Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Georgia was posted on September 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Meter and AMI Transmitter Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a construction effort located at the Main Wastewater Treatment Plant in California. The project has an estimated value between 18.5 million and 19.5 million dollars. The scope of work involves the rehabilitation of open and covered concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, modifications to sluice and slide gates, and the installation of new instrumentation, electrical systems, and motor control center components. Additional tasks include excavation, trench work, surveying of reactors, and the installation of platforms for improved access. The solicitation is issued by Ranger Pipelines Incorporated and is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The project encourages the participation of certified DBE, DVBE, and SBE subcontractors for services such as welding, electrical work, concrete rehabilitation, and coating. All work must comply with applicable state, county, and federal regulations. The response deadline for this solicitation is December 2, 2026.
Ranger Pipelines Incorporated

POSTED

about 3 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This subcontract for the City of Oxford involves the removal and replacement of approximately 770 water meters in 3/4, 1, and 2 inch sizes. The scope of work includes the installation of 200 AMI transmitters and 705 backflow preventers, along with the replacement of curb stops, lids, and meter boxes to ensure a fully operational water meter system with AMI connectivity. Qualified bidders must hold a Georgia State Licensed Utility Contractor certification and a Utility Manager certification. The project is categorized under NAICS code 238990, with a response deadline set for November 4, 2026.

General Info

City of Oxford subcontract for water meter replacement and AMI installation by November 2026.

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-70760-NONST-2026-000000013.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

City of Oxford Water and Electric Meter Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 12 days
  • EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2Open now, due in 12 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Oxford
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → City of Oxford
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal and replacement of water meters for prime contractors on City of Oxford utility projects. Replaces approximately 770 water meters (3/4", 1", and 2"), installs 200 AMI transmitters, and installs 705 backflow preventers. Replaces meter boxes, lids, and curb stops. Requires Georgia State Licensed Utility Contractor and Utility Manager certification. Delivers a fully operational water meter system with AMI connectivity.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS