Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Valve & Tie-in Installation

Active

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

James W. Fowler Co.View Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

SBA

Documents

This scope was carved out of inland-feedersbvmwd-foothill-ps-intertie-stage-1.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyJames W. Fowler Co.
ContactsNo contacts available
OfficeN/A
Organization / Agency
James W. Fowler Co.
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs large-diameter valves and performs tie-ins for prime contractors on Metropolitan Water District of Southern California projects. Installs 54" and 132" valves and 54" and 145.5" tie-ins using heavy lifting cranes. Adheres to project specifications for valve installation and pressure testing. Delivers operational valves and completed tie-ins.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as pipe installation, valves, welding, and cathodic protection, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Technical and environmental services are also required, including surveying, testing and inspections, settlement monitoring, videography, SWPPP implementation, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage their participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis.
Filanc

POSTED

about 14 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of associated appurtenances such as trenchless crossings, air release valves, blowoff assemblies, valves, and fittings, as well as connections to existing water facilities. Additional requirements encompass the construction of flow control facility components, site improvements, pavement removal and restoration, traffic control, and the overall commissioning and disinfection of the system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for this project, with a response deadline of September 18, 2026, by 2:00 PM PT. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, DBE, and DVB. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Requested trade scopes include trenchless construction, steel pipe welding, electrical and instrumentation, cathodic protection, and various restoration and hauling services. Point of contact for the project is Alyssa Callaway.
Garney Pacific, Inc.

POSTED

about 14 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves, 54-inch and 145.5-inch diameter tie-ins, four surge tanks, two valve vaults, and an air compressor yard structure. Additional requirements encompass drainage improvements, electrical upgrades, instrumentation and controls, piping systems, excavation of cobbles and boulders, welding, disinfection, and surface restoration. This opportunity is designated as a small business set-aside, specifically welcoming SBA-certified Service-Disabled Veteran-Owned Small Businesses, Minority Business Enterprises, and Woman Business Enterprises. James W. Fowler Co. provides support for M/W/DBE subcontractors in securing bonding, insurance, lines of credit, and necessary materials. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening. The project also encourages the utilization of apprentices and requires quality control testing.
James W. Fowler Co.

POSTED

about 14 hours ago

DEADLINE

in 26 days
View Details