Water Reclamation Plant No. 4 Non-Potable Water Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Coachella Valley Water District is advancing the Water Reclamation Plant No. 4 Non-Potable Water Improvements Project to expand non-potable recycled water production for irrigation purposes, with a long-term goal of reaching 10 million gallons per day across three phased expansions. Phase 1, currently at 60% design, will deliver 1 MGD of treated water through new distribution pipelines to three major agricultural customers south of the plant, with final design expected in early 2026, construction bidding in spring 2026, and completion targeted by the end of 2027. Phase 2, scheduled from 2028 to 2030, will increase capacity to 2.5 MGD by expanding tertiary treatment infrastructure and adding distribution lines to serve nearby customers. Phase 3, envisioned between 2031 and 2045, will depend on post-Phase 2 demand analysis and may scale production up to the full 10 MGD target, contingent on funding availability and regulatory approvals, including a pending Wastewater Change Petition. The project is located at WRP 4 in Thermal, California, ZIP 92274, and must comply with Title 22 of the California Code of Regulations for recycled water quality, as well as federal and state environmental laws including the Clean Water Act, CEQA, RCRA, and DOT regulations. Environmental evaluations have been completed under CEQA, assessing impacts on air quality, water quality, hazardous materials, biological resources, and transportation, with findings categorized as no impact, less than significant, or significant and unavoidable. All construction activities must adhere to stormwater pollution prevention plans developed by qualified practitioners, and hazardous waste packaging, labeling, and storage must meet RCRA and California Hazardous Waste Control Act requirements. The Coachella Valley Water District serves as the lead agency and contracting authority, with William Patterson as the primary point of contact for oversight and environmental compliance. No contract value, pricing structure, or procurement award criteria are specified, as the documentation reflects an environmental planning and permitting stage rather than a competitively awarded contract. Payments, invoicing, and accounting codes are not detailed, and no formal contract clauses, representations, or certifications from offerors are included. The project is classified as a forecast initiative with no assigned solicitation number, and submission of proposals is not part of the current process, which remains focused on regulatory review and public comment through September 2025.

General Info

Coachella Valley Water District expands non-potable water production to 10 MGD in three phases, serving agriculture through new pipelines and compliance with state environmental regulations.

Agency

California → Coachella Valley Water District

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Filmore Street and Avenue 62, CA, 92274

Set-Aside

NONE

Documents

(7)

2023100315_CDFW Comment on Water Reclamation Plant No. 4 DEIR

PDFcomment-letter

2023100315_DWR Comment on Water Reclamation Plant No. 4 Project

PDFcomment-letter

WRP 4 Non-Potable Water Improvements Project Summary Form

PDFenvironmental-summary

WRP 4 Draft Environmental Impact Report

PDFenvironmental-impact-report

WRP 4 Draft EIR_Appendices

PDF

WRP 4 Draft Environmental Impact Report Notice of Availability

PDFnotice-of-availability

WRP 4 NOC - Water Reclamation Plant No. 4 Non-Potable Water Improvements Project

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Coachella Valley Water District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Coachella Valley Water District
Office AddressN/A
Contacts
William PattersonEnvironmental Supervisor
Tom BarnesPrincipal Associate

Interested Companies (1)

Show more
ESA
Sacramento, CA

Full Description

Show more
The proposed project would construct tertiary treatment facilities within the existing WRP 4 plant site to enable production of up to 10 million gallons per day (MGD) of non-potable recycled water for irrigation. CVWD has developed three phases to achieve 10 MGD production and distribution: Phase 1 would produce 1 MGD, Phase 2 would produce an additional 1.5 MGD for a total of 2.5 MGD, and Phase 3 would produce up to 10 MGD. The project implementation schedule provided below is subject to the availability of grant funds and the approval of a Wastewater Change Petition. The proposed project will be implemented in three phases as further described below. 1.The Phase 1 project would design and construct a 1 MGD tertiary treatment facility and a distribution pipeline to deliver a blend of recycled water and canal water to three large agricultural customers south of WRP 4. It is currently at the 60% design stage, and CVWD anticipates completing the final design in early 2026, followed by bidding for construction in spring 2026, with an estimated construction completion by the end of the year 2027. 2.The Phase 2 project would expand the tertiary treatment capacity from 1 MGD to 2.5 MGD and construct additional distribution pipelines to connect new customers in the immediate vicinity of WRP 4, and would be carried out over a three-year period from 2028 through 2030. 3.Under Phase 3, CVWD would monitor the recycled water consumption and demand following Phase 2 completion, to determine the feasibility of connecting new recycled water users up to 10 MGD. It is anticipated that Phase 3 project will be constructed between 2031 and 2045.