Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Transportation was posted on July 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WA NP MORA 11(1), Fryingpan Creek Bridge

Closed
69056726B000001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 11 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 17 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Fryingpan Creek Bridge project, designated as WA NP MORA 11(1), is a federal highway construction initiative under the U.S. Department of Transportation’s Federal Highway Administration, Western Federal Lands Division, located in Mount Rainier National Park, Washington. The project involves replacing the existing steel arch girder bridge with a new 218.5-foot steel plate girder bridge featuring a concrete deck, along with associated roadway realignment, construction of new parking facilities, replacement of four culverts, installation of rip rap on abutments, addition of a log jam structure, and stone masonry work. The scope includes significant earthwork, erosion and sediment control, drainage, traffic management, and environmental mitigation measures, particularly concerning in-water work in Fryingpan Creek and Stream D culvert between June 15 and August 15 of 2027, 2028, and 2029. The project also requires a “soft start” for pile driving, use of airguns or airhorns before blasting, application of biodegradable vegetable-based oil in all equipment operating near or in waters, and archaeological monitoring by a qualified professional. The work must comply with the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), and the total estimated cost falls between $10 million and $20 million, with a projected completion in summer 2029. This sealed bid solicitation, numbered 69056726B000001 and issued on May 12, 2026, with a bid submission deadline of June 18, 2026, is governed by the Federal Acquisition Regulation and demands strict adherence to physical and procedural requirements. Bids must be submitted in sealed envelopes by the specified local time, with no electronic submissions accepted. Offerors are required to submit a fully completed SF 1442, a bid bond per FAR 52.228-1, an Authority to Sign document, accurate SAM registration including UEI and CAGE codes, and completed representations and certifications. A HUBZone small business receives a 10% price preference in evaluation, with award based solely on lowest price after adjustment. Key contractual obligations include furnishing performance and payment bonds within 10 days of award, beginning performance within 10 days of the notice to proceed (expected by August 4, 2026), and ensuring

General Info

Replace steel arch bridge with steel plate girder bridge; roadway, culverts, masonry included; completion 2029.

Agency

Department Of Transportation → 690567 Western Federal Lands DivisionView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

WA, USA

Set-Aside

NONE

Documents

(28)

QA Document for WA NP MORA 11(1) Fryingpan Creek Bridge Project

PDFq-and-a

QA Document for WA NP MORA 11(1) Fryingpan Creek Bridge Project

PDFq-and-a

Amendment A003 to Solicitation 69056726B000001 for Fryingpan Creek Bridge

PDFamendment

Amendment A005 to Solicitation 69056726B000001 for Fryingpan Creek Bridge

PDFamendment

QA for WA NP MORA 11(1) Fryingpan Creek Bridge Project

PDFq-and-a

Physical+Data+WA+NP+MORA+11%281%29+A003.zip

ZIP

WA NP MORA 11(1) Fryingpan Creek Bridge Project Description

PDF4 pagesproject-description

Bid Summary WA NP MORA 11 Fryingpan Creek Bridge

PDFbid-summary

Fryingpan Creek Bridge Project Q&A June 2026

PDFq-and-a

QA for WA NP MORA 11(1) Fryingpan Creek Bridge Project

PDFq-and-a

Bid Tabulation Report for Fryingpan Creek Bridge Project WA NP MORA 11(1)

PDFbid-tabulation-report

WA NP MORA 11(1) Fryingpan Creek Bridge Plans

PDFplans

Solicitation 69056726B000001 Fryingpan Creek Bridge Preliminary Plans Notice

PDF2 pagespresolicitation

Physical+Data+WA+NP+MORA+11%281%29.zip

ZIP

QA Document for WA NP MORA 11(1) Fryingpan Creek Bridge Project

PDFq-and-a

Fryingpan Creek Bridge Project Q&A June 2026

PDFq-and-a

QA for Fryingpan Creek Bridge Project WA NP MORA 11(1)

PDFq-and-a

QA2 Fryingpan Creek Bridge Project 06-11-2026

PDFq-and-a

QA 06-24-2026 Fryingpan Creek Bridge Project

PDFq-and-a

QA for Fryingpan Creek Bridge Project Advertisement Schedule

PDF1 pageq-and-a

QA for WA NP MORA 11(1) Fryingpan Creek Bridge Project

PDFq-and-a

IFB 69056726B000001 Fryingpan Creek Bridge

PDFifb

mora11-1_Plans_Pre-Ad.pdf

PDF98 pages

QA Document for WA NP MORA 11(1) Fryingpan Creek Bridge Project

PDFq-and-a

Amendment A004 to Solicitation 69056726B000001 for Fryingpan Creek Bridge

PDFamendment

WA NP MORA 11(1) Fryingpan Creek Bridge Bid Tabulation Report

PDFbid-tabulation-report

Amendment A002 to Solicitation 69056726B000001 for Fryingpan Creek Bridge

PDFamendment

Amendment A001 to Solicitation 69056726B000001 - Wage Decision Update

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

17 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Amendment 6

Contract was updated

Amendment 7

Contract was updated

Amendment 8

Contract was updated

Amendment 9

Contract was updated

Amendment 10

Contract was updated

Amendment 11

Contract was updated

Amendment 12

Contract was updated

Amendment 13

Contract was updated

Amendment 14

Contract was updated

Amendment 15

Contract was updated

Response Deadline

Deadline has passed

Amendment 16

Contract was updated

Amendment 17

Contract was updated

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 690567 Western Federal Lands Division
Contacts1 person available
OfficeVANCOUVER, WA, 98661, USA
Organization / Agency
Department Of Transportation → 690567 Western Federal Lands Division
View Agency Profile
Office AddressVANCOUVER, WA, 98661, USA
Contacts

Full Description

Show more

Project: WA NP MORA 11(1), Fryingpan Creek Bridge


See attachments for full requirements.



QA_05-26-2026 Posted 05/26/2026


Amendment A001 Posted 05/27/2026


QA_05-29-2026 Posted 05/29/2026


Amendment A002 Posted 06/01/2026


QA_06-03-2026 Posted 06/03/2026


QA_06-08-2026 Posted 06/08/2026


Amendment A003 Posted 06/09/2026


Physical Data updated and uploaded 06/09/2026


QA_06-11-2026 Posted 06/11/2026


QA2_06-11-2026 Posted 06/11/2026


QA_06-12-2026 Posted 06/12/2026


QA_06-16-2026 Posted 06/16/2026


QA_06-18-2026 Posted 06/18/2026


QA_06-22-2026 Posted 06/22/2026


Amendment A004 Posted  06/22/2026


QA_06-24-2026 Posted 06/25/2026


Bid Opening Link Updated 06/25/2026


QA_06-25-2026 Posted 06/25/2026


Amendment A005 Posted 06/26/2026


Bid Summary Posted 07/01/2026


Bid Tabulation Posted 07/02/2026


Updated Bid Tabulation Posted 07/14/2026

More opportunities from Department Of Transportation → 690567 Western Federal Lands Division

Same awarding agency

NAICS: 541990
New
Federal
Post-Construction Environmental Compliance Monitoring Services in support of MT FLAP BOR 2980(1) Sun River Bridge Replacement
Solicitation # 69056726Q000038
Solicitation 69056726Q000038 is a request for quotations for post-construction environmental compliance monitoring services to support the MT FLAP BOR 2980(1) Sun River Bridge Replacement project in Augusta, Montana. This acquisition is a total small business set-aside issued by the Federal Highway Administration's Western Federal Lands Division. The scope of work involves executing eight specific tasks to ensure environmental compliance, including the removal of temporary controls once final stabilization of 70 percent revegetation is achieved, all in accordance with the project's Stormwater Pollution Prevention Plan. The anticipated period of performance runs from the date of award through November 30, 2027, with monthly inspections expected from November 2026 through the end of the term. The contract will be awarded using the Lowest Priced Technically Acceptable process, evaluating offers based on price, technical capability, and relevant past performance. Technical evaluation focuses on compliance with solicitation requirements and the qualifications of key personnel. Offerors must submit a price schedule, key personnel resumes, and work experience documentation. Administrative requirements include electronic invoicing via the Delphi iSupplier portal and adherence to the Service Contract Act wage determinations. Final deliverables are subject to a structured review process by the FHWA, with specific timelines for draft comments and final acceptance by the Technical Point of Contact.
All Other Professional, Scientific, and Technical Services

POSTED

4 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS