Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Warren County NRCS EWP Erosion Control Project 75(352) - Group 12 (5) Sites

Active
16305096State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Warren County Board of Supervisors is seeking sealed bids for the NRCS EWP Erosion Control Project No. 75(352) Group 12, which involves drainage improvements and bank stabilization across five sites in Warren County. The project must be completed within 90 calendar days from the Notice to Proceed, with liquidated damages set at 500 dollars per day for delays. Bids are due by 10:00 a.m. on September 30, 2026, and can be submitted physically to the Warren County Purchasing Department or electronically via Central Bidding. Qualified bidders must hold a Mississippi State Board of Public Contractors Certificate of Responsibility in a relevant classification, such as highway, municipal works, or excavation. A bid security deposit of 5 percent of the total bid is required, and the winning contractor must provide performance and payment bonds for 100 percent of the contract amount. Non-resident bidders must comply with Mississippi reciprocal preference laws by submitting their home state's treatment of non-resident contractors. Project documentation is available through Neel-Schaffer, Inc. and the Warren County Purchasing Department.

General Info

Warren County seeks bids for erosion control projects due September 30, 2026.

Agency

Mississippi → Neel-Schaffer, Inc.View Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

1100 Cherry Street, Vicksburg, MS, 39183, USA

Set-Aside

NONE

Documents

(3)

FINAL CONTRACT DOCUMENTS_Group 12.pdf

HTML

ADVERTISEMENT FOR BIDS_NRCS Group 12.pdf

HTML

FINAL BID PLANS_GROUP 12_Flattened.pdf

HTML

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMississippi → Neel-Schaffer, Inc.
Contacts1 person available
OfficeVicksburg, MS, 39183, USA
Organization / Agency
Mississippi → Neel-Schaffer, Inc.
View Agency Profile
Office AddressVicksburg, MS, 39183, USA
Contacts

Full Description

Show more
ADVERTISEMENT FOR BIDS - NOTICE TO CONTRACTORS    Notice is hereby given that the Warren County Board of Supervisors will receive sealed bids from qualified bidders for the project identified as the Warren County NRCS EWP Erosion Control Project No. 75(352) – GROUP 12 (5 Sites).  The project includes drainage improvements and bank stabilization at five (5) sites throughout Warren County as indicated in the drawings, specifications, and other contract documents. The above general outline of features of work does not in any way limit the responsibility of the Contractor to perform all work and furnish all parts, labor, equipment, and materials required by the specifications and the drawings referred to therein.   The contract time for the work included in this contract is Ninety (90) Calendar Days.  The Contract will be subject to liquidated damages of five hundred dollars ($500) per calendar day for each day in default after the stipulated completion date.  The contract time will begin on the date specified in the written Notice to Proceed.   Deadline for receiving Bids is 10:00 a.m. local time on September 30, 2026. Bids will be received at the Warren County Purchasing Department, 913 Jackson Street, Vicksburg, MS 39183. Bidders are cautioned that the Purchasing Department does not receive the daily U.S. Mail on or before 10:00 a.m. Bids will be time-stamped upon receipt according to Purchasing Department’s time clock. Bids received after the stated deadline will not be considered. All bids properly received will be publicly opened and read aloud.   Electronic bids can be submitted at www.centralbidding.com.  Official bid documents can be downloaded from Central Bidding.  Interested contractors can register as a vendor at www.centralbidding.com and download plans. Electronic bids are due at the same time and date as sealed bids.  For any questions relating to the electronic bidding process, please call Central Bidding at 225-810-4814.   Bidders must be qualified under Mississippi State law and possess a Certificate of Responsibility issued by the Mississippi State Board of Public Contractors in a classification such as (a) Highway, Street and Bridge Construction, (b) Municipal and Public Works Construction, (c) Excavation, Grading & Drainage or another closely related classification.  This Project is expected to exceed $50,000, therefore the Certificate of Responsibility Number shall be written on the outside of the sealed bid envelope.  For electronic bids, the COR information must be submitted as the first page of the PDF attachment with the electronic bid submittal.  For bids less than $50,000, a Certificate of Responsibility number is not required.  Bidder shall note on the outside of the envelope containing the bid that the “bid is less than $50,000, CR No. not required”.   Mississippi has a reciprocal preference law. Mississippi Code 31-3-21 requires that a copy of any non-resident bidder’s current state law pertaining to its treatment of non-resident contractors be submitted at the time the bid is submitted, or that bid shall not be considered further.    Each bidder must deposit with his proposal a Bid Bond or Certified Check in an amount equal to five percent (5%) of the total bid payable to Warren County as bid security.  The successful bidder shall furnish a Performance Bond and a Payment Bond each in the amount of 100% of the contract amount awarded. Bidders shall also submit a current financial statement if requested by Warren County. Attorneys-in-fact who sign Bid Bonds or Payment Bonds and Performance Bonds must file with each bond a certified and effective dated copy of their power of attorney.   Neel-Schaffer, Inc. is the Engineer for this project. Plans, Specifications, and Contract Documents are on file and open to public inspection at the local Neel-Schaffer, Inc. office and at the Warren County Purchasing Department, 913 Jackson Street, Vicksburg, MS 39183. Contractors may request bid documents by visiting www.centralbidding.com and following the site instructions for registration and download. Bid Documents may also be picked up at no charge at the Neel-Schaffer office located at 1100 Cherry Street, Vicksburg, MS 39183. Questions may be addressed to Brian Robbins, Project Manager via brian.robbins@neel-schaffer.com.   The Warren County Board of Supervisors reserves the right to determine responsible bidders, responsive bids, the lowest and best bid, reject any and all bids, award to the bidder believed most advantageous to Warren County, and to waive any informalities in the bids and bidding process. Published pursuant to Board Order dated the 3rd day of August 2026.   The Warren County Board of Supervisors By: Victoria Bell, Purchasing Agent PUBLICATION DATES:    August 30, 2026 September 6, 2026

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and pipe installation, as well as structural and finishing tasks including masonry, welding, roofing, electrical work, and interior finishes. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a response deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) and administered by the EPA, making it subject to the American Iron and Steel (AIS) Provisions, Davis-Bacon Related Acts, and DBE Program requirements. Qualified bidders must possess a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, with bond premiums reimbursed by Kiewit. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and other small business enterprises, requiring evidence of certification from recognized agencies such as the US EPA, SBA, or CA DOT.
Kiewit Infrastructure West Co.

POSTED

about 13 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. Located in Haleiwa, Oahu, Hawaii, the scope of work involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal south of Oahu, vegetation clearance, and repairs to the revetted mole, including stone rework and filling voids. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for small businesses, including SDB, WOSB, HUBZone, VOSB, and SDVOSB concerns, with a specific price evaluation preference for HUBZone small businesses. Bids must be submitted as sealed physical envelopes by September 30, 2026, as electronic submissions are not permitted. Key requirements for a responsive bid include active SAM registration, a bid guarantee, and the submission of SF 1442. The contractor must provide key personnel, including a Project Manager and Site Safety and Health Officer, and adhere to Davis-Bacon Act wage requirements. Acceptance of the dredging work is based on pre- and post-dredge multi-beam hydrographic surveys conducted by a third-party qualified surveyor. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 13 hours ago

DEADLINE

in 23 days
View Details