This Solicitation opportunity from California was posted on March 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Walnut Street Corridor Signal Improvement Project entails upgrading signal equipment along Walnut Street between Fair Oaks Avenue and Greenwood Avenue in Pasadena, California. This corridor is a critical east-west arterial route serving as a vital link between major north-south corridors such as Orange Grove Boulevard and Fair Oaks Avenue and providing access to key I-210 freeway ramps. Given its strategic importance, the project aims to enhance traffic signal operations to improve safety and flow, especially since Walnut Street also functions as a primary access route for special events at the Rose Bowl stadium. The solicitation was issued by the Public Works Department under the Engineering division of the City of Pasadena, with a response deadline set for April 16, 2026.
The contract, structured as a federally funded labor and materials agreement, establishes clear expectations for contractor obligations, including compliance with California prevailing wage laws and equal employment opportunity provisions. It incorporates detailed terms covering contract duration, payment conditions, and procedures for handling change orders, ensuring flexibility while maintaining control. Bonds are required to secure performance, and the contractor is designated as an independent entity responsible for meeting regulatory standards. The administration of the project will be overseen by designated City personnel, with Nicholas Park serving as the primary point of contact and Antonio Watson as project manager, facilitating communication and ensuring alignment with the City’s engineering and public works objectives.
General Info
Upgrade traffic signals on Walnut Street, Pasadena; federally funded, compliance with laws required.
HighAI Summary for 2026-IFB-CIV-0122 Walnut Street Corridor Signal Improvement Project: This document is the Invitation for Bids (IFB) for the Walnut Street Corridor Signal Improvement Project in Pasadena, California, released on March 24, 2026. It outlines the project scope including ITS asset design and implementation, fiber optic connectivity, traffic signal hardware upgrades, video surveillance, and V2X communication capabilities. The IFB details bid submission instructions, deadlines, a non-mandatory pre-bid meeting on April 2, 2026, and question submission deadline of April 7, 2026. It also includes contractor licensing requirements per California Public Contract Code and labor compliance provisions. Bids are to be submitted electronically by April 16, 2026, via the City's eProcurement Portal.
PDF
PDF, High priority: read this firststandard-plan
HighAI Summary for City of Pasadena Standard Plans S-002 and S-003: This document contains standard plans from the City of Pasadena Public Works & Transportation Department, including substructure legends, metric conversion factors, and construction details. It includes drawings and notes for sewer, power conduit, water, cable, telephone conduit, natural gas, fiber optic, street light conduit, traffic signal conduit, and storm drain lines. The document is revised and approved by city engineers and includes detailed unit conversions and construction specifications. It serves as a technical reference for public works construction projects, providing essential standards and guidelines for contractors and engineers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Exhibit A - Network Communication Hardware Specifications: This document, titled Exhibit A, provides detailed functional specifications for network communication hardware used in traffic signal and fiber optics hub cabinets. It covers two main parts: an Ethernet-based edge switch (MOXA EDS-G512E-4GSFP-T) with up to 12 ports and various SFP modules, and an Ethernet-based hub type switch (RUGGEDCOM RX5000) with high port density including copper and optical ports. Key features include cyber security requirements with the latest firmware, compliance with IEEE and IEC environmental standards, management tools with the latest OS and industry standards, and universal power supply options. The document ensures the hardware meets industrial performance thresholds and includes specific power supply and cable references.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Exhibit B - 19-4-100 CCTV Modified Pole and Foundation Specifications: This document, titled Exhibit B - 19-4-100 CCTV Modified Pole and Foundation, provides detailed specifications for pole dimensions and base plate data for a modified pole type 14-4-100 ES-TF. It includes a table of required pole dimensions such as height, minimum outer diameter at base and top, base plate thickness, size, and thickness. The document contains important notes for contractors regarding verification of field dimensions, galvanization requirements, erection procedures, mounting flange modifications, and references to Caltrans Standard Plans 2018 Edition for fabrication standards. It also includes orientation instructions for junction boxes and general fabrication compliance notes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Exhibit C - Fiber Optic Cable Detailed Specification: This document is Exhibit C, providing detailed specifications for furnishing and installing fiber optic cable for the City of Pasadena's broadband fiber optic Traffic Signal Communication System. It outlines the types of fiber optic cables required, including 96-strand, 12-strand, 24-strand, 48-strand, and 6-strand single mode cables. The specification covers reel requirements, test requirements with Optical Time Domain Reflectometer (OTDR) testing, and detailed fiber optic cable construction parameters such as optical fiber characteristics, buffer requirements, Binderless FastAccess Technology, inner jacket, aramid strength members, outer covering, and fiber identification. Mechanical parameters like tensile strength for installation and operation are also included. The document ensures compliance with manufacturer and City specifications for quality and performance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Exhibit E - LED Signal Modules Detailed Specification: This document, titled Exhibit E, provides detailed specifications for Light Emitting Diode (LED) signal modules used in traffic signal faces of 300-mm (12 inch), 200-mm (8 inch), or arrow sections. It outlines the general requirements for Type 1 and Type 2 LED modules, including installation, construction, materials, and environmental standards. The document specifies power consumption limits, photometric requirements, and physical and mechanical criteria to ensure compatibility with existing traffic signal housings. It also covers lens characteristics, module identification markings, and durability standards such as weatherproofing and UV resistance. The specifications ensure LED modules meet operational and safety standards for traffic signals, including compliance with NEMA and ASTM standards, and provide performance data at 25°C operating temperature.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Exhibit E - MIC inteox 7100i CCTV Camera Technical Specifications: This document provides detailed technical specifications for the MIC inteox 7100i - 2MP OC (BLACK) PTZ surveillance camera with a Bosch license MIC-7602-Z30BR-OC. It highlights the camera's advanced features including AI-based traffic detection, starlight imaging technology for low-light sensitivity, ruggedized design for harsh environments, and high dynamic range imaging. The document also covers the camera's intelligent open platform, edge intelligence, and integration with Bosch's Remote Portal for device management. Additional features include a defroster for cold environments, robust IP68 and IK10 ratings for durability, and a dual-mode illumination accessory. The content is intended to inform procurement and technical evaluation for mission-critical surveillance applications.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Master Labor and Materials Contract - City of Pasadena: This document is a Master Labor and Materials Contract between the City of Pasadena and a contractor. It outlines the contractor's obligations to provide labor, materials, equipment, and services as specified in attached exhibits. The contract includes terms on commencement, duration, compensation limits, and change order procedures. It establishes the contractor as an independent entity responsible for compliance with labor laws, prevailing wage requirements, and the Pasadena Living Wage Ordinance. The contract also addresses ownership of work products and requires bonds and compliance monitoring. The document serves as a binding agreement governing the performance and payment for public work projects under the City's jurisdiction.
PDF
PDF, High priority: read this first16 pages · contract-document
HighAI Summary for PW Contract Federally Funded - City of Pasadena Labor and Materials Contract: This document is a labor and materials contract between the City of Pasadena and a contractor, outlining terms for federally funded work. It includes equal employment opportunity provisions, contractor obligations, contract term and payment limits, change order procedures, and general terms such as independent contractor status and compliance with prevailing wage laws. The contract references attached specifications and bidder proposals, and requires bonds and adherence to labor regulations. The document is intended to govern the performance and administration of the contracted work.
PDF
PDF, High priority: read this firstrequired-forms
HighAI Summary for Required Forms for AAs - City of Pasadena: This document contains required forms for Affirmative Action (AA) compliance for City of Pasadena contracts, dated November 17, 2022. It includes the Vendor Questionnaire (Form AA-1) with an affidavit of equal opportunity employment and non-segregation, a Project Workforce Utilization form (Form AA-2) for labor or services valued at $25,000 or more, and a Current Permanent Workforce Utilization form (Form AA-3). These forms collect company information, workforce demographics, and certifications to ensure adherence to equal opportunity employment practices and reporting requirements for public works projects.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Specification for Vantage Next Camera Video Detection System: This document is a specification for the Vantage Next Camera, a modular video detection system designed to detect vehicles, bicycles, and pedestrians using video images. It details hardware components including up to four cameras, video detection processors, a central control unit, and associated modules. The system software supports detection zone programming without a separate computer and includes pedestrian tracking features. The specification covers hardware interfaces, power requirements, operating temperature ranges, firmware upgrade capabilities, and compliance with FTA Buy America regulations. The document is intended to set minimum requirements for the system's design and operation.
PDF
PDF, High priority: read this firstspecial-provisions
HighAI Summary for Walnut Street Corridor Signal Improvements Project - Part II Special Provisions: This document is Part II Special Provisions for the Walnut Street Corridor Signal Improvements Project. It outlines the scope of work including installation and modification of traffic signals, fiber optic communication, ADA pedestrian ramp improvements, and roadway restriping. It references contract drawings and standard plans from the City of Pasadena, Caltrans 2023, and Public Works Standard Drawings. Specifications conform to Caltrans 2024 Standard Plans and City of Pasadena supplements. The contract duration is 100 working days with provisions for delays, liquidated damages, and extra work markups. It includes scheduling requirements to minimize resident impact, character standards for workers, quality of work expectations, and notification protocols for affected residents and businesses. The document is essential for understanding project-specific contractual and operational requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Walnut Street Smart Corridor Signal Improvement Project - Construction Plans: This document is the construction specifications and plans for the Walnut Street Smart Corridor Signal Improvement Project in Pasadena, California. It includes general notes, abbreviations, construction notes, disposition notes, legends, pole schedules, and detailed civil and electrical design plans. The document references compliance with the Standard Specifications for Public Works Construction and Pasadena supplements. It provides detailed instructions for sidewalk, curb ramp, and traffic signal construction, as well as utility and fiber optic plans. The document is intended to guide contractors in executing the project according to city standards and includes revisions and project engineer details.
PDF
PDF, Low priorityidentity-confirmation
LowAI Summary for Identity Confirmation Form: This document is an Identity Confirmation form used in contracting processes. It requires the contractor to provide their name, business address, and organizational details depending on their business type (individual, partnership, or corporation). For corporations, it asks for the names of key officers and the state of incorporation. It also requests contact information for a local representative. The form must be accompanied by a certificate confirming the identity of the signing bidder or officer, their named position, and their authority to bind the bidder.
PDF
PDF, Low prioritynoncollusion-declaration
LowAI Summary for Noncollusion Declaration for Bid Submission: This document is a Noncollusion Declaration to be executed by the bidder and submitted with the bid. It affirms that the bid is genuine, not collusive or sham, and that the bidder has not engaged in any collusion or conspiracy to fix bid prices or refrain from bidding. The declaration is made under penalty of perjury under the laws of the State of California and includes spaces for date, city, state, signature, printed name, and title of the person executing the declaration on behalf of the bidder.
PDF
PDF, Low priorityrelevant-experience-form
LowAI Summary for Relevant Experience Form for Bid Submission: This document is a Relevant Experience Form intended to be completed and submitted with a bid. It spans five pages, each designed to capture detailed information about projects of similar scope and size to the one being bid on. For each project, the form requests the project name, address/location, start and completion dates, contract descriptions, and contract owner information including name, contact title, address, phone number, and email. The form serves to demonstrate the bidder's experience relevant to the contract opportunity.
The proposed project will provide signal equipment upgrades along the corridor of Walnut Street between Fair Oaks Avenue and Greenwood Avenue. Walnut Street is a major east-west corridor south of the I-210 freeway serving as a connector between the major north-south corridors of Orange Grove Boulevard and Fair Oaks Avenue and the I-210 on-and-off ramps at Lake Avenue, Hill Avenue, Allen Avenue, and Sierra Madre Boulevard. It is also one of the main corridors for ingress and egress to the Rose Bowl and ins used heavily for stadium-related special events.
More opportunities from California → Public Works Department, Engineering
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.