This Solicitation opportunity from Wisconsin was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
WA0456 MKE Baggage Handling System Controls Upgrades and Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract encompasses the comprehensive upgrade and replacement of the inbound and outbound Baggage Handling System (BHS) controls at General Mitchell International Airport in Milwaukee, Wisconsin, along with the replacement of four outbound baggage carousels and other ancillary improvements. Work is governed by AIA A201–2017 standard contract documents, not federal acquisition regulations, and includes full responsibility for installation, integration, testing, and certification of all systems to meet TSA Planning Guidelines and Design Standards Version 8.0, as well as applicable electrical, construction, and manufacturer specifications. The scope includes all labor, materials, equipment, and services necessary to complete the project, whether explicitly detailed or reasonably inferable, with exclusions limited to items clearly marked as “by others” or “existing.” All work must comply with stringent airport operational constraints, including mandatory nighttime scheduling between 9:00 PM and 4:00 AM to avoid disrupting airport functions, with all equipment confined to designated areas and no rubber-tired equipment permitted on unpaved surfaces. Environmental protection, debris removal, and damage repair to airport infrastructure are the Contractor’s sole responsibility. Performance must adhere to a fixed-price structure with a base bid estimated at $250,000, comprising a $200,000 miscellaneous allowance and a $50,000 porter allowance, with unpriced alternates available for replacing additional carousels and optimizing alarm queuing and diverters. The contract requires electronic submission through Bid Express by June 3, 2026, at 2:00 PM, with no acceptance of paper, fax, or telephonic bids. Award will be determined through a trade-off process evaluating technical merit, cost impact, and schedule implications, though formal evaluation weights are unspecified. Payment is processed using AIA G702 and G703 forms, submitted in paper, notarized format, with no electronic invoicing system utilized. The Contractor must provide detailed as-built drawings, operation and maintenance manuals, certified test reports, and compliance documentation, including proof of EEO compliance, affirmative action plans if over 50 employees, and subcontractor EEO clauses. All personnel must adhere to FAA Advisory Circular 150/5370-2, and equipment must be permanently labeled with stenciled identifiers based on location. Liquidated damages of $1,000 per day apply for delays beyond the Substantial Completion deadline, with a 30-day window allowed
General Info
Agency
NAICS
Place of Performance
WI, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
A Mandatory Pre-Bid Meeting will be held at 10:00am on May 13th in the Sijan and Lovell Conference Rooms at the General Mitchell International Airport. 5300 S Howell Avenue, Milwaukee, Wisconsin.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
