Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Water Main Installation and Tie-ins

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the New Mexico Department of Transportation involves the installation of a new water distribution system at NM48 Mecham Dr in Lincoln. The scope of work includes furnishing and installing a 12 inch C900 DR18 waterline, applying flowable fill caps, and installing 12 inch insertion valves with corresponding valve boxes. Additionally, the contractor must utilize hot tap methods to connect a temporary 12 inch HDPE waterline into the existing system. The project requires strict adherence to the project specific Itemized List Form to ensure a fully installed and tied-in system. This opportunity falls under NAICS code 237110 and is intended for prime contractors working on state public works projects. All deliverables must be completed according to the specified technical requirements to ensure the integrity of the water main installation.

General Info

Subcontract for installing water distribution system and 12 inch waterline in Lincoln, New Mexico.

Agency

New Mexico Department of TransportationView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Lincoln, NM, USA

Set-Aside

NONE

Documents

This scope was carved out of 2105090.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Call 004 2105090

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew Mexico Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
New Mexico Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs a new water system for prime contractors on state public works projects at NM48 Mecham Dr. Furnishes and installs 12" C900 DR18 waterline, applies flowable fill caps, and installs 12" insertion valves with valve boxes. Performs hot tap methods to tie a temporary 12" HDPE waterline into the existing system. Must comply with project-specific Itemized List Form requirements. Delivers a fully installed and tied-in water distribution system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids from MBE, DBE, and WBE subcontractors and suppliers for a green-street retrofit project located on South Marsham Street in Romney, West Virginia. The project involves the construction of a BMP corridor between Gravel Lane and US Route 50, designed to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area. Key technical requirements include the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and comprehensive drainage, pipe, and downspout work. The scope also encompasses ADA-compliant curb, sidewalk, apron, and crossing improvements, as well as traffic-calming measures. Landscaping requirements specify the planting of six native trees and approximately 345 native plants or approved equivalents, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, HUBZone, woman-owned, and minority-owned businesses, who are encouraged to form consortiums if necessary. Bids must be submitted by September 17, 2026, at 4:00 P.M. Primary coordination for the project is managed by Jonah Leith and Jennifer Wilson.
Harbel, Inc.

POSTED

about 10 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive water infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54 to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves, including 54 and 132-inch diameter valves, as well as 54 and 145.5-inch diameter tie-ins. Additional deliverables include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. Civil works encompass the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. Issued by James W. Fowler Co., the solicitation is open for bids until September 29, 2026. The project is designated as a small business set-aside, specifically encouraging participation from SBA-certified Service-Disabled Veteran-Owned Small Businesses, Minority Business Enterprises, and Woman Business Enterprises. To maximize M/W/DBE participation, the prime contractor is willing to divide contract requirements into smaller portions and provide assistance with bonding, insurance, lines of credit, and the procurement of necessary equipment or materials. The utilization of apprentices is also encouraged. All work must adhere to the plans and specifications provided on the James W. Fowler website.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS