Primary Clarifier #1 Rehabilitation Project

Active
FY27-Const. ITB-009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Primary Clarifier #1 Rehabilitation Project, solicitation number FY27-Const. ITB-009, is issued by the Wastewater Division of New Mexico in Santa Fe. The project addresses the failure of primary clarifiers installed in 1998, which have suffered extensive carbon steel corrosion and mechanical failure. The scope of work includes the removal and replacement of mechanical equipment, the installation of a new electrical control panel, and necessary concrete and grout repairs to restore operational functionality and extend the life of the units. Responses for this solicitation are due by September 30, 2026, at 8:00 PM. The project is managed by the Wastewater Division, with Paul Fred Heerbrandt serving as the Engineer Supervisor and Kathy Sanchez as the Procurement Officer. All work will be performed within the state of New Mexico.

General Info

New Mexico Wastewater Division project to rehabilitate Primary Clarifier #1 by September 30, 2026.

Agency

New Mexico → Wastewater DivisionView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

NM, USA

Set-Aside

NONE

Documents

(10)

Type H Heavy Engineering Wage Rates, Effective Jan 1 2026

PDF5 pageswage-determination

Paseo Real WWTP Plant Visit Report M-101663-01/18361A

PDF18 pagesother

DWS Public Works Project Requirements and Wage Rates

PDF2 pageswage-determination

Proposal 2691245.F_Rev0 – Paseo Real WWTP, Santa Fe NM

PDF14 pagesproposal

Type H Heavy Engineering Wage Rates – Effective January 1, 2026

PDF5 pageswage-determination

NMDWS Wage Decision SF-26-2717-H

DOCX3 pageswage-determination

FY27-Const. ITB009 Primary Clarifier #1 Rehabilitation Project

PDF27 pagesitb

SF-26-2717-H Wage Decision and Minimum Wage Rates Schedule

DOCX3 pageswage-determination

Clarifier Dimensions / Sector Parameter Table

PDFspecifications

Public Works Project Requirements and Wage Rates

PDF2 pageswage-determination

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew Mexico → Wastewater Division
Contacts2 people available
OfficeSanta Fe, NM, 87501, USA
Organization / Agency
New Mexico → Wastewater Division
View Agency Profile
Office AddressSanta Fe, NM, 87501, USA
Contacts
Paul 'Fred' HeerbrandtEngineer Supervisor
Kathy SanchezProcurement Officer

Interested Companies (11)

Show more
IES Southwest
Phoenix, AZ
AUI
Albuquerque, NM
TLC
Albuquerque, NM

See All 11 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The primary clarifiers were installed in 1998 and have reached the end of their useful life. The coating on the metal equipment has failed resulting is extensive corrosion of the carbon steel. The mechanical system is beyond repair, so this equipment must be removed and replaced. This project proposes to replace the mechanical equipment, replacement of the electrical control panel, and concrete/grout repairs, to restore proper operation and extend the units life as per the attached plans and specifications.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 (NORSD) WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; as well as electrical work and the supply of various piping materials. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid deadline of September 17, 2026, at 10:00 a.m. The project is partially funded by the Water Infrastructure Finance and Innovation Act (WIFIA) administered by the EPA, making it subject to the American Iron and Steel (AIS) Provisions, the Davis-Bacon Related Acts, and DBE Program requirements. Qualified bidders must hold a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors may be required to provide bonding for 100% of their contract value, with Kiewit agreeing to reimburse the bond premiums. The solicitation specifically encourages participation from certified DBE, MBE, WBE, SBE, and other disadvantaged or small business enterprises, requiring evidence of certification from recognized bodies such as the US EPA, SBA, or CA DOT.
Kiewit Infrastructure West Co.

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The scope of work includes mobilization and demobilization, vegetation clearance, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of revetted moles through stone rework and void filling. The project is estimated to be valued between 1 million and 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for small businesses, including SDB, WOSB, HUBZone, and Veteran-owned concerns, with a specific 10 percent price evaluation preference for HUBZone small businesses. Bidders must provide performance and payment bonds and adhere to Davis-Bacon Act wage requirements. Technical acceptance is based on multi-beam hydrographic survey data and strict stone quality standards. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Bids must be submitted in sealed envelopes to the Fort Shafter office, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

1 day ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
SLED
Thompson River Dredging and Remediation
Solicitation # ITB2026-187PW
The City of Palm Beach Gardens, through its Public Works department, has issued solicitation ITB2026-187PW for the Thompson River Dredging and Remediation project. This initiative aims to address critical stormwater management needs by dredging accumulated sediment to restore hydraulic capacity and proper cross sections, regrading riverbanks, and installing sod revetment mat systems. The project is designed to mitigate bank erosion and stabilize long-term stormwater infrastructure, building upon previous restoration efforts and addressing vulnerabilities identified in the 2025 Comprehensive Vulnerability Assessment. The scope includes erosion control, environmental protection measures, and full site restoration, with the City anticipating one additional future capital project to finalize the river's long-term restoration. This project is funded by a State of Florida grant and requires strict adherence to all grant requirements, environmental regulations, and permitting conditions. Bids must be submitted via the OpenGov e-procurement platform by September 25, 2026, at 3:00 PM local time. The contract will be awarded to the single lowest-priced bidder who meets all eligibility, licensing, and certification requirements. Selected contractors must provide payment and performance bonds and comply with fixed pricing terms. Technical specifications for the work are supported by survey drawings covering the Thompson River Canal from Interstate I-95 south to Holly Drive.
Public Works

POSTED

2 days ago

DEADLINE

in 17 days
View Details

More opportunities from New Mexico → Wastewater Division

Same awarding agency

NAICS: 237990
SLED
Dissolved Air Floatation Thickener Unit 1 AND 2 Upgrades
Solicitation # FY27-Const. ITB-008
The City of Santa Fe Wastewater Division is soliciting bids under solicitation FY27-Const. ITB-008 for the upgrade of Dissolved Air Floatation Thickener Units 1 and 2 at the Paseo Real Water Reclamation Facility. The scope of work involves modifying the air water saturation system, installing new air-entraining pumps, constructing a structural stand for the break tank, and performing SCADA and control integration for all new equipment. The project also includes necessary demolition, abandonment, and replacement activities across multiple disciplines as detailed in the project manual and technical plan sets. Bids must be submitted electronically via OpenGov by September 29, 2026. The contract will be awarded to the responsive and responsible bidder providing the lowest base bid. Key requirements for bidders include providing a valid New Mexico Resident Certificate, a bid security of 5 percent of the total item prices, and maintaining a valid license from the Construction Industries Division. For contracts exceeding 25,000 dollars, the successful bidder must provide 100 percent performance and labor material payment bonds. The project is subject to strict labor and safety standards, including compliance with the New Mexico Public Works Minimum Wage Act and the use of Wage Scale H for heavy engineering trades. Contractors must ensure all subcontractors are registered with the Public Works and Apprenticeship Application website and submit required wage documentation. On-site superintendents must hold at least an OSHA 10 certification. Final inspection and acceptance will occur at the destination, with the City of Santa Fe determining if the work meets the specified quality and workmanship standards.
Other Heavy and Civil Engineering Construction

POSTED

25 days ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS