Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Civil Works (Excavation & Restoration)

Active

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

James W. Fowler Co.View Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

SBA

Documents

This scope was carved out of inland-feedersbvmwd-foothill-ps-intertie-stage-1.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyJames W. Fowler Co.
ContactsNo contacts available
OfficeN/A
Organization / Agency
James W. Fowler Co.
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs heavy excavation and surface restoration for prime contractors on Metropolitan Water District of Southern California projects. Excavates cobbles and large boulders and restores surfaces after pipe installation using heavy excavators, rock hammers, and grading equipment. Adheres to local environmental and restoration standards. Delivers excavated trenches and restored surface.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE), Veteran-Owned Small Business Enterprises (VSBE), and Disadvantaged Business Enterprises (DBE) for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering site preparation, utilities, tunneling, boring, asphalt and concrete paving, electrical work, and the supply of various industrial materials. Bidders must possess a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. SBE and VSBE firms must provide evidence of certification from the Department of General Services and the Port of Long Beach PlanetBids portal. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code, requiring onsite firms to be signatory to collective bargaining agreements with various trades to ensure labor harmony. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating strict adherence to DBE Program requirements. Interested firms must contact the Lead Estimator to receive an Invitation to Bid via the BuildingConnected system. The deadline for responses is September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 14 hours ago

DEADLINE

in 12 days
View Details

More opportunities from James W. Fowler Co.

Same awarding agency

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves, 54-inch and 145.5-inch diameter tie-ins, four surge tanks, two valve vaults, and an air compressor yard structure. Additional requirements encompass drainage improvements, electrical upgrades, instrumentation and controls, piping systems, excavation of cobbles and boulders, welding, disinfection, and surface restoration. This opportunity is designated as a small business set-aside, specifically welcoming SBA-certified Service-Disabled Veteran-Owned Small Businesses, Minority Business Enterprises, and Woman Business Enterprises. James W. Fowler Co. provides support for M/W/DBE subcontractors in securing bonding, insurance, lines of credit, and necessary materials. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening. The project also encourages the utilization of apprentices and requires quality control testing.
Water and Sewer Line and Related Structures Construction

POSTED

about 14 hours ago

DEADLINE

in 26 days
View Details