This Solicitation opportunity from Utah was posted on October 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Vineyard City All-Wheels Concrete Skate Park
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Vineyard City is soliciting design-build proposals for the construction of a 16,000 square foot public, non-supervised All-Wheels Concrete Skate Park in Utah. The selected vendor is responsible for creating construction documents based on provided conceptual designs and executing the build using durable cast-in-place concrete. The facility must adhere to current safety standards regarding flow and traffic patterns for all skill levels and ensure proper drainage. The project scope extends beyond the skate park to include surrounding amenities such as a 24-stall asphalt parking lot with two ADA-compliant spaces, a 375-foot by 8-foot asphalt trail, 6,000 square feet of landscaping, a two-stall restroom facility, a drinking fountain, lighting, benches, and bike racks. Technical execution must align with provided geotechnical, topographical, and wetland delineation reports, with specific requirements for seismic design per the 2021 International Building Code and OSHA standards for Type B soils during excavation. Proposals are due by October 27, 2026, via the Bonfire portal and must be limited to 20 pages. Required submission elements include a company profile, three similar project references from the last five years, a detailed project organization and approach, a line-item budget, and verification of bonding, insurance, and licensing. The city anticipates contract negotiations by November 4, 2026, with a final contract signing by November 16, 2026.
General Info
Agency
Place of Performance
Set-Aside
Documents
19AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Imperial Irrigation District – East Highline ReservoirOpen now, due in 18 days
- Request for Quote for Reservoir Seismic Retrofit And Replacement Project For Bella Vista ReservoirOpen now, due in 4 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
The notice title changed. The notice description changed.
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
The selected vendor shall provide both: 1. Construction documents for the All-Wheels Concrete Skate Park, per the Conceptual Design Documents provided. 2. Build the All-Wheels Concrete Skate Park
The City’s objective is to provide a 16,000 square foot public non-supervised All-Wheels Concrete Skate Park constructed with permanent, durable cast-in-place concrete and must meet the safety standards for current skateparks, including: flow, traffic patterns, and other aspects that pertain to various skill and ability levels, and ensures proper drainage.
More opportunities from Utah
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
