Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Water Service Line Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

UT, USA

Set-Aside

NONE

Documents

This scope was carved out of 2508-002.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

GJ27-112 BFWC - Lead and Copper Service Line Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / AgencyUtah
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs new water service lines for prime contractors on Utah Lead and Copper Service Line Replacement projects. Removes existing lead, copper, or galvanized service lines and installs IPS (Iron Pipe Size) service lines using standard installation tools. Delivers 1,460 linear feet of installed IPS service line.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with full HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction, as well as specialty trade contractors. Interested parties must submit their responses by October 21, 2026. Primary contact for this opportunity is Christina Pauls in the estimating department.
GSE Construction Co., Inc.

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the furnishing of all necessary materials, tools, and equipment. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and compaction testing. This solicitation is specifically targeted toward DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging the formation of consortiums for larger portions of the work. Subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors may be required to provide payment and performance bonds totaling 100 percent of their bid, with bond premiums reimbursed up to 1.5 percent. All quotations must be submitted to Estimating Manager Matt Metoyer by the deadline of October 19, 2026.
W.A. Rasic Construction Company

POSTED

about 4 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Utah

Same awarding agency

NAICS: 485119
New
SLED
PROVO CITY SHARED MICROMOBILITY PROGRAM
Solicitation # PR2026001041
Provo City, Utah, is soliciting proposals under RFP PR2026001041 for a vendor to develop, install, operate, and maintain a comprehensive shared micromobility program. The project involves the deployment of a dockless fleet of e-bikes and e-scooters within the public right-of-way to provide an alternative to single-occupancy vehicle trips. The successful vendor will own and operate the system, which must include modern technology, safety features like handlebar bells and reflectors, and adherence to Class 1, 2, or 3 e-bike classifications. A key requirement is the provision of equitable access, including pricing and usage options for individuals without smartphones or credit cards. The program is intended for an initial three-year term with two optional one-year extensions, targeting a launch date of December 2026. The city expects the program to be financially sustainable with limited to no public investment, requiring the vendor to secure funding through user fees, sponsorships, or private financing. Award selection will be based on a scoring system from 1 to 5, with a final review including reference checks. The selected vendor must enter into an Operating Agreement and a Limited Waiver and Hold Harmless Agreement, while maintaining all necessary insurance and indemnifying the city. Proposals must be submitted electronically via Bonfire by November 6, 2026, and must include a signed vendor statement and detailed organizational and operational descriptions. Finalists will be required to submit confidential financial statements for further review.
Other Urban Transit Systems

POSTED

about 22 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
GJ27-111 HVSSD - WWTP Groundwater Monitoring Well Drilling and Installation
Solicitation # 26-1
The Heber Valley Special Service District (HVSSD) is soliciting bids for the drilling, construction, development, and testing of three 2-inch diameter groundwater monitoring wells at its wastewater treatment plant in Wasatch County, Utah. The project involves drilling to estimated depths of 45 to 60 feet through fluvial and Quaternary-age sediments and tufa, utilizing a temporary 8-inch diameter conductor casing. Mud-rotary techniques are strictly prohibited. The contractor is responsible for providing all labor, materials, and equipment, as well as collecting representative formation samples at minimum 5-foot intervals and providing detailed driller logs and reports. All work must comply with the Utah Administrative Code, the Utah Water Quality Act, and Utah Drinking Water Standards. Bids are due by 4:00 PM MT on October 14, 2026, and must be submitted to the HVSSD offices in Midway, Utah. A mandatory pre-bid conference is scheduled for October 7, 2026. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluations considering qualifications, experience, and a price comparison that adjusts for the time of substantial completion. Submissions must include a signed Bid Form and a comprehensive Contractor Qualification Statement detailing similar project experience from the last ten years and at least three professional references. The performance period requires work to begin within 10 days of the Notice to Proceed, with substantial completion due within 45 days and final completion within 60 days. The contractor must provide both performance and payment bonds, as well as liability insurance. Payment is based on actual quantities furnished and installed for unit price items. The project is overseen by the Engineer, Loughlin Water, who holds the authority to inspect work and determine final acceptance.
Water and Sewer Line and Related Structures Construction

POSTED

about 23 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS