Water Supply and Storage Improvements

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Yreka

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Humbug/Yreka Walker Rd, Taylor Ave, Davis Rd, Fairlane Rd, Yreka, CA, 96097

Set-Aside

NONE

Documents

(1)

2025 CEQA Addendum - Yreka Water Supply and Storage Improvements

PDFceqa-addendum

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Yreka
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Yreka
Office AddressN/A
Contacts
Juliana LucchesiAssistant City Manager
Carla L. ThompsonEnvironmental Planning Manager

Interested Companies (1)

Show more
Enplan
Redding, CA

Full Description

Show more
The City of Yreka (City), as Lead Agency, prepared an Initial Study (IS) and adopted a Mitigated Negative Declaration (MND) for the Yreka Water Supply and Storage Improvements Project on December 21, 2017 (State Clearinghouse No. 2017112029). The project is located within the City of Yreka and in an unincorporated area of Siskiyou County. The project consists of improvements to the City’s existing public water system, including replacement of existing water tanks, installation of new water mains, and construction of a new well and associated improvements. Following approval of the project, City staff and PACE Engineering determined that revisions to the project were needed. The proposed revised improvements include new alignments for the water main and electrical conduit at the Lower Humbug Water Tank site; potential improvements to an existing access road to the Shasta Belle Water Tank site; and repaving the existing parking lot and installing new underground electrical conduit at the Davis Well site. This document constitutes an Addendum to the 2017 IS/MND and evaluates whether the revised improvements would result in any new or substantially more adverse significant effects or require any new mitigation measures not identified in the 2017 MND. The revised improvements are as follows: Lower Humbug Water Tank Site: Revised improvements include relocating a ~450-foot section of water main and installing ~715 feet of new underground electrical conduit at the site. Shasta Belle Water Tank Site: The additional study area includes a ~800-foot section of an existing access road. Potential improvements would be limited to placement of aggregate base within the roadway. No trees would need to be removed. Davis Well Site: Revised improvements include repaving the existing ~0.4-acre parking lot and installing ~500 feet of new underground electrical conduit.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation # 36C24626B0031
Solicitation 36C24626B0031 is an Invitation for Bids (IFB) issued by the Department of Veterans Affairs Network Contracting Office 6 for Project 658-23-108, which involves correcting stormwater drainage at the Salem VA Medical Center in Salem, Virginia. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated construction magnitude between $10,000,000 and $20,000,000. The scope of work includes providing all labor, materials, and equipment for general construction and utility work, specifically the installation of a dewatering system to control ground surface water during excavation. The performance period is 450 calendar days from the issuance of the Notice to Proceed. The contract will be awarded based on FAR Part 14 Sealed Bidding procedures, typically to the lowest responsive and responsible bidder. Eligible SDVOSB bidders must be registered in the System for Award Management (SAM) and are required to perform at least 25% of the construction work. Key requirements include a bid guarantee of at least 20% of the bid price (capped at $3,000,000), adherence to Davis-Bacon wage determinations, and the ability to demonstrate the completion of three similar projects within the last three years. The final bid submission deadline was extended to October 20, 2026, with a public bid opening on October 21, 2026.
246-NETWORK Contracting Office 6 (36C246)

POSTED

about 4 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS