery storage systems to prevent thermal runaway. Environmental assessments must address impacts on air quality, hydrology, noise, land use, and cultural resources, with coordination required among state and federal agencies including the California Air Resources Board, the San Joaquin Valley Air Pollution Control District, and the U.S. Fish and Wildlife Service. Contract administration and oversight are managed by the Westlands Water District with key contacts including Russ Freeman as the primary point of contact for submissions and legal matters, and Jose Gutierrez for project oversight. While no formal contract value, pricing structure, or federal acquisition regulation clauses are specified, the plan requires detailed environmental documentation including Emergency Response Plans, air and water quality monitoring protocols, and reclamation strategies. Proposals must be submitted by September 15, 2025, in a two-volume format—Volume I containing the main plan and Volume II with technical appendices—via email or mail to the district’s Fresno address, with PDF and DOCX being the preferred electronic formats. Safety and labeling requirements mandate compliance with Proposition 65 warnings, DOT hazardous materials regulations, and UL certification markings on all equipment, though no barcoding, military standards, or formal inspection and acceptance protocols are defined. No socioeconomic set-asides, size certifications, or contractor representations are applicable, and no official COR, COTR, or PCO designations have been formally assigned, reflecting the plan’s emphasis on environmental permitting and infrastructure development rather than traditional federal procurement mechanisms.
General Info
Agency
NAICS
Place of Performance
W. Clarkson Ave & S. San Mateo Av (approx. center of VCIP Plan Area), CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
