Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Vineyards at El Dorado Hills/Z16-0002/PD16-0001/TM16-1528

Forecast
ELD-60174-R2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Streambed Alteration Agreement EPIMS Notification Number ELD-60174-R2 for applicant Harinder Johl, pursuant to section 1602 of the Fish and Game Code. Located in El Dorado County at an unnamed tributary to the American River, the project involves mass grading for 31 single-family homes, including related roads and infrastructure. This work includes grading residential lots and road segments situated upslope and within approximately 100 feet of seasonal wetlands and ephemeral drainages within Hill View Estates. A key component of the project is the construction of the Unit 2 Crossing, a bridge over an ephemeral drainage designed to provide access to residential parcels along Road A. The crossing will feature a structural plate arch with a 29-foot span and an 8-foot 3-inch rise, supported by a concrete footing and engineered backfill. The design requires a minimum 10-foot setback between the bridge footing and the drainage edge, with rock slope protection or geotextile fabric applied as needed. A Notice of Determination dated January 29, 2026, confirms that the project will not have a significant environmental effect within the jurisdiction of the California Department of Fish and Wildlife, provided that imposed mitigation measures are followed.

General Info

CDFW agreement for Harinder Johl to build 31 homes and bridge in El Dorado.

Agency

California → El Dorado County

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → El Dorado County
Contacts2 people available
OfficeN/A

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number ELD-60174-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Harinder Johl. The project is limited to the mass grading for 31 single-family homes, related roads and infrastructure, and construction of the Unit 2 Crossing. CDFW Project 1 includes mass grading of residential lots, infrastructure, and road segments upslope and within approximately 100 feet of ephemeral drainages and seasonal wetlands within Hill View Estates. CDFW Project 2 consists of the construction of a bridge crossing over an ephemeral drainage. The Unit 2 Crossing will provide access to residential parcels along Road A of Hill View Estates. The crossing will be a structural plate arch, with a 29-foot span and an 8-foot 3-inch rise, founded on a concrete footing. Engineered backfill will be used along the width of the crossing. Rock slope protection and/or geotextile fabric may be used as needed. A minimum 10-foot setback will be established between the bridge footing and the edge of the drainage.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
T6026-1 North River Gap Sidewalk Project
Solicitation # 27-018
The City of Sandy Springs is soliciting bids for the T6026-1 North River Gap Sidewalk Project, which involves the construction of approximately 300 linear feet of sidewalk on the east side of North River Drive, spanning from 100 North River Drive to 501 North River Parkway. The scope of work includes site preparation through the removal of granite, concrete, and vegetation, the supply and grading of clean fill and topsoil, the reconstruction of two driveways, and the installation of ADA-compliant ramps. All work must adhere to Georgia Department of Transportation (GDOT) Standard Specifications and the Manual of Uniform Traffic Control Devices (MUTCD), with materials sourced from GDOT certified suppliers. The project requires a 75-day performance period from the issuance of the Notice to Proceed, with work permitted on weekdays from 8:00 AM to 5:00 PM and traffic-interfering activities restricted to 9:00 AM to 4:00 PM. Bids for solicitation 27-018 must be submitted by January 7, 2027. Required documentation includes a bid schedule, price certification, drug-free workplace certification, and a Georgia Security and Immigration Compliance Act affidavit. A bid bond is mandatory if the bid price exceeds $100,000, and the successful contractor must provide performance and payment bonds, as well as a certificate of insurance. Key deliverables include before-and-after project videos, independent testing for concrete and sub-grade compaction, and a two-year warranty on sod installation. There is no specified set-aside status for this solicitation.
City of Sandy Springs

POSTED

about 8 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
International
EN27TFM021 South Peter FSR Extension - Arrow
Solicitation # EN27TFM021
The EN27TFM021 South Peter FSR Extension - Arrow is a Major Works Contract for forest road construction issued by the BC Timber Sales Branch of the Province of British Columbia. The scope of work involves mobilization and demobilization, site preparation including clearing and debris disposal, and roadway and drainage excavation such as embankments, ballasting, and excavation in solid rock. The project is located in British Columbia, Canada, and requires the contractor to commence work immediately upon execution of the agreement, with completion dates defined in the contract schedules. Award is based on identifying the lowest compliant bidder, with evaluation factors focusing on the bidder's technical experience, qualifications, and possession of necessary machinery and equipment. Key requirements include mandatory BC Forest Safety Council SAFE certification for all subcontractors and adherence to strict camp standards regarding health, sanitation, and water safety. The contract is administered by the Minister of Forests through the Kootenay Business Area, with payments typically processed between 30 to 60 days after invoice certification. Bidders must provide bid security, and the successful contractor is required to provide performance and labour and material payment bonds, as well as WorkSafe BC coverage.
BC Timber Sales Branch

POSTED

about 9 hours ago

DEADLINE

in 21 days
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS