Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Water Main Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-68250-NONST-2027-000000015.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2025 Millen CDBG (PE24101)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Millen
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → City of Millen
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs water distribution infrastructure for prime contractors on City of Millen CDBG projects. Installs 530 LF of 6" C-900 PVC water main, connecting to the existing system, and installs longside and shortside laterals. Materials must comply with the Build America, Buy America Act (BABAA). Delivers installed and connected PVC water mains and laterals.

Similar Contracts

Same NAICS industry code

NAICS: 336612
New
Federal
USCG Response Boat Small Third Generation (RB-S III)
Solicitation # 70Z02326R93250001
The United States Coast Guard is soliciting proposals for the Response Boat Small Third Generation (RB-S III) program to recapitalize its aging fleet of 29-foot RB-S II platforms. This total small business set-aside acquisition involves the design, production, testing, and delivery of up to 440 boats and associated purpose-built trailers, along with logistics support, technical documentation, and crew familiarization. The contract is structured as an Indefinite-Delivery, Indefinite-Quantity (IDIQ) vehicle with an anticipated ten-year ordering period, consisting of a two-year base period and an eight-year option period. Technical requirements specify that vessels must achieve speeds of at least 45 knots, accelerate from 0 to 30 knots in under 15 seconds, and maintain an operational life of 15 years. The procurement utilizes a two-phase competitive acquisition and down-select process based on a best-value tradeoff. In Phase I, the government will evaluate written proposals based on mission effectiveness, production and management, and price to award up to four IDIQ contracts. Each Phase I awardee will produce one demonstrator boat and trailer. In Phase II, these demonstrators will undergo a 90-day in-water demonstration to evaluate performance. Following this comparative evaluation, a single contractor will be selected to receive all subsequent production delivery orders. Phase I proposals are due by 1400 Eastern Time on November 13, 2026, and must be submitted electronically via the Department of Defense Secure Access File Exchange.
LOG-9

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

More opportunities from Georgia → City of Millen

Same awarding agency

NAICS: 237110
New
SLED
2025 Millen CDBG (PE24101)
Solicitation # PE-68250-NONST-2027-000000015
The City of Millen is soliciting sealed bids for the 2025 Millen CDBG project (PE24101), focusing on comprehensive infrastructure improvements. The scope of work includes sanitary sewerage system rehabilitation featuring the replacement of clay sewer mains with approximately 848 linear feet of 8-inch HDPE sewer mains via the pipe burst method, along with manhole rehabilitation and lateral replacement. Water system improvements involve installing 530 linear feet of 6-inch C-900 PVC water main and associated laterals. Additionally, drainage improvements consist of installing 945 linear feet of 24-inch rollover curb and gutter, 560 linear feet of 18-inch storm pipe, and 30 linear feet of 15-inch storm pipe, complemented by curb inlets, grate inlets, roadway pavement overlay, sediment control, and grassing. The allotted time for completion is 120 calendar days. Bids must be submitted by October 29, 2026, at 11:00 AM to the City of Millen City Hall. Eligible contractors must hold a valid State of Georgia Utility Contractor license and employ a certified Utility Manager. Submissions must include a bid bond or certified cashier's check for at least 10 percent of the base bid. The successful bidder will be required to provide performance and payment bonds equal to 100 percent of the contract price from a Georgia-licensed surety with a minimum A rating. This project is funded by the City of Millen and the Community Development Block Grant Program. It is a Section 3 covered contract and is subject to E-Verify regulations, 41 CFR 60-4 affirmative action requirements, and the Build America, Buy America Act (BABAA), requiring that all iron, steel, and manufactured construction materials be produced in the United States.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS