Water Main Piping Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 26046.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

26046

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMichigan → City of Grand Rapids Department of Engineering
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs water main piping systems for prime contractors on City of Grand Rapids Engineering Department projects. Lays 2.5-inch UNS CI2200 grade copper pipe, installs valves, hydrants, thrust blocks, and valve wells. Performs field soldering, hydrostatic testing, flushing, and chlorination per AWWA C605 and C651. Requires NSF 61 and ASTM B88 compliance. Delivers a leak-free, chlorinated, and operating water main system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with full HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction, as well as specialty trade contractors. Interested parties must submit their responses by October 21, 2026. Primary contact for this opportunity is Christina Pauls in the estimating department.
GSE Construction Co., Inc.

POSTED

about 6 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies, along with the abandonment of existing water mains. The work is located on Walnut Street, Ebony Lane, and 247th Place in California. W.A. Rasic Construction Company, Inc. is acting as the prime contractor and is soliciting quotations from subcontractors for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil, compaction, and material testing. This solicitation is specifically targeted toward DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging the formation of consortia for larger tasks. Subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Selected firms will be required to execute the prime contractor's standard subcontract agreement and insurance requirements. Additionally, the prime contractor reserves the right to require payment and performance bonds totaling 100 percent of the subcontractor's bid, with bond premiums reimbursed up to 1.5 percent. The deadline for responses is October 19, 2026.
W.A. Rasic Construction Company

POSTED

about 6 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Michigan → City of Grand Rapids Department of Engineering

Same awarding agency

NAICS: 238220
New
SLED
26046
Solicitation # 26046
Project 26046, issued by the City of Grand Rapids Department of Engineering, involves the removal and replacement of underground boiler supply and return water lines at the Water Resource Recovery Facility, specifically on the north side of the Market Avenue Retention Basin. The scope of work includes the selective demolition of approximately 820 linear feet of 2.5-inch copper lines within a 410-foot trench, followed by the installation of new piping, fittings, and corrosion protection. Technical requirements specify that water main piping must be NSF 61 certified and conform to ASTM B88 and various AWWA standards. Corrosion protection must utilize either high-temperature threshold corrosion protective tape with Buna-N rubber insulation or polyurethane foam. The solicitation requires bids to be submitted via an electronic bidding system, with a bid opening date of October 13, 2026. Bidders must provide a bid bond or cashier's check for at least five percent of the bid amount and submit a detailed subcontractor list with their proposal. Additional post-opening requirements include the submission of a Micro-Local Business Enterprise affidavit within one business day, a supplier list within 48 hours, and insurance and wage forms within seven calendar days. The contract establishes a substantial completion date of December 11, 2026, and a final completion date of January 15, 2027. Award decisions will be based on a comparison of bids using the Engineer's estimate of quantities, though the City reserves the right to select a bidder other than the lowest to serve its best interest.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 20 hours ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS