Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Commerce was posted on July 12, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Vessel Overhaul and Scheduled Maintenance

Closed
NCND6021-11-03053SRGFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
DIBBS
CYLINDER, HYDRAULIC ACC
Solicitation # SPE7M0-27-T-0456
Solicitation SPE7M0-27-T-0456 is a fixed-price request for quotations issued by the DLA Weapons Support Maritime Supply Chain ESOC Buys for one hydraulic accumulator cylinder, NSN 2090-01-450-1199. The item is to be delivered to the Puget Sound Naval Shipyard IMF in Bremerton, Washington, with a required delivery lead time of five days after order. Inspection and acceptance will occur at the destination per FAR 52.246-2. Quotations must be submitted via the DIBBS system by October 30, 2026. The contract mandates strict adherence to technical and quality standards, including Item Unique Identification (IUID) per MIL-STD-130 and DFARS 252.211-7003, and packaging requirements per RP001 and MIL-STD-2073-1E. Technical data for this item is subject to ITAR or EAR export controls, requiring contractors to have approved JCP certification and specific DLA authorizations. Additionally, the hardware must not contain intentionally added mercury, and the government will not evaluate offers utilizing additive manufacturing unless specifically authorized. Compliance with the Buy American Act and the Berry Amendment is required for quotes above the micro-purchase threshold. Evaluation includes a price preference for certified HUBZone Small Business Concerns. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and payment, and adherence to DFARS 252.204-7012 for safeguarding covered defense information.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN ESOC BUYS

POSTED

1 day ago

DEADLINE

in 3 days
NAICS: 336611
New
Federal
NONSKID FOR NAVAL SHIPS/VESSELS
Solicitation # N4002727R0004
Solicitation N4002727R0004 is a total small business set-aside for a single Indefinite Delivery, Indefinite Quantity (IDIQ) firm fixed price contract to provide nonskid deck covering removal and replacement for U.S. Navy ships and other government vessels. The work will be performed at Naval Station Mayport, Florida, and within 50 miles of the facility. The contract spans five ordering periods from March 15, 2027, through March 14, 2032. The scope includes surface preparation meeting SSPC-SP10/NACE 2, SSPC-SP 11, and SSPC-SP12 WJ-3/NACE 5 standards, with the application of MIL-PRF-24667 Type I, IV, V, or XI nonskid materials. Award will be based on a competitive trade-off source selection process evaluating best value, with a heavy emphasis on past performance involving U.S. Navy surface combatants and price fairness. The contractor must adhere to ASQ/ANSI/ISO 9001:2015 quality standards and utilize the Wide Area WorkFlow (WAWF) system for electronic invoicing. Key requirements include the submission of an Access Control Plan for non-U.S. citizen employees and compliance with CMMC cybersecurity levels and Buy American regulations. Liquidated damages are tailored at two percent per calendar day, capped at ten percent. Proposals are due by November 30, 2026, and must be submitted in three volumes covering price, past performance, and pre-award information.
Southeast Regional Maintenance Center

POSTED

2 days ago

DEADLINE

in 29 days
NAICS: 336611
New
Federal
CGC KUKUI DRYDOCK
Solicitation # 70ZU0227QIBCT0001
Solicitation 70ZU0227QIBCT0001 is an Indefinite Delivery Requirement Contract (IDR) for the FY27 drydock availability of the USCGC KUKUI (WLB 203), a 225-foot Buoy Tender homeported in Sitka, Alaska. The project involves comprehensive drydock repairs, including extensive preservation of the hull, exterior decks, superstructure, ballast and potable water tanks, and various internal mechanical components. Performance will take place at the contractor's facility from February 2, 2027, to May 18, 2027, with an anticipated award date of January 18, 2027. This requirement is a total small business set-aside under NAICS code 336611, with a size standard of 1,300 employees. The award will be granted to the responsible quoter providing the most advantageous quote, based on a lowest-price technically acceptable basis. Evaluation factors include a pass/fail assessment of technical capability and past performance within the last three years. Contractors must provide a comprehensive execution plan for lodging and messing, facility certifications, and docking calculations in accordance with SFLC Standard Specifications 0740 and 8634. Quotes must be submitted via email by November 23, 2026, and must include a detailed technical proposal separate from the pricing sheet. Order limitations are set with a minimum order of 1,000 dollars and a maximum combination order of 7 million dollars.
CG-SEA-C22

POSTED

2 days ago

DEADLINE

in 22 days
NAICS: 336611
New
Federal
NAVY NP FENDER RENEWAL
Solicitation # 70Z04027Q60514Y00
The U.S. Coast Guard Surface Forces Logistics Center is soliciting quotes for a Firm Fixed Price Purchase Order to perform a rubber fender system renewal on a 108-foot Yard Patrol Craft. The scope of work includes the removal of existing upper and lower fendering, securing bars, and hardware from the exterior hull and transom, followed by the installation of new rubber fenders and associated hardware. Specific requirements include replacing up to 60 linear feet of CRES securing flat bars and 75 linear feet of mounting plates and oak shims, as well as installing new studs, nuts, and washers. The government will provide 24 Type-D black EPDM fenders as government furnished material located at the Coast Guard Yard in Curtis Bay, Maryland, which also serves as the place of performance. This is a total small business set-aside conducted under FAR Part 13 Simplified Acquisition Procedures, with awards based on best value considering technical requirements, deadlines, and price. All work must be completed by December 11, 2026. Quotes must be submitted via email to Erica Gibbs by November 16, 2026, at 9:00 am Eastern. Payment will be processed via Net 30 terms through the IPP system, and no down or advanced payments will be provided. Vendors must be able to secure funding until delivery and may need to be registered in the Joint Certification Program to access export-controlled drawings.
CG-SEA-C23

POSTED

2 days ago

DEADLINE

in 15 days
NAICS: 336611
New
Federal
Voyage Repair (VR)
Solicitation # N6817127QN006
Solicitation N6817127QN006 is a Request for Quote issued by NAVSUP FLC Sigonella Naples Office for firm fixed price non-commercial voyage repair services for the USS RAFAEL PERALTA (DDG 115). The work is to be performed in Mombasa, Kenya, with a period of performance from November 12, 2026, to November 18, 2026. The scope of work includes hull maintenance such as high-pressure fresh water washing, cleaning and inspection of air conditioning and refrigeration plant condensers, rust and corrosion removal, replacement of lagging and insulation, furniture upholstery replacement, and the provision of rigging services and scaffolding. All work must adhere to NAVSEA Standard Items and SCF Part 1915 Occupational Safety and Health Standards for Shipyard Employment. Award will be granted to the lowest priced technically acceptable offeror, with technical capabilities rated as either acceptable or unacceptable. Prospective contractors must submit a completed J-1 Price Breakdown in US dollars, a draft Test and Inspection Plan, and a signed Use and Non-Disclosure Agreement to access restricted technical data. Required submission documentation includes Standard Form 18, completed Standard Form 30 amendments, and technical qualifications verified via the Attachment J-3 checklist. The deadline for proposal submission is November 2, 2026, at 13:00 CET. Post-award invoicing must be processed electronically through Wide Area WorkFlow.
Navsup Flc Sigonella Naples Office

POSTED

2 days ago

DEADLINE

in 1 day
NAICS: 336611
New
Federal
Full & Open Brand Name OEM "Curtiss-Wright Electro-Mechanical Corp" - Low Pressure Air Compressor (LPAC) Maintenance Services
Solicitation # N0040627Q0004
Fleet Logistics Center Puget Sound is soliciting a firm-fixed-price, full and open brand name requirement for Low Pressure Air Compressor (LPAC) maintenance services in support of SRF-JRMC Sasebo, Japan. The scope of work involves providing all labor and genuine OEM parts from Curtiss-Wright Electro-Mechanical Corp to replace the Air End Assembly (Part Number ML12535266G1) for a Dresser-Rand Company Model GSS-200 rotary compressor on the USS SAN DIEGO (LPD-22). Key tasks include disassembly, cleaning, inspection, drive coupling alignment, and an operational test, with all work adhering to Job Specification 38DXA55115-A01 and MIL-STD-162B cleaning standards. Performance is expected to be completed by November 23, 2026. The government will select the most advantageous offer based on technical capability, including the delivery date, past performance, and price, with a 10 percent price evaluation preference for HUBZone small business concerns. Because this is a brand name requirement, offerors must provide OEM documentation establishing the authenticity of parts and services, including traceability and warranties, to be deemed compliant. Invoicing must be processed through Wide Area WorkFlow (WAWF), and all packaging and marking must comply with ASTM-D-3951 and MIL-STD-130. The procurement is categorized under NAICS code 336611 and includes standard FAR and DFARS clauses regarding safety, security, and commercial services.
Navsup Flt Logistics Ctr Puget Sound

POSTED

2 days ago

DEADLINE

in 3 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

CHANNEL ISLANDS NATION MARINE SANCTUARY 113 HARBOR, SANTA BARBARA, CA, 93109, USA

Set-Aside

SBA

Documents

1
DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Noaa
Contacts1 person available
OfficeSEATTLE, WA, 98115, USA
Organization / AgencyDepartment Of Commerce Noaa
Office AddressSEATTLE, WA, 98115, USA
Contacts
Suzanne A Romberg-Garrett

Full Description

Show more
COMBINED SYNOPSIS/SOLICITATION Vessel Overhaul and Scheduled Maintenance (I) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice and in accordance with the simplified acquisition procedures authorized in FAR Part 13. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (II) This solicitation is issued as a request for quotation (RFQ). Submit written quotes on RFQ Number NCND6021-11-03053SRG. (III) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-52. (IV) This solicitation is being issued as a Total Small Business Set-Aside. The associated NAICS code is 811219. The business size standard is $19.0M. (V) This combined solicitation/synopsis is for purchase of the following commercial services: CLIN 0001 - Vessel Overhaul and Scheduled Maintenance (VI) Description of requirements is as follows: See attached statement of work which applies to requirement. (VII) Period of performance shall be August 1, 2011 through February 20, 2112: (VIII) FAR 52.212-1, Instructions to Offerors -- Commercial Items (June 2008), applies to this acquisition. (IX) FAR 52.212-2, Evaluation - Commercial Items (Jan 1999), applies to this acquisition. Offers will be evaluated based on price and the factors set forth in paragraph (a), and award will be made to the firm offering the best value to the Government. Paragraph (a) is hereby completed as follows: Evaluation will be based on 1) Past Performance - quote shall included two references including the phone number, full address and email and contractor's past performance will be based on responsiveness, quality, and customer services, 2) Ability to meet all requirements for Vessel Overhaul and Scheduled Maintenance in the scope of work, and 2) Price. The Government intends to award a firm-fixed price purchase order on an all or none basis. (X) The offeror must submit a completed copy of the provision at FAR 52.212-3, Offeror Representations and Certifications - Commercial Items (Mar 2011), with its quote. The offeror shall complete the annual representations and certifications electronically at http://orca.bpn.gov . (XI) The clause at FAR 52.212-4, Contract Terms and Conditions - Commercial Items (June 2010) applies to this acquisition. (XII) The clause at FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Items (APR 2011) applies to this acquisition. The following clauses under subparagraph (b) apply: (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jul 2010) (Pub. L. 109-282) (31 U.S.C. 6101 note). (10)(i) 52.219-6, Notice of Total Small Business Set-Aside (June 2003) (15 U.S.C. 644). (20) 52.219-28, Post Award Small Business Program Rerepresentation (Apr 2009) (15 U.S.C. 632(a)(2)). (23) 52.222-3, Convict Labor (June 2003) (E.O. 11755). (24) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (July 2010) (E.O. 13126). (25) 52.222-21, Prohibition of Segregated Facilities (Feb 1999). (26) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246). (28) 52.222-36, Affirmative Action for Workers with Disabilities (Oct 2010) (29 U.S.C. 793). (35) 52.223-18, Contractor Policy to Ban Text Messaging While Driving (Sep 2010) (E.O. 13513). (37)(i) 52.225-3, Buy American Act-Free Trade Agreements-Israeli Trade Act (June 2009) (41 U.S.C. 10a-10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, Pub. L. 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, and 110-138). (42) 52.232-33, Payment by Electronic Funds Transfer-Central Contractor Registration (Oct 2003) (31 U.S.C. 3332). (XIII) The following clauses are also applicable to this acquisition: 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) 52.252-2 Clauses Incorporated By Reference (Feb 1998), This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/far/index.html (End of Clause) The following additional FAR terms and conditions apply: 52.214-34, Submission of Offers in the English Language (Apr 1991) 52.214-35, Submission of Offer in U.S. Currency (Apr 1991) 52.217-8, Option to Extend Services (Nov 1999) 52.223-1, Biobased Product Certification. (Dec 2007) 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (Dec 2007) 52.223-3, Hazardous Material Identification and Material Safety Data (Jan 1997) 52.223-4, Recovered Material Certification (May 2008) 52.223-5, Pollution Prevention and Right-to-Know Information (Aug 2003) 52.223-10, Waste Reduction Program (Aug 2000) 52.223-11, Ozone-Depleting Substances (May 2001) 52.223-13, Certification of Toxic Chemical Release Reporting (Aug 2003) 52.223-14, Toxic Chemical Release Reporting (Aug 2003) 52.228-5, Insurance - Work on a Government Installation (Jan 1997) 52.237-2, Protection of Government Buildings, Equipment, and Vegetation (Apr 1984) Department of Commerce Clauses: 1352.201-70, Contracting Officer's Authority (Apr. 2010). The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price. (XIV) Defense Priorities and Allocations System (DPAS) and assigned rating do not apply. (XV) Quotes are required to be received in the contracting office no later than 4:30 P.M. Mountain Standard Time on July 21, 2011. All quotes must be faxed or emailed to the attention of Suzanne Romberg-Garrett through email contact@example.gov. The fax number is +1 (555) 000-0000. (XVI) Any questions or inquiries regarding this solicitation should be directed to the following three persons: Suzanne Romberg-Garrett through email contact@example.gov no later than 4:30 p.m. MST, July 15, 2011. STATEMENT OF WORK Requisition # NCND6021-11-03053 Statement of Work - Dry Dock 2011/2012 Shearwater R-6201 6-7-11 PLEASE BREAK OUT PRICE FOR ALL ITEMS AND PROVIDE PRICING IN THE SAME ORDER AS THE STATEMENT OF WORK. A] GENERAL INFORMATION Summary The Channel Islands National Marine Sanctuary (CINMS) requires dockside work and a dry-docking period to conduct routine repairs and maintenance. Background The Shearwater is a 62' long, 72 Gross Ton catamaran research vessel that supports scientific and educational missions in Channel Islands, and Southern California Coast. The Shearwater has a beam of 24' and a draft of 6.0'. Benefits to the government and public from proposed work This work must be accomplished no later than February 20, 2012, in order to conduct research and education missions in the Channel Islands National Marine Sanctuary. Vessel Availability Prior to Bid The vessel will be made available June 24th in Santa Barbara Harbor for Inspection prior to bidding, should potential bidders require seeing the vessel in person to assemble an accurate bid. All potential bidders shall coordinate with Vessel Operations Coordinator no later than one week prior to arrange a visit. Bidding The contractor shall include labor and materials quotes for each of the base and option items. Period of Performance August 1st 2011 to February 20th, 2012. Schedule The vessel is an emergency response vessel and needs to be available in case of an emergency. The work requiring the vessel to be out of the water for this contract shall be completed in 30 calendar days from when work first commences. The contractor shall coordinate with the Vessel Operations Coordinator to determine when work first commences and the vessel is hauled out. The haul out is anticipated to occur on or about December 1st, 2011, however this may change to a later date within the period of performance. Work that can be conducted with the vessel alongside in a Mediterranean moorage, subject to harbor regulations, may commence at the vessel's berth in Santa Barbara Harbor on October 3rd, 2011, but is subject to the availability of the vessel and shall be coordinated with the Vessel Operations Coordinator. Work conducted with the vessel alongside shall not impede the operability of the vessel for more than 5 consecutive calendar days at a time, and must be completed within 15 total days. If alongside work does not take place in Santa Barbara Harbor, it shall be conducted alongside at a facility provided by the contractor either before or after the haul out, however not to exceed 15 calendar days beyond the 30 calendar days associated with out-of-the-water work. Work that may be conducted with the vessel alongside is denoted with an asterisk (*). Location The contract shall propose the location for repairs. The vessel is to be transported at sea by the government to and from the repair facility. The government shall asses the cost of $30/per Nautical Mile at sea from Santa Barbara Harbor, to and from the proposed repair facility in determining the lowest cost proposal. The government shall include the travel costs of a Santa Barbara-based inspector in accordance with the JFTR (Joint Federal Travel Regulations) during the entire duration of repairs NOT conducted in Santa Barbara to determine the lowest cost proposal. Acceptance of Work Upon completion of the work, the vessel shall be sea trialed by the CINMS vessel crew with a representative of the contractor aboard to ensure the work has been satisfactorily completed. Any corrections to work performed, if required, will commence immediately upon return to the shipyard, and be completed as expediently as possible. The need for corrective work after sea trials will not be grounds for extending the performance period beyond that stated above. B] BASE WORK ITEMS 1] Drydock, cleaning, inspection, undock: The vessel shall be lifted in a drydock; marine railway; or by travel lift rated for 75 tons or greater. The vessel shall be blocked without list or trim. The vessel shall not be lifted by a sling or crane which does not allow for even, vertical support of the entire vessel. There are strap marks indicated by orange triangles imprinted on the exterior vessel to mark lifting locations. See NOAA Research Vessel shearwater R-6201 Drawing 800-001 "Docking Plan" to plan for lifting requirements. 1.1 Submittals A] Signed by a qualified independent firm attesting that the drydock; travel-lift; or railway, and associated controls and machinery, are in good sound condition and have adequate capacity to safely drydock the vessel. The certification shall be based on a visual inspection of the facility within the 12-month period immediately preceding the scheduled drydocking, operating and maintenance records of the facility, and recent demonstration of the facility's capacity (e.g., record of the largest vessel drydocked during the preceding 6 months). B] Provide a letter certifying that the Dock Master in charge of the docking and undocking evolutions is professionally qualified, through training and experience, to conduct the evolutions in a safe and reliable manner. C] Prepare and submit a drydocking and undocking procedure which includes operating practices, special precautions that are required by the characteristics of the dock or vessel, depth of water, and tide and current conditions which will exist. D] Provide a fire control plan that outlines the Contractor's ability to handle any fire or emergency without the use of any NOAA vessel systems. This shall include fire watch procedures. All hot work shall be approved 24 hours in advance by the COTR or his designated representative. All spaced designated for hot work shall be certified to be safe for hot work by an independent marine chemist. 1.2 Preparations for Drydocking A] Arrange the blocks in the Contractor's Facility; drydock; or railway in accordance with the ship's docking plan. Blocks shall be positioned to haul the vessel in the position specified in the detail specification item. In the event the detail specification item does not specify a docking position, the COTR or his/her designated Representative shall specify the docking position. B] The minimum height of keel blocks shall be as specified on the ship's docking plan or the detail specifications. In event a conflict exists between the docking plan and the detail specifications, the detail specifications take precedence. If not specified on docking plan or in the detail specifications, the minimum height shall be 36 inches. All keel blocks shall have 2 inches minimum soft wood caps. C] Insure that all sea chests, discharges, transducers, domes, and other appurtenances are clear of all blocks. There shall be no obstructions between the floor surface of the drydocked location and the hull, hull openings, appendages, and fittings. Ample horizontal and vertical clearance shall be provided for removal and replacement of rudders, bow thrusters, fathometers, sea scanners, and sonar gear on the ship, whether or not such removals or replacement are known to be required. D] Docking arrangements will be agreed upon during a pre-docking conference. This conference shall be attended by, as a minimum, the COTR or his/her Designated Representative; the Contractor or his/her Designated Representative; the Dock Master; and a NOAA Marine Engineer. This conference shall be arranged sufficiently prior to the docking date to permit the incorporation of all details required in the docking. Docking arrangements will be agreed upon during a pre-docking conference. 1.3 Docking Information If requested, The COTR or his/her designated representative will provide the Contractor with the following information gathered from the Vessel Operations Coordinator: A] Place and date of last docking. B] Last docking position. C] Dates and file numbers of last two docking reports and interim docking reports (if any). D] Number of days underway since last docking. E] Paint history for last complete painting. F] History of touch-up painting. G] Tank sounding report. H] List of any relevant data for any alterations accomplished on the vessel which may affect the docking operations but are not shown on the docking drawing. I] Data for use in carrying out stability calculations from Ship's Damage Control Book and Booklet of General Plans. 1.4 Drydocking A] After obtaining the consent of the COTR, or his representative, carefully haul-out the vessel without strain or injury, in a drydock; a travel lift; or marine railway. If any tendency to strain or injure the ship is observed, immediately re-float the vessel and rearrange the blocks/slings or make other corrections required to relieve the condition. B] As the extremity of the vessel first to enter the dock reaches the dock sill, and the vessel is pointed fair for entering the drydock; marine rail; or vertical lift platform, the Contractor's Dock Master relieves the vessel's Operator in Charge of responsibility for the safety of the vessel. At this point, the Contractor's Dock Master also relieves NOAA of the operational control of the vessel. C] Contractor's Dock Master shall center the vessel on the keel blocks, using centering bobs, sighting battens and other appropriate equipment. The vessel shall be kept centered over the keel blocks during the pumping down or raising operations. D] Contractor's Dock Master shall direct the pumping out or lifting operations. It is mandatory to use divers during certain circumstances, such as when: - Docking drawing is in question; - Vessel is damaged; - Blocks are suspected of being damaged or moved during docking; - Contractor's adherence to the docking drawing is in question. E] Shores, when used, shall be placed in position only after the vessel has landed fore and aft, but prior to the vessel reaching its draft at instability. Should a shore buckle, the Contractor's Dock Master shall stop pumping or raising operations, set up the next shore, and replace the buckled shore. F] Contractor's Dock Master shall note the drafts on the vessel and observe that the vessel lands at the proper points with respect to the draft. Record the fore and aft draft mark readings of the vessel prior to drydocking and after undocking. G] The Contractor's Dock Master shall stop the drydock pumps or raising of the vertical lift platform, and, if necessary, re-flood the dock or lower the platform in case: - The ship takes an undue list when landing; - The ship lands before the water has dropped to the proper depth; - A shore buckles (buckled shores shall be replaced); - COTR or designated representative observes any unsafe operations or operations that may endanger the vessel. H] Installation of gangways and service lines shall be deferred until after the vessel has landed and side blocks are in position. If a gangway is needed promptly, it may be suspended by a crane during the pumping down or raising operations. Service lines shall be promptly installed after the vessel has landed and side blocks are in position. The Contractor shall provide the mooring lines, government owned mooring lines are not to be used. I] As soon as possible, after the vessel has landed and side blocks are in position, a grounding cable or grounding strap shall be attached between the vessel and dock to protect the ship from the effects of electric storms and welding. J] The COTR or his/her Representative and the Contractor's Dock Master shall remain on site until the dock is pumped out sufficiently to permit personal examination of all blocks. Any irregularities found shall be corrected and any necessary shoring shall be placed before the COTR or his/her Representative and the Contractor's Dock Master leave the dock or the vertical lift facility until the facility is raised sufficiently to permit personal examination of all blocks and correction of any irregularities found. In all such cases, the docking crew shall likewise remain at the facility to assist as needed. The dock basin shall be washed down to remove silt, mud, and debris immediately after the vessel is drydocked. 1.5 Action After Docking A] As soon as practical, but in all cases within 2 hours after drydocking the vessel, clean the entire underwater hull and boot-topping shall be cleaned of marine growth, dirt, and loose paint using stiff brushes, scrapers, and high pressure (minimum of 3000psi) fresh water. Included shall be sea strainer plates, sea chests, bow thrusters, rudders, propellers, shafts, struts, and other underwater hull appendages. B] Exercise extreme care to avoid scratching, gouging or otherwise damaging any transducers, dome windows, shaft coverings or other appendages. C] Clean transducers using non-metallic, non-abrasive brushes. Do not use scrapers on transducers. D] Within 24 hours after drydocking, remove all sea chest covers, strainer plates, rope guards, and fairwaters. After completion of all inspections and acceptance of inspection condition reports by the COTR, reinstall the items removed. E] Provide adequate staging, or other safe means acceptable to the COTR, to accomplish all contract work and to permit a thorough inspection (see below) of the underwater body. F] Clean all anodes with a non-ferrous wire brush to remove all corrosion products. 1.6 Drydocking Inspection A] Within 24 hours after drydocking, a joint inspection of the vessel's underwater hull shall be conducted by the Contractor, the COTR or his/her Designated Representative, and the Sanctuary Superintendent's Representative. Submit a Condition Report of the inspection's findings within 48 hours of inspection. The inspection shall include the following: B] Condition of the hull, particularly inspecting for evidence of structural damage and deterioration of plating, welds, and fasteners. C] Condition of anodes and paint system. D] The condition of propulsion shafts, propellers; sea chests; overboard discharge piping; foil; fins; transducers; and all other underwater hull appendages. Inspect for evidence of leaks, damage, and deterioration. E] Remove the void plugs in underwater hull rub rails, rudders, struts, fairing plates, bilge keels, and other inaccessible underwater voids. As the plugs are removed, inspect for drainage of water from the voids. If water is present, advise the COTR prior to proceeding. 1.7 Underbody Propulsion & Rudder Inspection A] Conduct a drydocking inspection of the propulsion shafts that includes the following: - Both propulsion shafts run-out using a calibrated dial indicator; - Both Propulsion shaft clearance measurements in the cutlass bearings in the strut and intermediate/hull bearings. These measurements are to be taken at the 90, 180, 270, and 360 degree positions using extended length feeler-gauges; - Rudders are to be inspected for excessive bearing wear and alignment. Bearing wear can be determined either by pull test measurements or by extended feeler-gauges. Rudder alignment is measured from port to starboard rudder leading edges and port and starboard trailing edges. B] All these measurements are to be presented in writing to the COTR or his/her representative to be analyzed by the Office of National Marine Sanctuaries (ONMS) Marine Engineer. 1.8 Transducers Clean, protect, and paint all transducers as follows: A] Clean the exposed surfaces of each transducer while the surfaces are still damp. Clean transducers with non-metallic brushes. Do not use scrapers. B] Degrease the faces of rubber-faced transducers with mineral spirits and rinse with fresh water. Do not use detergents on the rubber faces. Swab metallic-faced transducers with a solution of one part nitric acid to five parts fresh water, and follow with rich soapy water wash and fresh water rinse. Polish metallic-faced transducers with crocus cloth. C] Coat all metallic-faced transducers with one coat of anti-fouling same as prescribed for the remainder of the underwater hull. This is to be accomplished by removing the plywood protective covers immediately prior to applying the last coat of paint to the underwater hull. All painting shall be in accordance with the paint manufacturer's printed recommendations and instructions. D] NOAA reserves the right to inspect and adjust transducers. E] Except when work is being performed on the transducer, cover the transducer faces with a plywood protective cover. Do not apply props or forced pressure on the face of the transducers. 1.9 Temporary Services Contractor is to provide all labor, tools, and materials to provide electrical power and to ensure the overall security of the vessel. A] The contractor shall provide all labor and materials to provide clean electrical power, 240VAC, Single Phase, 50 amp service. B] The contractor shall provide security protection to prevent theft, vandalism, fires, flooding, collisions, and to ensure the vessel is properly stored and/or safely moored. C] The contractor is to ensure that all welding leads, air hoses, debris/trash is removed from the vessel at the end of the work day. 1.10 Undocking A] Prior to the commencement of undocking all debris, trash, and loose material shall be removed from the vessel. B] After all work requiring drydocking has been completed, carefully undock the vessel. Flood the drydock or lower the railway or travel lift until all the underwater openings are covered with water, but without lifting the vessel off the blocks or lifting straps. Provide adequate personnel and check for leaks. If leaks are found, re-dock the vessel and repair the leaks. If no leaks are found or after repair of all leaks, continue with undocking the vessel after the COTR or her Designated Representative has given authorization to proceed. C] Unless authorized by the Contracting Officer, the vessel shall not be undocked until all work which requires drydocking has been completed. This includes all work incorporated into the initial contract award and any options or modifications activated throughout the performance period. D] This also includes all additional work authorized or being negotiated. In the event the Contractor desires to undock the vessel and subsequently re-dock the vessel for completion of work; the contractor shall submit to the Contracting Officer a letter which clearly outlines the reasons for such a request. E] If the Contracting Officer decides to grant the request, the extent of Government's liability for costs related to the undocking and re-docking shall be limited to the additional lay-day costs for which the Government would be liable if the vessel were not undocked and re-drydocked. 1.11 Tests/Inspections/Reports Inspections and condition reports shall be submitted to the COTR. 2] Touch up bottom paint After the vessel has been clean and all hull repairs are complete, the contractor shall touch up the Intersleek 700 bottom paint as needed, including the rudders, waterline, foil and areas where plate repairs were conducted. Manufacturer's procedures will be used in all cases. Color to match existing coatings. Contractor is to have a certified paint inspector or and OEM representative oversee the application process, and notify the COTR between applications for inspection. The contractor will ensure that all the environmental conditions are within the manufacture's specified parameters during all work. Inspection and condition reports shall be submitted to the COTR prior to painting and after painting. 3] Propspeed or Equivalent Application The contractor shall renew the Propspeed coating on the propellers, shafts, and other items of running gear that are coated with this material. Follow manufacturer's instructions for preparation and application. 4] Replace PORT and STBD stripe The contractor shall remove and replace the existing hull side stripe positioned between the upper and lower guards. The area will be cleaned with a fine Scotch-bright pad (or equivalent) to remove excessive oxidation before replacement. If corrosion exceeding 10% of the plate thickness is discovered, provide a condition-found report including a proposal and cost to rectify the corrosion. 5] Renew stern lettering The contract shall remove the existing "Shearwater" lettering decal from the transom, and replace it with either a new decal or marine grade paint, whichever provides the longest projected service life. Clean the hull surface in way of the lettering prior to application. 6] Pressure test foil, hull guards, and strakes The contractor will pressure test to 3 PSI the main foil, all hull side guards, and all hull bottom strakes to ensure watertight integrity. Provide a condition-found report after testing, and include recommendations for any required repairs. 7] Hull weld crack repair The contactor shall repair structural cracks identified at the time of the pre-bid inspection. Welders will be certified by USCG or ABS. Contractor will provide sketches or annotated photographs of all repairs made. 8] Port engine room hull plate repairs The contractor shall identify all areas of shell plate pitting in the port engine room. Known areas of pitting include underneath the dive compressor, and near the main engine cooling water sea chest. Repairs will be made by clad-welding all pits found to be from 10% to < 25% thickness of the hull plating. The contract shall indentify any other areas in the port engine room with pits in excess of 25% thickness, and these will be repaired by cropping out and replacing the plate in accordance with USCG standards. Welders will be certified by USCG or ABS. Contractor will provide sketches or annotated photographs of all repairs made. Upon completion of work, test all repairs with exterior high-pressure air and interior soapy water to ensure watertight integrity . 9] Port lazarrette hull plate repairs The contractor shall identify all areas of shell plate pitting in the port engine room. Known areas of pitting include the port lazarette chine seam on the outboard side. Repairs will be made by clad-welding all pits found to be from 10% to < 25% thickness of the hull plating. The contract shall indentify any other areas in the port lazarette with pits in excess of 25% thickness, and these will be repaired by cropping out and replacing the plate in accordance with USCG standards. Welders will be certified by USCG or ABS. Contractor will provide sketches or annotated photographs of all repairs made. Upon completion of work, test all repairs with exterior high-pressure air and interior soapy water to ensure watertight integrity . 10] Design and install rudder stops* The contractor shall design and install rudder stops for the port and starboard rudders. The rudder stops shall be designed to stop the tiller arms when hard-over rudder is applied in either direction. The stops will act against the tillers only, not against the tie rods or other linkages. The stops shall be constructed of suitable marine grade materials, and shall be cushioned to prevent damage of the tiller arms. Stops may be welded or bolted into place. All fasteners will be stainless steel, and all nuts will be nylocs. 11] Hatch seal replacement* The contractor shall replace the hatch seals in all Freeman hatches aboard, including four (4) square knife edge seals and three (3) oval compression seals. After replacement of seals, adjust the hatch dogs to ensure hatches are watertight. Upon completion of work, hose test the hatches to demonstrate watertight integrity. 12] Windshield repairs* The contractor shall remove all degraded sealant and apply new sealant around the external perimeter of all forward windshield frames except the far port unit. The contractor shall replace the far port windshield in kind, matching frame design, glazing tint (if any), and installation method. The contractor shall ensure that the interior wood trim of all windshields, if disturbed by this work, is returned to original condition. Upon completion, hose test all windshields to ensure there are no leaks. 13] Detroit Series 60 main engine service* The contractor will have all preventative maintenance and service recommended by DDA for an engine of 9000 hours and nine (9) years of service performed on the port engine. The contractor will have all preventative maintenance and service recommended by DDA for an engine of 8000 hours and nine (9) years of service performed on the port engine. Provide a written report describing all work performed. Upon re-launching of the vessel conduct dock trials and sea trials to demonstrate proper operation of the engines and related systems. 14] Engine CAC housing supports* The contractor shall replace broken Charge Air Cooler (CAC) housing support brackets on the port and starboard engines. Either stock Detroit Diesel parts or after-market parts may be utilized for this repair. The new brackets will be primed and painted to match the engines. Provide one (1) spare bracket for future use. Provide a written report defining what parts were used. 15] Main engine cooling water piping The contractor shall inspect the cooling water intake circuits on the P&S main engines. The contractor shall determine whether or not the plumbing from the intake thru-hull to the main engine water pump is free of leaks. Provide a written report describing conditions-found, and describing repairs procedures and costs. 16] Port engine room fuel line repairs* The contractor shall repair all leaks in the port...

More opportunities from Department Of Commerce Noaa

Same awarding agency

NAICS: 561210
New
Federal
Fairbanks Command and Data Acquisition Station (FCDAS) for Operations and Maintenance Services
Solicitation # 1332KP26R0041
Solicitation 1332KP26R0041 is a combined synopsis and request for proposal issued by the Department of Commerce NOAA for operations and maintenance services at the Fairbanks Command and Data Acquisition Station in Alaska. This performance-based service contract is set aside 100 percent for small business concerns and requires the contractor to maintain 24x7x365 operations for a National Critical Asset, averaging 135 satellite contacts daily. The scope of work includes staffing, ground systems operation, risk management, information technology, facilities operations, environmental health and safety, property management, and security guard services. The period of performance consists of a base period from June 1, 2027, through May 31, 2028, with four subsequent option periods extending through May 31, 2032. The acquisition utilizes a Best Value Tradeoff process, evaluating technical approach, management approach, and past performance, which combined are approximately equal in importance to price. Offerors must hold an active Facility Clearance with the Defense Counterintelligence and Security Agency to be eligible for award. Labor is heavily governed by prevailing wage determinations and Collective Bargaining Agreements with the Fairbanks Joint Crafts Council and Teamsters Local 959. The contract structure employs a mix of Firm Fixed Price and Time and Materials CLINs, with a total estimated procurement value of 1,525,000 dollars. Proposals are due by November 19, 2026, and must be submitted via email to the designated points of contact.
Facilities Support Services

POSTED

3 days ago

DEADLINE

in 18 days
View Details
NAICS: 483114
New
Federal
Hawaii National Marine Sanctuary Vessel Charter Services
Solicitation # 26-3064
The National Oceanic and Atmospheric Administration is conducting market research via a Sources Sought Notice to identify small business sources for vessel charter services supporting the Office of National Marine Sanctuaries. The requirement focuses on resource protection and monitoring missions within the Northwestern Hawaiian Islands, specifically supporting the Papahānaumokuākea National Marine Sanctuary. The anticipated contract will be an Indefinite Delivery-Indefinite Quantity (IDIQ) vehicle with an ordering period from July 1, 2027, to June 30, 2032. Primary operations typically occur between May 1 and September 30, with August being the optimal window, though emergency response may occur outside these dates. The contractor will be responsible for transit to study locations, providing meals and berthing accommodations, and supporting research operations, including the launch and recovery of small boats. Key technical requirements include maintaining a valid Certificate of Inspection or USCG Letter of Designation, adhering to NOAA Small Boat Standards and Procedures, and ensuring the vessel is equipped with an OLE type-approved Vessel Monitoring System. Environmental compliance is critical, requiring external hull inspections for invasive species within 14 days of departure and rat-free certification within 48 hours. The effort falls under NAICS code 483114, with a small business size standard of 550 employees. Interested sources must submit a capability statement and rough order of magnitude estimate to the contracting specialist by November 17, 2026.
Coastal and Great Lakes Passenger Transportation

POSTED

4 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS