Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on August 16, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Waster Water Treatment Plant Operator

Closed
21820-23-0074International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. This design-bid-build project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new process systems, administrative and support buildings, and utility connections. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. The project also requires a 12-month operational support period following construction. The estimated magnitude of construction exceeds 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a revised assumed Notice to Proceed date of April 1, 2027. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating proposals based on technical experience, technical approach, management approach, key personnel experience, and price. Key personnel requirements include a Project Manager, Construction Superintendent, Quality Control Manager, Safety Specialist, and Historic Preservation Treatment Specialist. Contractors must provide performance and payment bonds and adhere to union prevailing wage rates. Technical requirements emphasize strict cybersecurity hygiene for SCADA/MES equipment, granting the government full access to software source code, and compliance with ADA standards. Invoicing is managed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a draft review by the Contracting Officer's Representative seven days prior to final submission.
Dsc Contracting Services Division

POSTED

about 17 hours ago

DEADLINE

in 21 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

8 days ago

DEADLINE

in 2 months
NAICS: 221320
Federal
Waste Water Treatment Plant Services
Solicitation # FA448627Q0002
Solicitation FA448627Q0002 is a Request for Quotation issued by the Department of the Air Force for Waste Water Treatment Plant Services at Lajes Field in Praia da Vitoria, Azores, Portugal. The contractor will be responsible for the operation and maintenance of a waste water treatment plant with a capacity of 800,000 gallons per day, as well as the associated lift station, oil-water separator, and grease traps. Key requirements include providing a Lead Operator with a Level II or higher WPI Certification and at least three years of experience, implementing a 52-week preventive maintenance plan, and ensuring compliance with ISO/IEC 17025 laboratory standards and Portuguese decree law 183/2009 for waste landfills. The scope also encompasses corrosion control, painting, and the management of hazardous materials. The government intends to award a single Firm-Fixed-Price contract with a total duration not to exceed 66 months, consisting of a base period and four option periods. This is an unrestricted acquisition, and proposals must be submitted electronically by November 23, 2026, at 14:00 Azores Time. Offers are evaluated through a three-step sequential process: an administrative compliance review, a technical acceptability evaluation based on experience, approach, and a quality control plan, and finally a price evaluation in Euro currency. Award is contingent upon the availability of funds. Payments will be processed electronically via the Wide Area WorkFlow system.
FA4486 765 Abs Conf

POSTED

16 days ago

DEADLINE

in 26 days

AI Contract Overview

Show more

Correctional Service Canada is seeking a provincially qualified contractor to operate, service, and maintain the Level III Waste Water Treatment Plant at the William Head Federal Correctional Institution in Victoria, British Columbia. The selected contractor is responsible for controlling water flow, monitoring equipment, performing routine maintenance, and ensuring compliance with federal and provincial regulations, including the Canadian Environmental Protection Act and the Fisheries Act. Key requirements include maintaining daily logbooks, reporting system status weekly, and responding to emergencies immediately. The contract is valued at approximately 195,195.00 CAD for an initial six-month term from August 23, 2023, to February 22, 2024, with options for two additional six-month extensions. Qualified candidates must hold a Level III or higher Wastewater Treatment Plant Operator certification and possess at least two years of relevant experience within the last five years. Additionally, the contractor must be available on-site for 20 hours per week and capable of responding to after-hours emergencies within two hours. Aureus Solutions Inc. has been pre-identified as the intended supplier due to the remote location and specific response time requirements.

General Info

Aureus Solutions Inc. will operate William Head's wastewater plant for 195,195 CAD.

Place of Performance

*British Columbia, CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Correctional Service of Canada
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Penny AndersonPoint of Contact

Full Description

Show more
An advanced contract award notice (ACAN) is a public notice indicating to the supplier community that a department or agency intends to award a contract for goods, services or construction to a pre-identified supplier, thereby allowing other suppliers to signal their interest in bidding, by submitting a statement of capabilities. If no supplier submits a statement of capabilities that meets the requirements set out in the ACAN, on or before the closing date and time stated in the ACAN, the contracting officer may then proceed with the award to the pre-identified supplier. 1. Definition of the requirement: The Correctional Service Canada (CSC) requires a provincially qualified Contractor Operator to service, maintain and operate an on site Level III Waste Water Treatment Plant (WWTP) located at the William Head Federal Correctional Institution (WHI) in Victoria. The work will involve the following: 1.1 Objectives: Provide all necessary ongoing operational services and maintenance to the on site Level III WHI WWTP in a state of operating efficiency, reliability and safety. The contractor must provide regular frequency services and maintenance. 1.2 Tasks: The Contractor, together with the site authority, must operate and maintain the WHI WWTP in accordance with CSC’s Internal Services Directive 318-6 - Management of Waste Water and Waste Water Treatment Systems (Correctional Service Canada Internal Services Directive will be made available for review upon request). The Contractor’s responsibilities must include but not be limited to: a) The Contractor must control the flow and processing of water/wastewater, residuals, and finished water/effluent; b) The Contractor must monitor gauges, meters, and control panels while observing variations in operating conditions; c) The Contractor must Interrupt test results to determine processing requirements; d) The Contractor must operate valves and gates either manually or by remote control; e) The Contractor must start and stop pumps and engines to control and adjust flow and treatment processes; f) The Contractor must performing routine maintenance functions and custodial duties for the plant; g) The Contractor must make operating decisions in the absence of supervisory personnel; h) The Contractor must follow all standard operating procedures (SOP) for the WHI WWTP; i) The Contactor must report the status of the continuous system plant to the site authority once per week; j) The Contractor must report all emergencies or non-compliance to the site authority immediately; k) The Contractor must conduct sampling, testing and monitoring for process control and compliance and record and report results where and when as per the plant SOP; l) The Contractor must maintain all logbooks for reporting such as flow measurements, operations, equipment calibrations, analytical reports, operational performance, chain of custody forms, sludge management etc; m) The Contractor must coordinate the submission of samples to accredited laboratories that require analyses that cannot be completed on site. Such samples will include influent and final effluent; n) The Contractor must familiarize themselves with the Institution’s WWTP emergency contingency procedures to address a failure of the treatment system; o) The Contractor must respond to all alarms in timely manner. 1.3 Expected results: To provide all necessary ongoing operational services and maintenance to the on site Level III William Head Waste Water Treatment Plant (WWTP) in a state of operating efficiency, reliability and safety. The contractor must provide regular frequency services and maintenance to operate and maintain the WWTP in accordance with the follow acts, regulations and policies: • The Canadian Environmental Protection Act 1999 (CEPA); • The Fisheries Act (R.S.C.,1985, c.F-14); • The Waste Water Systems Effluent Regulations (SOR/2012-139); • The BC Water and Waste Water Association (BCWWA) policies; • The Code of Ethics and Standards of Practice of the Environmental Operators Certification Program of B.C. and Yukon (EOCP); • All other relevant municipal, provincial and federal bylaws, regulations and legislation applicable to the work. 1.4 Performance standards: • The contractor must provide services to support CSC’s Internal Services Directive 318-6 - Management of Wastewater and Wastewater Treatment Systems. • The contractor must maintain daily logbooks and update spreadsheets for distribution to project authority. • The contractor must attend regularly scheduled meetings to provide update on progress and performance of the sewage treatment system and any operational deficiencies. 1.5 Deliverables: 1.5.1 The Contractor operator must carry out in a careful and competent manner and to the satisfaction of the departmental representative, the work set out under the work description herein; 1.5.2 The Contractor operator must comply with and perform all work in accordance with the Canadian Environmental Protection Act 1999 (CEPA), the Fisheries Act (R.S.C.,1985, c.F-14), the Waste Water Systems Effluent Regulations (SOR/2012-139), BC Water and Waste Water Association (BCWWA) policies, the Code of Ethics and Standards of Practice of the Environmental Operators Certification Program of B.C. and Yukon (EOCP) and all other relevant municipal, provincial and federal bylaws, regulations and legislation applicable to the work; 1.5.3 The Contractor operator in conjunction with the site authority must also perform all operational services and regular frequency maintenance procedures in accordance with the Correctional Service of Canada’s Internal Services Directive 318-6 - Management of Waste Water and Waste Water Treatment Systems; 1.5.4 The Contractor operator must hold all certifications required for the performance of the work throughout the entire length of the contract term. 1.5.5 Paper consumption: a. Should printed material be required, double sided printing in black and white format is the default unless otherwise specified by the Project Authority. b. The Contractor must ensure printed material is on paper with a minimum recycled content of 30% and/or certified as originating from a sustainably managed forest. c. The Contractor must recycle unneeded printed documents (in accordance with Security Requirements). 1.6 Constraints: 1.6.1 Location of work: a. The Contractor must perform the work at: William Head Institution, 6000 William Head Rd. Victoria BC, V9C0B5 b. Travel: No travel is anticipated for performance of the work under this contract. 1.6.2 Language of Work: The contractor must perform all work in English 1.6.3 Security Requirements: There are no security requirements associated to this contract. 2. Criteria for assessment of the statement of capabilities (minimum essential requirements): Experience: The Contractor must have Minimum of two (2) years experience obtained, within the past five (5) years prior to the ACAN closing date, which consisted of operation and maintenance of a Class 3 or higher wastewater treatment plant. The contractor must be able to be on site twenty (20) hours a week and be available for after hours emergency intervention within two (2) hours of a call. Professional designation, accreditation and/or certification: Contractor must be in possession and provide a current and valid certification as a Level III or higher Wastewater Treatment Plant Operator. 3. Applicability of the trade agreement(s) to the procurement This procurement is subject to the following trade agreement(s): Canada Chile Free Trade Agreement (CCFTA); Canadian Free Trade Agreement (CFTA); Canada Korea Free Trade Agreement (CKFTA); The procedural requirements of the other international trade agreements will be fulfilled following compliance to the procedural requirements of CFTA, CCFTA, CKFTA and/or the CETA. 4. Set-aside under the Procurement Strategy for Indigenous Business This procurement is not subject to any set-asides for Indigenous Suppliers. 5. Comprehensive Land Claims Agreement(s) This procurement is not subject to a Comprehensive Land Claims Agreement. 6. Justification for the Pre-Identified Supplier The Project Authority through experience has not been able to identify any other suppliers who can run the day-to-day operations required for the Level III William Head Waste Water Treatment Plant (WWTP). In addition, no other supplier has been identified that would be able to carry out the work due to the required emergency response time (2 hours). CSC has had difficulties locating other suppliers do the remote location of William Head Institution. The pre-identified supplier meets all of the minimum essential requirements described in this ACAN. 7. Government Contracts Regulations Exception(s) The following exception to the Government Contracts Regulations is invoked for this procurement under subsection (a) only one person is capable of performing the contract. 8. Exclusions and/or Limited Tendering Reasons The following exclusion(s) and/or limited tendering reasons are invoked under the section of the trade agreement(s) specified: Canada Chile Free Trade Agreement (CCFTA) Article Kbis-09: a. in the absence of tenders in response to an open tendering procedure, or where tenders submitted have resulted from collusion under domestic law, or do not conform to the essential requirements in the tender documentation provided in a prior invitation to tender, including any conditions for participation, on condition that the requirements of the initial procurement are not substantially modified in the contract as awarded. Canadian Free Trade Agreement (CFTA), Article 513 (a) if: (i) no tenders were submitted or no suppliers requested participation; (ii) no tenders that conform to the essential requirements of the tender documentation were submitted; (iii) no suppliers satisfied the conditions for participation; or (iv) the submitted tenders were collusive, provided that the requirements of the tender documentation are not substantially modified. Canada Korea Free Trade Agreement (CKFTA) - ArticleXIII a. where: i. no tenders were submitted or no suppliers requested participation; ii. no tenders that conform to the essential requirements of the tender documentation were submitted; iii. no suppliers satisfied the conditions for participation; or iv. the tenders submitted have been collusive, provided that the requirements of the tender documentation are not substantially modified. 9. Ownership of Intellectual Property There are no intellectual property terms in the contract. 10. Period of the proposed contract or delivery date The proposed contract is for a period of 6 months, from August 23, 2023 to February 22 2024, with an option to extend the contract for 2 additional 6 - month periods. 11. Cost estimate of the proposed contract The estimated value of the contract, including option(s), is $195,195.00 (GST/HST extra). 12. Name and address of the pre-identified supplier Name: Aureus Solutions Inc. Address: 120 Clarence St, Suite 226, Kingston, ON K7L 1X0 13. Suppliers' right to submit a statement of capabilities Suppliers who consider themselves fully qualified and available to provide the goods, services or construction services described in the ACAN, may submit a statement of capabilities in writing to the contact person identified in this notice on or before the closing date and time of this notice. The statement of capabilities must clearly demonstrate how the supplier meets the advertised requirements. 14. Closing date and time for a submission of a statement of capabilities The closing date and time for accepting statements of capabilities is August 16, 2023 at 2:00 PM PST. 15. Inquiries and submission of statements of capabilities Inquiries and statement of capabilities are to be directed to: Penny Anderson – Procurement & Contracting Specialist 33991 Gladys Avenue, PO Box 4500, Abbotsford BC Canada V2S2E8 Telephone: +1 (555) 000-0000 Facsimile: +1 (555) 000-0000 E-mail: contact@example.gov

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS