Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Corrections and Rehabilitation is seeking to design and construct two new groundwater wells to provide a reliable supply of potable water for staff and the incarcerated population at Valley State Prison and the Central California Women's Facility in Chowchilla, California. This project is necessitated by a significant decline in aquifer levels, which have dropped an average of 10 feet per year due to drought and overuse, as well as the age and unreliability of existing wells. The new infrastructure is required to meet the Maximum Daily Demand, ensure operational reliability during future well failures, and allow for regular maintenance. The project must comply with the State Water Resources Control Board requirements and Section 64554 of the California Water Code. Work will be conducted on already developed prison property within highly disturbed undeveloped agricultural fields, and the project has been granted a categorical exemption under CEQA Class 1 as it is not located within an environmentally sensitive area and will have no significant environmental impact. The effort is categorized under NAICS code 237110, with Peter J. Connelly, Jr. serving as the primary point of contact for the Environmental Planning Section.

General Info

Construct two new groundwater wells at prisons to ensure potable water supply and regulatory compliance.

Agency

California Corrections and Rehabilitation, Department of

Place of Performance

Avenue 24 and Road 22, Chowchilla, CA, 93610

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Corrections and Rehabilitation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Corrections and Rehabilitation, Department of
Office AddressN/A
Contacts
Peter J Connelly JrChief, Environmental Planning Section

Full Description

Show more
The California Department of Corrections and Rehabilitation will design and construct two new groundwater wells to supply adequate amounts of potable water for the incarcerated population and staff at Valley State Prison (VSP) & Central California Women’s Facility (CCWF). The volume of the aquifer at both VSP and CCWF have dropped an average of 10 feet per year due to the overuse of the aquifer in the area and years of drought. Based on the age and unreliability of all the wells and less than optimum production of the two fully operational wells (wells 401 and 403), combined with the continued decline in water levels, two additional wells are needed to meet Section 64554 of the California Water Code and SWRCB requirements at VSP. The additional wells requested will also allow the institution to perform regular maintenance and to provide more operational reliability in case of future well failures, all while meeting the Maximum Daily Demand requirement. Work will be performed within the already developed prison property within a highly disturbed undeveloped agricultural field. Both locations are not within environmentally sensitive areas.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the installation of pumps, a generator, odor control equipment, mechanical and electrical systems, and the demolition of existing pumps and piping. The project also encompasses site improvements such as stormwater facilities, fencing, and various paving and restoration activities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with specific requirements for the submission of a Good Faith Efforts Form and Table A to meet MBE/WBE participation goals of 10.9 percent for the EPA and 10 percent for the State of North Carolina. Performance and payment bonds, as well as proof of insurance, are required. The project is managed by Willis Engineers, and the contractor will be subject to liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner. All work must adhere to strict quality standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS