Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

VALVE,BALL

Active
N0010426QZB70Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract pertains to the procurement of a Compartment Salvage Ball Valve for critical shipboard use, designated as SPECIAL EMPHASIS Level I material due to its direct impact on vessel safety, where failure could result in catastrophic loss of life or ship. The valve and its components must strictly conform to specific Navy drawings including 4558705, 4558706, and others, with precise material requirements for parts such as the body, tube, ball, stems, studs, nuts, and seats, each governed by military and industry standards like QQ-N-281, MIL-T-16420, ASTM-B150, SAE AMS 6931, and MD71-GG Mearthane. All materials require traceable certification, with chemical and mechanical tests verified through Objective Quality Evidence, and mandatory certifications including Liquid Penetrant, Ultrasonic, and Dye Penetrant Inspections as specified. Material traceability is enforced from raw stock to finished component via permanent, legible markings meeting MIL-STD-792, with strict controls to prevent commingling and ensure documentation integrity. Non-metallic components such as elastomeric seats must meet exact hardness, tensile, and absorption properties per ASTM standards and be sourced exclusively from approved suppliers. All manufacturing and assembly processes must adhere to detailed specifications including welding and brazing requirements under S9074-AQ-GIB-010/248 and 0900-LP-001-7000, with procedure and welder qualification data subject to prior government approval. Thread forming is restricted to cutting, and lubricants containing molybdenum disulfide are prohibited due to seawater degradation risks; instead, Anti-galling compound A-A-59004 is mandated. The Contractor must maintain an ISO-9001-compliant quality system with calibration procedures aligning to ISO-10012 or ANSI-Z540.3, and is subject to Government Quality Assurance at source. Final acceptance requires 100% inspection of certification documents, traceability markings, and non-destructive test results, with zero defect tolerance for lot acceptance. All fasteners must be uniquely marked with material symbol, manufacturer ID, and traceability number, while Teflon coatings and seat dimensions must comply with specific drawing notes and CSD references. The contract mandates full compliance with Buy American provisions, Small Business set-asides

General Info

Procurement of Navy-critical salvage valve with strict material, traceability, inspection, and compliance requirements for shipboard safety.

Agency

Department Of Defense → Navsup Weapon Systems Support MechView Agency

NAICS

332919 - Other Metal Valve and Pipe Fitting ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support Mech
View Agency Profile
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N742.11|WVN|n/a|landon.a.switzler.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See Specifications Section C and Section E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| INSPECTION/ACCEPTANCE POINT|6||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material|N/A|TBD|N00104|TBD|TBD|N50286|TBD|133.2|N/A|N/A|N/A|N/A|N/A|See form DD1423|| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECH| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery|One year from date of delivery||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1.This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2.The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3.All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 4.If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 5.Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. 6.If drawings are included in the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on SAM.gov website. After requesting access, send an email to the POC listed on the solicitation. 7.NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers. 8.DD1423 Data Items with title of "INSPECTION AND TEST PLAN" SUB TITLE "INSPECTION SYSTEM PROCEDURES" may be waived if already on file at NAVSUP WSS MECHANICSBURG. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=DM100136 |80064| D|1N |D| | | | DRAWING DATA=DM103678 |80064| A|1N |D| | | | DRAWING DATA=DM107724 |80064| A|1N |D| | | | DRAWING DATA=2109895 |80064| H| |D| | | | DRAWING DATA=4558705 |80064| G| |D| | | | DRAWING DATA=4558706 |80064| F| |D| | | | DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A|2 | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=ASTM-E1417 | | | |160615|A| | | DOCUMENT REF DATA=ASTM-E1444 | | | |160601|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=ASTM-D4066 | | | |130701|A| | | DOCUMENT REF DATA=SAE AMS 6931 | | |D |171201|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=MIL-C-15726 | | |F |911008|A|1 | | DOCUMENT REF DATA=MIL-T-16420 | | |K |880916|A|1 | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=QPL 25027 | | |17 |000207|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |081118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=AIA/NAS NASM 25027 | | |1 |121221|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;The Compartment Salvage Ball Valve must be in accordance with NAVSHIPS Drawing 4558705 Assembly "B" and all drawings and Engineering Notices provided with this Contract/Purchase Order, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body, Item No.1.1 on drawing 4558706; Material - ;QQ-N-281, Class A, Hot Finished; Part - ;Tube, Item No. 1.2 on drawing 4558706; Material - ;MIL-T-16420, Composition 70-30, Type I, Class 3300, Grade 2; Part - ;Ball Retainer, Item No. 2 on drawing 4558706; Material - ;QQ-N-281, Class A, Form 1; Part - ;Gland, Item No. 5 on drawing 4558706; Material - ;QQ-N-281, Class A, Form 1; Part - ;Inner Stem, Item No. 6 on drawing 4558706; Material - ;ASTM-B150, alloy C63200, temper TQ50 or TQ55; Part - ;Outer Stem, Item No. 8 of drawing 4558706; Material - ;ASTM-B150, alloy C63200, temper TQ50 or TQ55; Part - ;Ball, Item No. 9 on drawing 4558706 (with dimensions from drawing 2109895 PC 20); Material - SAE-AMS-6931 Note: Mechanical properties for bars, forgings and forging stock over 10" must be as specified in the applicable drawing. If the mechanical properties are not provided in the drawing, the mechanical properties specified in SAE-AMS-6931 Table 2 for material 6" to 10", must be applied. Part - ;Seats (Q3), Item No. 11 on drawing 4558076; Material - MD71-GG Mearthane (Graphite Filled Urethane). Material must be manufactured by Mearthane Products Inc. Cranston, RI. (Properties Specified Below Only) ITEM PROPERTY ASTM TEST METHOD VALUE (A) Hardness D2240 70 +/- 5 Shore D (B) Specific Gravity D792 1.18 +/- 0.02 (C) Tensile Strength D412 (DIEC) 5000 PSI MIN (D) Compression-Defl D575 700 PSI MIN @ 2% DEF. (E) Tensile Impact D1822 300 FT-LB/SQ IN (Note 1) (TYPE L SPECIMEN) (F) Water Absorption D570 1.5% MAX (1 Week at R.T.) Note 1: These values are minimum averages. Separate specimen values may not vary more than 25% under the specified minimum. Part - ;Studs, Item Nos. 20, 21 and 22 on drawing 4558706; Material - ;MIL-DTL-1222, Type IV, Grade 500, Annealed and Age Hardened; PART - ;Self-Locking Hex Nuts, Item Nos 23, 24 and 25 on drawing 4558706; MATERIAL - QQ-N-281, class A annealed (hot finished or cold drawn) or class B cold drawn. All material must be from the same class. SELF-LOCKING ELEMENT- ASTM-D4066, Group 01, Class 1, Grade 1 Part - ;Pipe Adapter, Item No. 28 on drawing 4558706; Material - ;MIL-C-15726, alloy C71500; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - ;Liquid Penetrant Inspection; Item - ;Studs, Item Nos. 20, 21 and 22 on drawing 4558706; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;Ultrasonic Inspection; Item - ;Tube, Item No. 1.2 on drawing 4558706 (Starting Material Only); Performance - ;T9074-AS-GIB-010/271 and MIL-T-16420; Acceptance - ;MIL-T-16420; Test - ;Dye Penetrant Inspection for Non-Magnetic Grades; Item - ;Self-Locking Hex Nuts, Item Nos 23, 24 and 25 on drawing 4558706; Performance - T9074-AS-GIB-010/271 or ASTM-E1417/ASTM-E1444 (Method C solvent removal techniques must not be used on thread) Acceptance - ;NASM25027; Attribute - Certificate of Compliance Item - Self-Locking Nuts Performance - This Certificate must state that self-locking nuts were manufactured by an approved source. Approved sources are those listed on QPL-25027 for the appropriate fastener. This QPL may also be considered as approved sources for Heavy Hex self-locking nuts. Attribute - Certificate of Compliance for seamless tubing/pipe Item - ;Tube, Item No. 1.2 on drawing 4558706; Performance - Material supplied must be in the seamless condition. Attribute - Annealing and Age Hardening Item - ;Studs, Item Nos. 20, 21 and 22 on drawing 4558706; Performance - QQ-N-286 Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 Test - Pressure Tests Item - Each Assembly Performance - ;General Notes 4 and 11 of Naval Ships Systems Command drawing 4558705; Acceptance - ;General Notes 4 and 11 of Naval Ships Systems Command drawing 4558705; Test - Quality Conformance Tests Item - Self-Locking Nuts Performance - ;NASM25027; Acceptance - ;NASM25027; Attribute - Certificate of Completion Item - Self-Locking Nut Nonmetallic Insert Performance - ;ASTM-D4066, Group 01, Class 1, Grade 1; Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification 3.4 Thread Forming - The following provides the official interpretation of paragraph 4.5.2.7 of MIL-DTL-1222. 3.4.1 In order to qualify for "Alternate Mechanical Testing" found in MIL-DTL-1222J paragraph 4.5.2.7 and utilize the mechanical properties for the starting bar stock in lieu of performing yield strength or proof stress testing on finished fasteners, all of the subsequent provisions found in MIL-DTL-1222J paragraphs 4.5.2.7 a through e must be met. If any single provision is not met, all required mechanical testing must be performed on the finished full sized fasteners. These provisions are explained as follows: a. Proper product lot control and traceability must be in place. b. No heat treatment (including hot heading and hot forming), cold forming, drawing, rolling and thread rolling may be performed on the starting bar, fastener blanks or finished fasteners after the completion of the mechanical testing on the starting bar. c. and d. The proper size starting bar must be selected to ensure mechanical properties of finished fasteners are represented by the mechanical properties of the starting bar. e. The mandatory testing, axial tensile (studs) and wedge tensile (screws and bolts) must be performed on full sized fasteners. Note that there is a typographical error in paragraph 4.5.2.7 and that the axial load test is a mandatory test that must be performed on studs as required in paragraph 4.5.2.7.e. 3.4.2 Thread rolling is a cold working process and is not considered to be a machining or grinding operation. Therefore, fasteners which have rolled threads do not satisfy the provisions of MIL-DTL-1222J paragraph 4.5.2.7.b and are not eligible for the "Alternate Mechanical Testing" provision. 3.4.3 Thread rolling alone is not a sufficient cold working process to qualify a fastener to be in the cold worked (CW) condition. This condition is only applicable to some 300 series stainless steel studs, screws and nuts. These CW condition fasteners must be manufactured from cold worked bar stock or be cold headed in order to qualify. The threads may subsequently be rolled, machined or ground. Testing of the finished fasteners and/or reporting of the starting bar stock material properties is subject to the same provisions found in MIL-DTL-1222J paragraph 4.5.2.7 and discussed above. 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.6 Specification Change - For QQ-N-281, Class B material: 1 - Footnote 9 to Table II of QQ-N-281 does not apply. 2 - When starting material is Round Bar greater than 3" dia, the mechanical properties of Hex Bar apply. 3.7 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.8 Chemours Company (formerly DuPont) Teflon Coating 850G-204 and 852G-201. Use of Chemours Company (formerly DuPont) Teflon Coating 851N-204 and 852N-201 is acceptable until exhausted - Teflon coating of ball(s) must be in accordance with general note ;6; of drawing ;4558706; . 3.8.1 Naval Ordnance Systems Command OD 10362 First Revision dated 15 Aug 1961 is provided by Contract Support Library Reference Number CSD018 in ECDS at https://register.nslc.navy.mil/ 3.8.2 CSD099 provides guidance for acceptance/rejection of teflon-coated valve balls after valve assembly production testing. 3.9 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD099; in ECDS at https://register.nslc.navy.mil/ 3.10 Ball Spherical Surface Waviness - Unless otherwise specified on drawing, all sealing area surfaces must have a spherical surface waviness which does not exceed 0.0005 inches of height per inch of spherical surface. Roughness and waviness ratings must apply in a direction which yields the maximum rating, normally perpendicular to the lay. 3.11 ;Surface waviness must be verified prior to Teflon coating.; 3.12 A visual inspection shall be performed on the finished seat with acceptance criteria on critical surfaces per CSD167 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/. 3.13 K-MONEL Fasteners - Material must be heat treated per QQ-N-286. 3.13.1 Fasteners that have been hot or cold headed or roll threaded must be solution annealed followed by age hardening subsequent to all heading and thread rolling operations. The mechanical properties on certifications must be actual properties of the annealed and age hardened material and must meet the requirements of QQ-N-286. 3.13.2 QQ-N-286 fasteners that have been headed and/or roll threaded must not beage hardened unless the material has been solution annealed subsequent to the heading and threading operations. Threads formed after the final age hardening heat treatment must be cut or ground only. 3.14 K-MONEL Fasteners - K-MONEL externally threaded fasteners must have mechanical properties determined in accordance with MIL-DTL-1222. Test results must include Tensile, Yield, Elongation and Hardness as required by MIL-DTL-1222. (The Hardness tests must be performed on a full size fastener.) 3.14.1 Studs require an Axial Tensile test in accordance with MIL-DTL-1222. 3.14.2 Headed fasteners require a Wedge Tensile test as specified elsewhere in this contract/purchase order. 3.15 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories: Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889 FAX: (304) 526-5973 Metallurgical Consultants, Inc. Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351 FAX: (713) 526-2964 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032 FAX: (301) 227-5576 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: (704) 289-4511 FAX: (704) 289-4269 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: (281) 955-6683 3.16 Changes to MIL-T-16420 Mechanical Properties (Table II): Copper Alloy Outside Tensile Yield Strength Elongation in and Temper Diameter Strength (.5% under load) 2" or 4x dia. 715 (70/30)...All.......50,000....18,000............30.0% (min) Fully Sizes Annealed 3.17 MIL-T-16420 UT Changes - Delete paragraph 3.4.3.4 and substitute: "3.4.3.4 Laminations. Tube required to meet the ultrasonic requirements specified in 3.4.3 must be examined for laminar discontinuities that present indications exceeding exploration threshold levels (20 percent for the contact method at +6 db; 30 percent for the immersion method at calibration) must be rejected." 3.17.1 In the second sentence of paragraph 4.4.7; delete "18 inch" and substitute "1 inch". In the last sentence, insert "3.4.3.4 and" before "3.8.2". 3.18 Change to Table VII of MIL-T-16420: The column headed "longer lengths (max)" in all classes of Table VII must be changed to read "longer lengths (min)". All rows in aforementioned column reading "25" must be changed to read "20". The maximum length must be 25 feet per paragraph 3.8.5.2 of MIL-T-16420. Example: Class 700 tube having O.D. of .540 and wall thickness of .065 must be supplied with a minimum length of 12 feet, with 80% (by weight) in lengths of 20 to 25 feet. 3.19 Seat Stack Height Measurement - To ensure that each seat is within tolerance, check each seat individually by measuring the seat height with the ball resting on the seat. Limits are determined by the ball diameter tolerance and the stack height tolerance combined. Refer to CSD171 for recommended methods to measure and calculate stack heights. CSD171 is available in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/. 3.20 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.21 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.21.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.21.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.21.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.22 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly. 3.23 ;Plastisol coating of handwheel is not required.; 3.24 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID T884305644; ) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type "C" on brass or Type "H" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached. 3.25 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing, personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Repair welding is not permitted on ;QQ-N-286 material; . Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.26 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.27 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.27.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.27.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.27.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.28 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.29 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.29.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.30 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.31 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds when the conditions of Section 4.2.1.1 of S9074-AR-GIB-010A/278 are met. 3.31.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.31.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'') 3.31.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.31.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.31.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.31.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.31.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.31.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.31.9 When production or repair welding is required on titanium materials, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.31.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.31.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified thateach LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.31.12 When production welds or repair welds are performed by a subcontractor,the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.32 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.32.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/non-acceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.32.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.32.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.32.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.32.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.33 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.33.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.33.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.34 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.35 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.35.1 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.35.2 The prime contractor must ensure that the purchased product conforms to specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.35.3 The prime contractor must evaluate the requirements of the contract and select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.35.4 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.36 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.36.1 Visual examination upon receipt to detect damage during transit. 3.36.2 Inspection for completeness and proper type. 3.36.3 Verification of material quality received. 3.36.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.36.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.36.6 Identification and protection from improper use or disposition. 3.36.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.36.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.36.9 Material returned to the contractor must be handled as GFM. 3.37 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.37.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein. 3.38 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number for metallic material or batch of non-metallic material, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.38.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.38.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.38.3 Permanent marking must be legible and must be located so as to not affect the form, fit, and function of the material. ;Marking area to be as shown on drawing. Balls to be marked on the airway and Seats to be marked on the outer cylindrical surface.; 3.38.4 Seat Marking - Each seat must be permanently marked in accordance with MIL-STD-792, type I and as stated below, except for Teflon seats, which must only be tagged. Type IX marking may be substituted for type I, provided the minimum character size scribed by the marking tool must be approximately 3/32 inch high to insure legibility. Permanent marking is not permitted on Teflon seats. Seat marking requirements must maintain complete traceability to certification OQE. Seat marking must be either heat/lot or batch number, a vendor traceability number/code, or a combination thereof and must be unique to the material certification. 3.38.5 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the item identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.39 See CDRL-DI-MISC-81020 (Chemical and Mechanical) and CDRL DI-MISC-80678 (SEAT MATERIAL) - Material Certifications - The following material certification requirements apply: 3.39.1 Metallic Material - Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.39.2 Non-Metallic Material - The Contractor must furnish the applicable test reports for each heat/lot/batch of seat material. Material certification test reports must include, in addition to the specification, the class, form, grade, type, process, and/or composition, as applicable, of the material supplied. 3.39.3 Re-identification and re-certification of metallic material is required when the material is subjected to a process which alters its properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below. TRACEABILITY MARKING________________________________________________ (marking on finished item) IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO HEAT/LOT NUMBER _______________ AND HEAT TREAT NUMBER ______________________ (when applicable) _________________________________________ DATE _____________________ (name and signature of auth. co. rep.) 3.39.4 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.39.5 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.39.6 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.40 Material Handling - The written material control process must include the following: 3.40.1 All raw materials must have traceability markings (except as specified below). 3.40.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.40.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.40.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.40.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.40.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.41 Receiving Inspection 3.41.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.41.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.42 Discrepancy Reporting 3.42.1 Nonconforming products must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records will be maintained and available for review by the government Quality Assurance Representative (QAR). 3.43 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.43.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.43.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.43.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.43.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.43.5 Sampling for certification of non-metallic material must be on the basis of one set of test specimens from each heat/lot or batch. 3.44 Additional Marking for Fasteners - Fasteners must be marked in accordance with ;MIL-DTL-1222; . The method of marking must be types I, II, III, V, VIII or IX of MIL-STD-792 except for grades 410, 416 and 431 in the H condition and grades 8, 630, A574, and 4340 which must be marked by method II when marking is applied after the final heat treatment. Markings on fasteners that are to be coated must be marked prior to coating and have a minimum depth of 4 mils. Traceability marking must be legible after the application of protective compounds. 3.44.1 Marking is required for all fasteners regardless of size and must include the material symbol, the manufacturer's identification symbol, and the traceability marking. Marking must be applied on the head of headed fastener (top preferred, side location if necessary). Self-Locking screws must also be marked with six dots. Where no contract invoked specification requirement exists for this marking, self-locking fasteners must be marked with six dots approximately .032" diameter, raised or depressed by approximately .010" located on the top perimeter of the head of the fastener in an arc or circular pattern. The six dots must be distinguishable from all other required markings. 3.45 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address and date. 2. The contract/purchase order number (for example: N00104-11-P-FA12) 3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable). 5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily. 9. Contractor's or authorized personnel's signature. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the Contracting Agency as important, are observed and evaluated. 6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government representative prior to shipment. 6.1.8 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that the material supplied conforms to the specified requirements. 6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits, center-punches, scribes, and tool marks) Surface discontinuities less than 0.005-in

Similar Contracts

Same NAICS industry code

NAICS: 332919
New
Federal
ADAPTER ASSEMBLY CM
Solicitation # N0010426QBC08
The contract pertains to the procurement of an ADAPTER ASSEMBLY CM under solicitation N0010426QBC06, with a closing date extended to June 18, 2026, and pricing valid for 60 days after submission unless otherwise specified. All technical requirements are governed by the Individual Repair Part Ordering Data (IRPOD), which dictates the order of precedence for conflicting documents, with contract amendments and schedules taking priority over drawings, specifications, and standards. Contractors must comply strictly with the revision levels cited in the IRPOD and may not mix revisions without written approval from the contracting officer. The IRPOD is mandatory and accessible via the BPMI e-Commerce portal, requiring pre-registration and password authentication; vendor review of the IRPOD is compulsory. Technical documentation is marked NOFORN and subject to export controls, with distribution restricted to U.S. entities unless prior approval is obtained from Naval Sea Systems Command. Packaging must adhere to MIL-PRF-23199 and MIL-STD-2073 where applicable, with green poly bags permitted only when cleanliness controls from MIL-STD-767, MIL-STD-2041, or similar standards are invoked, and fire-retardant materials are no longer required. Mercury or mercury-containing compounds are prohibited from direct contact with supplied hardware. Quality assurance responsibilities are defined entirely within the IRPOD, requiring contractors to maintain complete inspection records available to the government throughout performance and beyond. Pre-manufacturing submissions, including procedures and drawings, must be submitted within 45 days after contract award and certified according to DI-QCIC-8871, while post-production test and inspection reports must be submitted at contract end per DI-QCIC-8872, both in separate packages keyed to each unique contract line item. All contractual documents are deemed issued upon electronic transmission or mail delivery, and submissions must follow WAWF or alternative electronic means. Pricing must be clearly stated with validity period, and deviations or delays require formal justification including technical evaluation of impact on form, fit, function, and quality, reviewed by the Government Quality Assurance Representative before forwarding to the post-award contracting officer. Compliance with cybersecurity maturity certification, small business set-aside, priority rating for national defense, and security prohibitions under recent deviations is mandatory.
Navsup Weapon Systems Support Mech

POSTED

about 7 hours ago

DEADLINE

in 29 days
View Details
NAICS: 332919
New
Federal
PILOT VALVE ASSY
Solicitation # SPRMM126QKF84
This solicitation, issued by the Defense Logistics Agency (DLA) Mechanicsburg under solicitation number SPRMM126QKF84, seeks the manufacture and delivery of a PILOT VALVE ASSY, with all contractual obligations governed by stringent quality, inspection, and compliance requirements. The contract mandates adherence to MIL-STD-130 Rev N for part marking, prohibits any mercury or mercury contamination in materials due to the sensitive naval applications, and requires strict control over design changes through a defined code system, with only Code 1 changes permitted without formal approval. All items must be sourced from authorized distributors with documented proof of authorization, and contractors must comply with the mandatory use of WAWF for electronic invoice and receiving report submissions. Inspection is to occur at source, and the government retains the right to inspect and reject non-conforming materials at any time, with records of all quality assurance activities retained for 365 days after final delivery. The contract is subject to the Lowest Price Technically Acceptable evaluation method and issued under Emergency Acquisition Flexibilities authority, indicating urgency and constrained procurement pathways. The contractor must be registered in the PIEE EDA system to view orders and modifications, and all communications must be directed to the designated primary point of contact, with mandatory inclusion of the CAGE code 99517 and part number 12052302-1. Subcontractors are bound by the same mercury-free and quality assurance clauses, and any proposed changes to production facilities require written approval and a $250 administrative cost reduction. Compliance with the CMMC Level 1 self-assessment certification and the Small Business Program Representations under NAICS code 332919 is required, alongside adherence to all specified packaging standards under MIL-STD-2073. The solicitation emphasizes electronic submission, with exceptions to solicitation terms requiring immediate follow-up documentation; failure to disclose deviations may result in award based strictly on original requirements, with cost deductions applied for post-award changes. Contractors are also directed to register for automated notifications through NAVSUP WSS to track contract issuances and ensure timely compliance with all procedural and technical obligations.
SPRMM1 DLA Mechanicsburg

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
BODY,VALVE
Solicitation # N0010426QND42
This contract pertains to the supply of a pressure reducing valve housing designated as SPECIAL EMPHASIS Material (Level I/SUBSAFE), intended for critical use in shipboard systems where failure could result in catastrophic consequences including loss of life or vessel. The item must conform strictly to Marotta drawing 281712-0001 and meet exhaustive quality, traceability, and certification requirements outlined in multiple military and industry specifications including MIL-STD-1330, FED-STD-H28, QQ-N-281, and S9074-AQ-GIB-010/248. All materials must be oxygen cleaned, chemically and mechanically analyzed, and traceable from raw stock through final fabrication with unique heat-lot identifiers permanently marked on the part or securely affixed if surface area is insufficient. Welding, brazing, and thread inspection must follow approved procedures with prior submission and Government approval of all qualification data, and no cold-formed internal threads or mercury-containing compounds are permitted. The contractor is required to maintain a certified quality management system compliant with ISO-9001, ISO-10012, and ISO/IEC 17025, or alternatively MIL-I-45208 and MIL-STD-45662, subject to Government audit at any time. All material certifications, including nondestructive testing and weld certifications, must be submitted electronically via WAWF with explicit traceability to individual units, bearing positive, unqualified statements of compliance and electronic signatures that meet strict authentication protocols. No material may be shipped without prior review and acceptance by the Portsmouth Naval Shipyard, and all submissions must be routed through WAWF with designated shipping, inspection, and acceptance identifiers. The contract is issued under Emergency Acquisition Flexibilities, is DO-certified under DPAS, and requires strict adherence to Buy American and small business subcontracting requirements. Any deviation or waiver must be formally requested, classified as Critical, Major, or Minor, and approved by the Contracting Officer. The contractor must also ensure subcontractors comply with all quality, traceability, and documentation standards, and maintain complete records for Government inspection.
Navsup Weapon Systems Support Mech

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
VALVE,BUTTERFLY
Solicitation # SPRMM126QGE70
The contract pertains to the procurement of a butterfly valve under solicitation number SPRMM126QGE70, issued by DLA Mechanicsburg on behalf of the Department of Defense. This is a total small business set-aside requiring compliance with ISO 9001 quality standards and higher-level inspection protocols. The valve must meet MIL-STD-129 marking requirements and be free from metallic mercury and mercury contamination due to its intended use in submarine and surface ship systems; any use of mercury as a functional component requires prior written approval with detailed safeguards and warning labeling. The contractor must be the manufacturer or provide the OEM’s CAGE code and part number, and must submit a surplus certificate if offering surplus materials. All deliveries require electronic submission of receiving reports and invoices via WAWF, and packaging must comply with MIL-STD-2073. The requirement explicitly excludes drawings and technical data, and passive RFID tagging is only applicable if the ship-to location is designated under DFARS 252.211-7006, which currently has no active requirements. The contractor is solely responsible for inspection and quality assurance, with records to be maintained for four years post-delivery. Any design, material, or part number changes necessitate prior government approval and detailed documentation, classified under specific code categories. The offer must remain valid for at least 90 days, and compliance with all document references, including obsolete or cancelled standards obtained via DODSSP, is mandatory. Distributors must provide proof of authorization from the original manufacturer, and all communications and submissions must adhere to strict electronic protocols tied to the PIEE and EDA systems. Contractors are strongly encouraged to register for automated notifications through NAVSUP WSS to stay current on contract modifications and award notifications.
SPRMM1 DLA Mechanicsburg

POSTED

about 7 hours ago

DEADLINE

in 25 days
View Details
NAICS: 332919
New
Federal
STEM,FLUID VALVE
Solicitation # N0010426QND14
This contract pertains to the supply of a stem for a one-inch stop check valve, designated as special emphasis Level I material, critical to the safe operation of a shipboard system, where failure could result in catastrophic consequences including loss of life or vessel. The item must conform strictly to NAVSHIPS drawing 803-2177525 and material specification QQ-N-286, Class A, with stringent controls on chemical composition, mechanical properties, and traceability. No weld repair is permitted on QQ-N-286 material, and all certifications must reflect full compliance with specified standards, including ASTM-E18, FED-STD-H28, MIL-STD-792, MIL-STD-2035, and ISO-9001, among others. Testing and inspection requirements are exhaustive, requiring dye penetrant and ultrasonic inspection, slow strain rate tensile testing performed only by pre-approved laboratories, and hardness verification in accordance with specific correction factors and acceptance limits. All materials must bear permanent traceability markings linked to certification reports, and any alteration of material properties necessitates re-certification with a new traceability identifier. The contractor must maintain an ISO-9001 compliant quality system with ISO-10012 and ISO/IEC 17025 calibration standards, subject to government audit at source. All subcontractors must adhere to the same rigorous controls, with prime contractor oversight required throughout the supply chain. Certification documentation must be submitted via WAWF to Portsmouth Naval Shipyard for review and acceptance prior to shipment, with strict instructions for electronic submission and notification. Electronic signatures are acceptable if controlled and uniquely tied to the signatory. Each item must undergo 100% inspection for traceability, certification completeness, and conformance with zero-defect acceptance criteria, even for small lots. Mercury and mercury-containing compounds are strictly prohibited, and any deviations or waivers require formal approval from the Contracting Officer with classification as critical, major, or minor. Contract delivery is FOB destination, and the solicitation is part of an emergency acquisition under DPAS priority rating, with the award binding only upon bilateral acceptance. All data, including engineering change proposals and configuration controls, must be managed with government oversight, and documentation must be submitted in electronic formats as required.
Navsup Weapon Systems Support Mech

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
TUBE FITTING
Solicitation # N0010426QEC58
The contract pertains to the procurement of a tube fitting designated by part number 4-6 F5BU-M, supplied by Parker Hannifin Corp (CAGE 30780), under solicitation N0010426QEC58 issued by the Naval Supply Systems Command Weapon Systems Support Mechanical. The technical requirements are fully defined by the part number and associated procurement documentation, with no additional drawings or technical data provided. Compliance with specification revisions is mandatory, and any deviation from the stated requirements—including material, design, or delivery schedule—must be formally requested and justified in advance, with supporting technical data submitted for evaluation. The contractor must ensure the product is free of mercury or mercury-containing compounds, and packaging must adhere to MIL-PRF-23199 standards where cleanliness control is invoked, specifically utilizing MIL-DTL-24466 green poly bags only if the part falls under specified cleanliness criteria. A Certificate of Compliance per DI-MISC-81356 must be submitted with each delivery, alongside adherence to all applicable quality assurance and inspection protocols. The contract operates under a fixed-price structure with pricing valid for 60 days after the closing date, and all contractual documents are deemed officially issued upon electronic transmission or deposit in the mail. The ordering precedence hierarchy clearly establishes that amendments to the contract take priority over all other documents, followed by the schedule, terms and conditions, and then referenced standards. Federal mandates require compliance with cybersecurity maturity certification, small business set-aside provisions, veteran and disability equal opportunity policies, and national defense priority ratings. The contractor must also comply with mandatory use of the Workflow Pro mod assist module for payments and adhere to strict security prohibitions, including exclusion of restricted information from foreign nationals. Documentation must include accurate distribution statements per DoDI 5230.24, with delivery and data submission timelines aligned to the DD Form 1423 requirements, where final submission is due at contract end. The place of performance and point of contact are centralized at the NAVSUP WSS-MECH office in Mechanicsburg, PA, with primary correspondence routed through the designated contracting officer.
Navsup Weapon Systems Support Mech

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
ELBOW,5IN
Solicitation # N0010426QEA20
The contract pertains to the procurement of a 5-inch elbow under solicitation N0010426QEA20, issued by the Naval Supply Systems Command Weapon Systems Support (NAVSUP WSS) Mechanical Division, with a response deadline of August 17, 2026. It incorporates a comprehensive set of federal and military requirements, including mandatory use of the Wide Area Workflow payment system, cybersecurity maturity certification, small business set-aside status, and strict compliance with inspection, packaging, and quality assurance standards defined in the Individual Repair Part Ordering Data (IRPOD). Technical documentation referenced in the IRPOD, drawings, and specifications—many marked NOFORN—must be obtained through the secured BPMI e-Commerce portal and adhered to in their full, cited revisions, with no partial use of document revisions permitted without explicit contracting officer approval. The order of precedence clearly establishes that contract amendments take priority over all other documents, followed by the schedule, terms and conditions, IRPOD, STRs, drawings, and specifications. Quality assurance is governed by the IRPOD, requiring the contractor to maintain a government-acceptable inspection system with full records retained for the contract duration and beyond. Packaging must comply with MIL-PRF-23199, particularly regarding heat-sealed envelopes for components subject to cleanliness controls from MIL-STD-767, MIL-STD-2041, or similar standards, while fire-retardant packaging is explicitly no longer required. Mercury and mercury compounds are strictly prohibited from contact with supplied hardware. The contractor must submit pre-manufacturing procedures and test reports within 45 days of award and upon contract completion, using standardized DD Form 1423 sequences as specified in DI-QCIC-8871 and DI-QCIC-8872. All submissions must be prepared per unique contract, NSN, and item nomenclature combinations, and distribution of technical data is restricted based on DoD distribution codes, with foreign nationals explicitly prohibited from access without prior Naval Sea Systems Command authorization. The contracting officer must approve all deviations, delivery delays, or non-conformances with full justification and technical data supporting the proposed alternative.
Navsup Weapon Systems Support Mech

POSTED

about 7 hours ago

DEADLINE

in 11 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 334412
New
Federal
59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Solicitation # N0010426QDB44
This contract pertains to the repair and modification of a circuit card assembly under a firm-fixed-price arrangement, requiring strict adherence to technical specifications and quality standards mandated by the U.S. Navy. The solicitation mandates a Repair Turnaround Time of 53 days, measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility system, with final government inspection and acceptance essential before completion. All repairs must comply with MIL-STD-130 Rev N for marking and follow the original manufacturer’s technical directives, drawings, and approved repair procedures. The contractor is responsible for all inspections and testing, maintaining complete records for at least 365 days post-delivery, and must not substitute components without prior written approval from the contracting officer, with specific code classifications governing any design or part number changes. The contract enforces mandatory compliance with Federal Acquisition Regulation clauses including Buy American, cybersecurity maturity certification, small business subcontracting, and security prohibitions, while also requiring the use of Workflow Pro for payment and invoice processing. Freight is FOB Origin and handled by the Navy under CAV guidelines, with all quotes required to specify unit price, total price, and RTAT, or explain capacity limitations if unable to meet the 53-day requirement. The solicitation applies only to authorized distributors of the original manufacturer, and proof of authorization must be submitted with the offer. All documents and data are subject to distribution restrictions as defined by OPNAVINST 5510.1, and any requests for controlled documents must follow formal government channels. The award will be bilateral, contingent upon the contractor’s written acceptance, and pre-populated subcontract clauses define maximum RTAT, throughput capacity, and induction expiration dates not exceeding 365 days.
Bare Printed Circuit Board Manufacturing

POSTED

about 7 hours ago

DEADLINE

in 15 days
View Details
NAICS: 332991
New
Federal
LOWER BEARING ASSY
Solicitation # N0010426QYA7K
This contract is for the manufacture and delivery of the Lower Bearing Assembly #1, a specialized component for use on U.S. Navy submarines, under a 100% small business set-aside solicitation identified as N0010426QYA7K. The requirement demands strict adherence to specific engineering drawings and a comprehensive set of technical standards including MIL-STD-973, MIL-STD-130N, MIL-STD-2035A, ISO 9001, ISO/IEC 17025, and multiple NAVSEA technical publications. The contractor must implement a robust quality inspection system, submit and obtain prior government approval for detailed test plans, welding procedures, nondestructive testing protocols, and first article inspection reports. All production units require 100% dimensional and nondestructive inspection, including visual and liquid penetrant testing of welds, thread inspections to ASME B1.3 systems, and certification of material composition through mill reports. Each component is subject to permanent marking per MIL-STD-130 with traceability by heat, lot, batch, and serial number. The contract requires full documentation of objective quality evidence for all materials and processes, including certified mill data, weld rod certifications, heat treatment records, material compliance certificates, and welder and inspector qualification records. Mercury contamination is strictly prohibited, and any use of mercury or mercury-bearing materials requires explicit written approval from the Procurement Contracting Officer with detailed protective measures and warning labeling. All deliveries must be accompanied by a Mercury Exclusion Certification. The contract uses FOB destination terms, requires electronic submission of invoices and receiving reports through WAWF/IRAPT, and sets a 1-year warranty after delivery with a 45-day defect discovery window. The Naval Surface Warfare Center, Philadelphia Division (NSWCPD), serves as the accepting activity with DODACC N64498 and is responsible for reviewing and approving all contractual data items, technical submissions, and final inspections. The government reserves the right to inspect at any point during manufacturing, and contract compliance is mandatory throughout the supply chain, including subcontractors. The solicitation closes on July 30, 2026, with evaluation based on balanced consideration of price and non-price factors such as delivery lead time and verified past performance.
Ball and Roller Bearing Manufacturing

POSTED

about 7 hours ago

DEADLINE

in 25 days
View Details
NAICS: 335931
New
Federal
ADAPTER
Solicitation # N0010426QEC52
The contract pertains to the procurement of an ADAPTER under solicitation N0010426QEC52, issued by the Navsup Weapon Systems Support Mech under the Department of Defense, with a NAICS code of 335931. The solicitation mandates strict compliance with technical and quality requirements outlined in the Individual Repair Part Ordering Data (IRPOD), which contractors must review prior to submission, as access is mandatory and requires pre-registration via the BPMI e-Commerce website. Delivery and performance are subject to stringent document control, where the IRPOD, drawings, technical data, and referenced military specifications form the basis of contractual obligations, with a defined order of precedence that prioritizes contract amendments, schedules, and terms in descending order. All technical documentation is marked with distribution restrictions, including NOFORN designations, requiring explicit government approval for any transmission to foreign nationals. Contractors must adhere to specified revision levels of referenced documents and may not mix revisions without written approval, and any deviations or waivers, particularly for critical repair parts, require detailed justification including technical data, impact assessments, and coordination with the Government Quality Assurance Representative. Pricing is valid for 60 days after the closing date, with clear instructions to specify alternative validity periods if applicable. Packaging must conform to MIL-PRF-23199 and other invoked standards, especially where cleanliness controls from MIL-STD-767, MIL-STD-2041, or similar documents apply, allowing only heat-sealed envelopes for components under such controls; the use of fire-retardant packaging is expressly prohibited. The contract includes mandatory compliance with cybersecurity maturity certification, small business set-aside requirements, priority ratings for national defense, and prohibitions against the intentional use of mercury. All contractual documents are deemed issued upon electronic transmission, and acceptance of the proposal constitutes bilateral agreement. Technical data delivery is governed by DD Form 1423 requirements, with specific codes dictating inspection and acceptance authority, submission frequency, deadlines, and data classification, including mandatory submission of a Certificate of Compliance per DI-MISC-81356 with each delivery. Data pricing categories are defined, with most items expected under Group I or II, requiring cost calculations based on direct labor, overhead, G&A, and profit, and no charge may be indicated only where data is commercial in nature and trivial in cost. All submissions must be made through the designated electronic portal, and failure to meet procedural and technical requirements will result in rejection without review
Current-Carrying Wiring Device Manufacturing

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334412
New
Federal
59--GPI-MBS CCA
Solicitation # N0010426QEA78
The contract pertains to the procurement of five units of NSN 7H-5998-017261855, identified as 59--GPI-MBS CCA, to be delivered to DLA Distribution Norfolk, Virginia. The Government intends to award this contract on a sole-source basis under FAR 6.302-1 due to the exclusive nature of the part, as the rights to the data required for its purchase or repair are not owned by the Government and cannot be acquired, developed, or obtained through any other means, and reverse engineering is deemed uneconomical. While the notice is not a solicitation for competitive bids, responsible sources may submit statements of capability or proposals within 45 days of the notice, or 30 days if award is made under an existing Basic Ordering Agreement, and all submissions will be evaluated to determine whether competition is feasible. The Government retains full discretion to decide whether to proceed without competition based on responses received. Award depends on the offeror, product, or manufacturer meeting all qualification requirements at time of award, as stipulated by FAR clause 52.209-1, and the solicitation will specify where to obtain further qualification details. Market research has determined that FAR Part 12 commercial item acquisition policies will not apply, but interested parties may still indicate if they can provide a commercial item equivalent within 15 days of the notice. The solicitation is managed by the Naval Supply Systems Command Weapon Systems Support, with primary point of contact Rebecca Aglow in Mechanicsburg, Pennsylvania.
Bare Printed Circuit Board Manufacturing

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335931
New
Federal
CABLE ASSEMBLY,MAIN
Solicitation # N0010426QQB84
This contract solicits repairs for the CABLE ASSEMBLY,MAIN and POWER SUPPLY under solicitation N0010426QQB84, with a response deadline of July 27, 2026. The Navy requires a Repair Turnaround Time of 90 days, measured from physical receipt of the defective asset at the contractor’s facility as recorded in the Commercial Asset Visibility system, with delivery to be FOB Origin. All repairs must conform to manufacturer specifications, MIL-STD-130 marking standards, and approved technical documentation, with no substitutions permitted without prior written approval from the NAVICP-MECH Contracting Officer. The contractor is responsible for all inspection, testing, and quality control activities and must maintain complete records for 365 days after delivery. Government Source Inspection is mandatory, and the Navy handles all freight under the CAV Statement of Work. The contract is a firm-fixed-price arrangement, and failure to meet the 90-day RTAT will result in monthly price reductions per unit, up to a specified maximum, without limiting the Government's right to terminate for default. The solicitation is restricted to authorized distributors of the original manufacturer, requiring proof of authorization to be submitted with the offer. Pricing must be justified, especially if exceeding historical rates or if the item is new to NAVSUP WSS, with supporting documentation such as prior invoices or commercial pricing data required. An option exists to increase the quantity to 28 units within 365 days of order receipt, at the same unit price. Both items are subject to Buy American and cybersecurity maturity certification requirements, and all documents provided by the Government carry distribution restrictions under OPNAVINST 5510.1, including potential NOFORN status. The award will be issued bilaterally upon the contractor’s signed acceptance, and all quotes must include unit price, total price, and RTAT, with separate T&E fees specified if an item is deemed beyond repair. The point of contact is Jacob Davis at N7M2.9 with email JACOB.T.DAVIS18.CIV@US.NAVY.MIL.
Current-Carrying Wiring Device Manufacturing

POSTED

about 7 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 335312
New
Federal
28--MOTOR ASSY
Solicitation # N0010426QEC86
This contract is for the manufacture of eight motor assemblies, identified by NSN 1H-2895-016280105-PP and part number N0010426X7547, to be produced in full compliance with the IRPOD and technical data package, version 003. The deliveries are due 180 days after contract award and must be shipped to two designated DLA distribution locations: New Cumberland, Pennsylvania, and Tracy, California. The solicitation number is N00104-26-Q-EC86, and all proposals must be submitted fully completed and signed before the response deadline of September 21, 2026. Government source inspection and Reports of Test Inspection are mandatory requirements for acceptance. This acquisition is entirely set aside for small business concerns under FAR clause 52.219-6, and only responsible small business entities are eligible to respond. Technical documents including drawings, IRPOD, and STRS are accessible only through a secured online portal at logistics.unnpp.gov, requiring prior registration and password access, and hard copies will not be mailed. Military and federal specifications and qualified product lists can be obtained via the DOD Single Stock Point or assist-online.gov. The offer must be submitted in English and in U.S. dollars, and the procurement is not conducted under commercial item acquisition policies. The contract is managed by the Naval Supply Systems Command Weapon Systems Support, with Blake V. Barrick as the primary point of contact, and interest is open to all qualified small business suppliers meeting the stated criteria.
Motor and Generator Manufacturing

POSTED

about 7 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 335311
New
Federal
CBL ACTR/LOCK PWR
Solicitation # N0010426QNE12
This contract pertains to the manufacture and quality assurance of the CBL ACTR/LOCK PWR component, governed by specific engineering drawings and technical standards including MIL-STD-129 for marking, MIL-STD-973 for configuration control, and NAVSEA S9320-AM-PRO-020/MLDG for manufacturing certification. The item is intended for use on submarines or surface ships, mandating strict mercury-free requirements to prevent contamination of sensitive systems, with any proposed use of mercury requiring prior written approval and detailed safety protocols. Suppliers must maintain an ISO 9001 quality system and are responsible for all inspections, records, and compliance, with government oversight reserved at any stage. Configuration changes, deviations, or waivers must be formally approved and documented through specified channels to NAVICP-MECH in Mechanicsburg, PA. The solicitation, issued under N0010426QNE12 by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania, is subject to emergency acquisition flexibilities and will be awarded as a rated order under the Defense Priorities and Allocations System. It is a total small business set-aside with mandatory compliance with Buy American Act provisions, Small Business Subcontracting Plans, and cybersecurity maturity certification requirements. All contractual documents are deemed officially issued upon electronic transmission, and award requires bilateral acceptance. Vendors must adhere to stringent packaging standards under MIL-STD-2073, provide certified test reports for each assembly, and ensure subcontractors meet all terms. Proposals are due by September 8, 2026, and technical inquiries must be directed to the designated point of contact, James E. Lewis, via official email.
Power, Distribution, and Specialty Transformer Manufacturing

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332722
New
Federal
NUT,HEX,SELF-LOCKIN
Solicitation # N0010426QFE05
This contract mandates the supply of self-locking heavy hex nuts designated as Special Emphasis Level I material, critical to shipboard systems where failure could result in catastrophic consequences including loss of life or vessel. The material must conform to MIL-DTL-32258 with specific chemical and mechanical requirements tied to QQ-N-281 Class A or B, and the self-locking element must comply with ASTM-D6456 or ASTM-D4066 depending on temperature rating. Traceability is strictly enforced through unique heat-lot markings on each component and mandatory certification documentation that must directly link to the physical item, with no transcription permitted. All certifications must include full compliance statements signed by authorized personnel, with disclaimers strictly prohibited. Quality assurance systems must comply with ISO-9001, ISO-10012, and ISO/IEC 17025 or an acceptable alternative including MIL-I-45208 and MIL-STD-45662, subject to government audit at source. First Article Testing requirements are satisfied through prior qualification data or letters from qualified sources, and all material must undergo 100% inspection for traceability marking, certification completeness, and nondestructive testing results. Delivery is governed by a strict schedule requiring certification data submission 20 days prior to shipment and formal acceptance by Portsmouth Naval Shipyard via the WAWF system before any material may be shipped. Final delivery must occur no later than 365 days after contract award, with the order rated DO for national defense priorities. Materials must be mercury-free, marked in accordance with MIL-STD-792, and all internal threads must be cut, not cold-formed. Subcontractor oversight, material handling procedures, and re-certification after processing are tightly controlled, and any deviation or waiver requires prior written approval from the Contracting Officer. All documentation must be submitted electronically through ECDS and WAWF, with notifications sent to designated Navy email addresses, and compliance is monitored under emergency acquisition flexibilities.
Bolt, Nut, Screw, Rivet, and Washer Manufacturing

POSTED

about 7 hours ago

DEADLINE

in 12 days
View Details
NAICS: 314999
New
Federal
CLOTH,FIBERGLASS
Solicitation # N0010426QED21
The contract pertains to the procurement of fiberglass cloth under solicitation N0010426QED21, issued by the Naval Supply Systems Command Weapon Systems Support, Mechanical, located in Mechanicsburg, Pennsylvania. Pricing is valid for 60 days after the closing date, with submission required via email or NECO specifying the validity period if different. All contractual documents are deemed issued upon electronic transmission, and acceptance of the proposal constitutes bilateral agreement. The scope prioritizes Section C over Section D in case of conflict, and compliance is mandatory with all referenced technical documents obtained via the BPMI e-Commerce site, which requires pre-registration and password access. The Individual Repair Part Ordering Data (IRPOD) is central to defining requirements and must be thoroughly reviewed by the vendor. Applicable documents include MIL-I-45208 for quality requirements, MIL-PRF-23199 for packaging with specific clarifications on cleanliness controls and poly bag usage, and MIL-STD-2073 for general packaging, with fire-retardant materials no longer required. Technical data packages must be submitted per DD Form 1423 instructions, with clear delineation of deliverables and inspection codes. All technical documentation is marked NOFORN, requiring strict control and prior approval for any foreign dissemination. Quality assurance is governed by the IRPOD, requiring the contractor to establish and maintain an inspection system acceptable to the government, with all inspection records retained throughout contract performance and beyond. The contractor must comply with specified revisions of drawings and specifications cited in the IRPOD and may not mix revisions unless approved in writing by the contracting officer. Deviations or waiver requests must include detailed justification, technical data supporting functional equivalence, and must be submitted through the Government Quality Assurance Representative within five working days. Mercury and mercury-containing compounds are strictly prohibited. All deliveries must meet the delivery schedule, with authorization to ship requiring prior PCO approval. Test reports under MIL-DTL-24244 must be submitted in two formats: a comprehensive package to the PCO within 45 days after award, and one copy attached to each delivered item. The contract mandates full compliance with small business program representations, veteran and disability equal opportunity policies, cybersecurity maturity model certification, priority rating for national defense, and security prohibitions as outlined in applicable federal deviations. The place of performance and delivery location is undefined, with payment governed by Wide Area Workflow instructions and invoicing via combined invoice and receiving reports.
All Other Miscellaneous Textile Product Mills

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336310
New
Federal
PUMP, FUEL INJECTIO
Solicitation # N0010426QJB72
This contract, issued under Emergency Acquisition Authority, pertains to the procurement of a PUMP, FUEL INJECTION with a solicitation number N0010426QJB72 and a response deadline of September 8, 2026. It is a firm-fixed-price procurement requiring strict adherence to military specifications, including MIL-STD-130 Rev N for marking, and mandates compliance with naval quality assurance standards that place full responsibility on the contractor for inspection, records retention for 365 days post-delivery, and total conformity of all delivered items. The contract includes a mandatory option to increase quantities within 365 days of award, with pricing locked at the original unit rate unless otherwise agreed, and enforces strict traceability requirements: distributors must provide official authorization from the original equipment manufacturer, and all pricing must align with historical or commercial benchmarks—failure to do so requires justification. Delivery is FOB Origin, and the Government retains the right to conduct inspections at any point. The contract incorporates several critical administrative and compliance components including the mandatory use of Workflow Pro Assist Module, prohibition against unauthorized substitutions without written approval, and detailed codes governing design or part number changes. Security exclusions and classified document handling procedures are strictly enforced, with special controls on NOFORN and Official Use Only materials. The contractor must comply with DoD small business subcontracting requirements and annual certifications, while also accepting performance penalties—up to a specified maximum per unit per month—for delays exceeding the required turnaround time, with unexcused delays potentially leading to termination for default. All documentation must reference the correct Cage Code (1Y875 and 0VP52) and associated reference numbers, and any change to the item must be formally approved by the NAVICP-MECH Contracting Officer. The contract is bilateral, requiring the contractor’s signed acceptance prior to execution, and is issued under a Deviation that modifies standard FAR provisions, particularly regarding representations, inspections, and payment procedures, all administered through the Navy Supply Systems Command in Mechanicsburg, Pennsylvania.
Motor Vehicle Gasoline Engine and Engine Parts Manufacturing

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details