Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on March 7, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

W25G1V22Q0074 Sprinkler System Upgrade

Closed
W25G1V22Q0074Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

333999 - All Other Miscellaneous General Purpose Machinery Manufacturing

Place of Performance

Tobyhanna, PA, 18466, USA

Set-Aside

SBA

Documents

15

22Q0074 Attachment 6 - Standard NEPA Specifications

PDF, High priority: read this firstspecifications
High

22Q0074+Amendment+0001.pdf

PDF

22Q0074+Attachment+10+-+22Q0009+1-27+RFIs+%286%29.pdf

PDF

22Q0074+Attachment+11+-+B221+Pictures.pdf

PDF

22Q0074+Attachment+12+-+DRY+PIPE+SPRINKLER+SYSTEM++FIRE+PROTECTION_22Q0009.pdf

PDF

22Q0074+Attachment+13+-+Price+Shedule+Breakdown.xlsx

XLSX

22Q0074+Attachment+1+-+SOW+Sprinkler+Upgrade+Bldg+221.pdf

PDF

22Q0074+Attachment+2+-+Appendix+C-TYAD_Design+Submission+Requirments+SEPT2018-R3.2.pdf

PDF

22Q0074+Attachment+3+-+Appendix+D-TYAD_CADD+Standards_SEP2018-R4.0.pdf

PDF

22Q0074+Attachment+4+-+Appendix+G+-+Electrical+Design++Construction+Standards+rev+date+01-09-18.pdf

PDF

22Q0074+Attachment+5+-+Appendix+H+-+Mechanical+Design+and+Construction+Standards+July+2015.pdf

PDF

22Q0074+Attachment+7+-+Appendix+J+-+Fire+Detection++Suppression+revision+Oct+2018+%28Feb+19%29.pdf

PDF

22Q0074+Attachment+8+-+Appendix+K+-+Contractor+Safety+Standards+June+2018.pdf

PDF

22Q0074+Attachment+9+-+Wage+Determination+03-02-22.pdf

PDF

22Q0074+Solicitation+-+Sprinkler+Upgrade.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W0ML USA Deputy Tobyhanna
Contacts2 people available
OfficeTOBYHANNA, PA, 18466-5079, USA
Office AddressTOBYHANNA, PA, 18466-5079, USA

Full Description

Show more
PLEASE REFER TO SOW FOR A DETAILED DESCRIPTION 1. GENERAL 1.1 Overview: Provide all Plant, Labor, Materials, Licenses, Permits, Equipment, Supervision and Management to complete the design and construction services associated with the Building 221 (Teen CDC) sprinkler upgrade. Any and all exceptions shall be in writing and labeled as such. Design services shall include site evaluations, design concept meetings and concept drawing reviews, preparation of construction specifications, construction drawings, and requests for information and construction cost estimates. Area specific details are included on the provided building drawing. Dimensions and depictions on drawing are to be field verified by potential bidders as Tobyhanna Army Depot is not responsible for accuracy of provided drawings. The sprinkler system will be designed in conformance with the latest edition of Unified Facilities Criteria (UFC) 3-600-01, National Fire Protection Association (NFPA) 13 and American Society of Sanitary Engineering (ASSE) 1015. All installed equipment shall be labeled by Underwriters Laboratories (UL) or another U.S. recognized testing agency. The equipment will be acceptance tested per UFC. The fire suppression system shall be Water-Based Dry-Piped throughout the entire structure. The building consists of a basement, living quarters, and attic (three (3) floors). A full analysis shall be conducted to determine the sprinkler main is adequately sized to allow the sprinkler system to provide full guaranteed coverage throughout the building. Mechanical rooms, electrical rooms and fire sprinkler riser rooms shall be classified as - HC-2. A hydrant flow test will be required. UFC requires schedule 40 steel pipe, 12 pounds per square inch (psi) loss through the back flow and 500 Gallons per minute (GPM) hose stream, which all increase the overall system hydraulic demand. 1.2 Site Visit: In order to gain an understanding of the Bldg. 221 sprinkler project, we suggest that potential bidders attend a scheduled site visit. 1.3 Key Elements: It is the Contractor's responsibility to relocate any and all items that may interfere with the construction of the new sprinkler system. Example; conduits, gas piping. Amendment 0001 was added to the attachments with the following change: The reason for this amendment is to change the site visit date from Tuesday, March 15th, 2021 to Tuesday, March 15th 2022.

More opportunities from Department Of Defense → W0ML USA Deputy Tobyhanna

Same awarding agency

NAICS: 334413
Federal
Microelectronics Sourcing Capability for Tobyhanna Army Depot (RFI 2)
Solicitation # MicroelectronicsSourcingforTYAD2
The U.S. Army Contracting Command and Tobyhanna Army Depot are conducting market research through a Request for Information to identify qualified Original Component Manufacturers and Tier-1 direct distributors capable of supplying commercial-off-the-shelf, industrial, and defense-grade microelectronics. The primary goal is to move away from decentralized, broker-dependent procurement toward resilient, long-term direct relationships to support Circuit Card Assembly integration. The government is seeking partners who can sustain large-scale production volumes, ranging from hundreds of thousands to multi-million-unit annual runs, while maintaining vendor-managed inventory and the ability to handle rapid demand surges. To ensure supply chain integrity and anti-counterfeiting, the government requires strict provenance tracing from raw silicon and wafer fabrication through assembly and testing. Compliance with DoDI 5200.50, DFARS 252.246-7007/7008, and quality systems such as ISO 9001, AS9100, or IATF 16949 is essential, with AEC-Q200 qualification preferred for multilayer ceramic capacitors. Interested respondents must submit a capability package by October 27, 2026, detailing their corporate profile, supply tier classification, and manufacturing capacity. This RFI is for planning purposes only and does not constitute a formal solicitation or obligation for contract award.
Semiconductor and Related Device Manufacturing

POSTED

13 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS