Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Georgia was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Main and Service Line Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various SBA-certified small business categories, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The primary point of contact for this opportunity is John Connelly. The scope of work involves comprehensive sanitary sewer improvements utilizing both open cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches in diameter, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. General project requirements encompass site preparation, clearing and grubbing of wooded areas, seeding, and fine grading. The contractor must also implement and maintain a Stormwater Pollution Prevention Plan (SWPPP) and provide geotechnical instrumentation and monitoring. Due to the nature of the site, specific requirements for railroad insurance are mandatory. The project involves significant excavation work, including extra depth excavation exceeding 10 feet.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project is a comprehensive infrastructure initiative located in Chino, California. Managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, the scope of work requires all materials, labor, equipment, and transportation necessary to install, commission, and deliver a fully functional system. The primary work categories include the Butterfield Dual Force Main and the Mountain Avenue, RP-2, and Butterfield Lift Stations. Key technical deliverables involve water and sewer line structures, AC paving, jack and bore operations, cold planing, trucking, traffic control, demolition, and the installation of pipes and fittings. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. The response deadline for bids is November 19, 2026, at 2:00 PM. Primary points of contact for the project are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the provided bid documents and the specifications outlined by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 6 days
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, located in California for the City of San Diego. This CASRF and EPA funded project involves a wide range of civil and infrastructure work, including water main relocations, pipe supply, electrical work, asphalt paving, aggregate supply, and site preparation such as clearing, grubbing, and street sweeping. Specialized services required include surveying, QC testing, biological services, and landscaping. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Subcontractors and suppliers must possess valid California contractor licenses and be registered with the California Department of Industrial Relations per Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance standards. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with bond premium reimbursement available up to 3 percent. Bids must be submitted via email or fax to Veronica Garcia, and all quotes must remain valid for 120 days from the submission deadline.
Flatiron Dragados Constructors, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This subcontract for the Hall County Board of Commissioners involves the installation of a fully operational water distribution system at River Forks Park in Georgia. The scope of work includes installing approximately 14,000 linear feet of PVC water mains and service lines in sizes of 4, 1-1/2, and 3/4 inches, along with the necessary valves, shutoffs, tracer tape, and wiring. Qualified candidates must hold professional utility installation licenses for Hall County and provide a Certificate of Insurance naming Hall County as an additional insured. The response deadline for this opportunity is September 10, 2026.

General Info

Water distribution system installation at River Forks Park, Georgia. Deadline September 10, 2026.

Documents

This scope was carved out of 47-012.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

New Water Lines at River Forks Park & Campground

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Hall County Board of Commissioners
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs new PVC water supply lines for prime contractors on Hall County, Georgia projects at River Forks Park. Installs approximately 14,000 linear feet of 4", 1-1/2", and 3/4" PVC water mains and service lines, including valves, shutoffs, tracer tape, and wire. Requires professional utility installation licenses for Hall County and a COI listing Hall County as additional insured. Delivers a fully operational water distribution system.

More opportunities from Georgia → Hall County Board of Commissioners

Same awarding agency

NAICS: 541330
New
SLED
47-020 RFQP Hall County Master Transportation Plan
Solicitation # 47-020
Hall County, Georgia, is seeking qualified contractors to provide transportation planning and engineering services for the Gainesville-Hall Metropolitan Planning Organization to develop the Hall County Master Transportation Plan. The scope of work involves analyzing existing planned projects from unincorporated Hall County, GHMPO, and GDOT, while incorporating data from various regional plans, including the Comprehensive Plan Update, SPLOST project lists, and the 2055 GHMPO Metropolitan Transportation Plan. Key activities include conducting congestion analysis to identify bottlenecks and utilizing GDOT crash data for safety analysis. Deliverables include a project website, public engagement schedules, and stakeholder involvement strategies. The project is phased, with initiation and data collection beginning in January 2027 and public involvement extending through January 2028. The contract is a fixed-firm agreement, and the award will be based on a scoring system where technical qualifications account for 80 percent and the cost proposal accounts for 20 percent of the total score. Bidders must submit four hard copies of their proposal and a USB flash drive, with the cost proposal submitted in a separate sealed envelope. Mandatory documentation includes a bid response form, a W-9, an E-Verify affidavit, an ethics affidavit, and a debarment and suspension certification. Payment terms are net 30 days in arrears, and the awarded contractor must maintain insurance coverage as specified in the contract for services.
Engineering Services

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
IFB #028-47 Trenchless Stormwater Pipe Rehabilitation at Holland View Drive
Solicitation # 028-47
The Hall County Board of Commissioners is soliciting bids for the trenchless rehabilitation of two corrugated metal pipes crossing Holland View Drive in Georgia, specifically one 72-inch and one 24-inch pipe. The scope of work includes pipe assessment, cleaning, and repair using methods such as spin casting or cured-in-place pipe lining. Additionally, the contractor must replace two concrete headwalls for the 72-inch pipe and one downstream headwall for the 24-inch pipe. A critical deliverable is a hydraulic analysis for the 72-inch pipe, to be conducted both before and after construction to ensure capacity is maintained. The contract will be awarded to the lowest cost, responsible, and responsive bidder, with prior work history and contract compliance also serving as evaluation factors. Bidders must submit four hard copies of their technical proposal, one hard copy of the cost proposal worksheet, and a digital version on a USB drive. A 5% bid bond is required at submission, and the successful contractor must provide performance and payment bonds equal to 100% of the contract value. Performance timelines are strict, with substantial completion required within 45 days of the Notice to Proceed and final completion within 60 days. Payments are issued monthly in arrears on net 30 terms following inspection and acceptance by the County Project Manager.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 21 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS