Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Water Treatment Plant HVAC Repair

Active
CON-2019-06State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract awarded to Mac Air Northwest, LLC of Bremerton, WA, is a firm fixed-price agreement totaling $5,869.80 for HVAC repairs at the Water Treatment Plant located in Port Angeles, Washington. The project, identified by solicitation number CON-2019-06, entails repairing a refrigerant leak in the HP#1 heat exchanger unit, including refrigerant evacuation and recovery in compliance with EPA regulations, replacement of specific components such as the liquid line drier and sight glass, welding defective joints, and system recharging with up to 20 pounds of R-22 refrigerant. The work is to be performed on-site Monday through Friday during standard daytime hours and completed within 10 working days following the notice to proceed. All debris generated during the work is the contractor’s responsibility for disposal. The City of Port Angeles retains inspection and acceptance authority at the project site and requires strict adherence to applicable local, state, and national codes and standards including multiple International Codes, the Washington State Energy Code, and environmental regulations governing refrigerants. The procurement process involved a competitive bidding phase with bids due by March 7, 2019. Mac Air Northwest submitted the lowest responsive bid, slightly under the government estimate of $6,000, leading to their award. The contract includes standard municipal provisions addressing contractor responsibilities for compliance with prevailing wage laws, nondiscrimination and affirmative action policies, insurance requirements with specified minimum coverages, and indemnification clauses protecting the City. The contract mandates certified payroll reporting, prohibits subcontractor assignment without prior written consent, and specifies a one-year warranty period for correction of defects. Payment procedures require submission of invoices referencing the contract number, with payment issued within 30 days of approval. Overall, this contract reflects a routine small public works project executed under city governance emphasizing regulatory compliance, quality workmanship, and effective administrative oversight.

General Info

Fixed-price $5,869 HVAC repair contract for refrigerant leak at Port Angeles Water Treatment Plant.

Agency

Washington → Port AngelesView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

WA, USA

Set-Aside

NONE

Documents

(3)

Bid Tabulation for Project CON-2019-06

PDF1 pageother

CON-2019-06 Water Treatment Plant HVAC Repair Contract

PDF10 pagescontract-document

CON-2019-06 Instruction to Bidders and Quotation Form

PDF4 pagesrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWashington → Port Angeles
ContactsNo contacts available
OfficeN/A
Organization / Agency
Washington → Port Angeles
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Award to Mac Air Northwest, LLC, Bremerton, WA for $5,869.80 Bid is closed! Bid Tabulation attached!
Bids due: Thursday, March 7, 2019 at 2:00 PM.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
CBP5933 Bldg. 225 HVAC Replacement
Solicitation # CBP5933
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontracting opportunity to replace six split-system heat pump HVAC systems at Building 225 of the San Diego Job Corps Center in Imperial Beach, California. The scope of work includes the installation of three 2-ton and three 1.5-ton Payne heat pump systems with matching indoor air handlers, as well as the removal and disposal of old equipment. The contractor is responsible for providing all labor, materials, and supervision, ensuring compliance with California Mechanical and Electrical Codes, OSHA standards, and U.S. Department of Energy efficiency requirements. Bids are due by September 11, 2026, and will be evaluated based on overall best value, considering price, quality, and delivery schedule. The estimated contract value ranges from $25,000 to $100,000. For bids equal to or exceeding $25,000, a bid bond of 20% of the base bid is required, along with performance and payment bonds from an A-rated surety company upon award. This project is subject to the Davis-Bacon Act, requiring adherence to prevailing wage rates and specific paid sick leave mandates. Eligible set-asides include various small business categories such as SDB, WOSB, HUBZone, and SDVOSB. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a Unique Entity Identification (UEI) number, and a completed W-9. Work must commence within 30 calendar days of the Notice to Proceed.
San Diego Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238220
New
RFQ#3191 Laundry Tray Installations
Solicitation # RFQ#3191
Management & Training Corporation (MTC) is seeking bids under RFQ#3191 for a subcontracting opportunity to provide plumbing services at the Charleston Job Corps Center in Charleston, West Virginia. The project requires the contractor to provide all labor, materials, and supervision to remove existing units and install new laundry trays and faucet sets in the Education and CTT restroom areas. Key technical requirements include installing fixtures on Everform Graphite Terrazzo Matrix countertops, reconnecting hot and cold water supply lines and drainage systems, and ensuring all connections are watertight and compliant with local plumbing codes and Job Corps facility standards. The contractor is also responsible for testing all fixtures for proper flow and drainage and removing all debris from the work area upon completion. Bids must be submitted as a lump sum fee by September 11, 2026, at 3:00 PM EST. To be considered for award, applicants must provide a bid sheet, proof of insurance, three references for similar projects, and a completed supplier packet including a W-9 and self-certification form. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and SDVOSB. The contract is subject to Service Contract Act prevailing wages per Wage Determination 2015-4347 and requires adherence to FAR regulations regarding executive compensation reporting for awards over 40,000 dollars, as well as strict government and Department of Labor guidelines for information security and confidentiality. MTC will determine the award based on the best value.
Management & Training Corporation

POSTED

about 2 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking subcontractors for a project to replace a failing air-cooled chiller in Building 214/215 at the North Texas Job Corps Center in McKinney, Texas. The scope of work includes the demolition and disposal of the existing chiller, installation and startup of a new air-cooled chiller, and the integration of building automation controls featuring a JACE 9000 central integration point with a graphical user interface. Additionally, the contractor must clean and inspect air handling units, replace control valves for four units, replace three of four air handler VFDs, and ensure all work areas are cleared of debris. This is a small business set-aside opportunity under NAICS code 238220. Bids are due by September 18, 2026, and must remain valid for 90 days. Required submission documents include manufacturer equipment specifications, Form 1413 for Davis-Bacon Act certified payroll compliance for work exceeding 2,000 dollars, and a Certificate of Liability Insurance naming Serrato Corporation as the holder. Insurance minimums include 1,000,000 dollars for Commercial General Liability and Comprehensive Automobile Liability, and 500,000 dollars for Employers Liability. Primary contact for this solicitation is Stacy Smith, Finance and Administration Director.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 2 hours ago

DEADLINE

in 19 days
View Details
NAICS: 238220
New
AC Compressor Replacements for Gym, Academic and Kitchen Area
Solicitation # MI 2026-05
The Miami Job Corps Center, operated by Adams and Associates, Inc. for the U.S. Department of Labor, is soliciting bids for the replacement of damaged AC compressors in the gym, academic, and kitchen areas. The project involves replacing units that are over 20 years old and utilize phased-out gas, specifically targeting two compressors for AHU-E3 and one each for AHU-E5 and AHU-E6 in the gym, one for AHU-B5 in the academic area, and one for AHU-F2 in the kitchen. The selected contractor must provide a single lump sum bid with a detailed cost breakdown and is responsible for the installation of new units, disposal of old equipment, and the provision of training, operating manuals, and manufacturer warranties. All work must comply with OSHA, EPA, and Florida state and local building codes, with a one-year guarantee on all workmanship. The award will be based on best value, with evaluation weights distributed across price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Eligible bidders must be registered in SAM.gov with a valid Unique Entity ID and provide a valid Florida Contractor's License, insurance certificates naming Adams and Associates, Inc. as an additional insured, and certification of compliance with Davis-Bacon wage determinations. Proposals are due by September 3, 2026, and must include a vendor questionnaire, W9, and a sequenced construction schedule submitted within 10 days of the Notice to Proceed. Payment is set at Net 30 terms, contingent upon the submission of certified payroll records, release of liens, and a completed SF 1413.
Miami Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 4 days
View Details