Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on October 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Weiskotten Hall Addition (WHA) Electrical Equipment Upgrades

Closed
2115055State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County (HOC) for the demolition of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and lead walks. While above-grade utilities must be removed, underground utilities are to be capped or abandoned in place, and all asphalt, curbs, and gutters are to remain. Additionally, the contractor is responsible for removing dumped materials from the neighboring Emory Grove Village parcel. The initial period of performance is four months from the Notice to Proceed, and the contractor is responsible for obtaining all necessary raze permits and adhering to the Montgomery County Approved Sediment Control Plan. Proposals must be submitted via the OpenGov Procurement Portal by November 13, 2026, at 12:00 pm. Evaluation is points-based, with 20% of the score weighted toward the schedule and 15% toward the price proposal. Award criteria emphasize safety, expedited completion, and quality assurance. Mandatory requirements include 100% payment and performance bonds, comprehensive insurance, and strict adherence to HOC Contractor and Subcontractor Background Screening Requirements. Compliance with the HOC Works Program, Davis-Bacon Wages, Maryland Prevailing Wage Laws, and HUD certifications regarding debarment and suspension is required. Payment terms include a 30-day processing window following approval, with a 5% retainage held until final acceptance by HOC.
Real Estate

POSTED

about 6 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract involves upgrading the electrical systems at the Weiskotten Hall Addition (WHA) and surrounding buildings at SUNY Upstate Medical University, with bids due by December 12, 2024. The scope includes replacing and modernizing existing electrical infrastructure, such as switchgear, transformers, distribution panels, and feeders, to enhance capacity and reliability. Work also entails constructing new supports, concrete pads, outdoor transformer pads, and performing selective demolition and construction of new partitions and supports, all within a 180-day timeframe. Additionally, asbestos abatement of certain electrical components is required to ensure safety and compliance. Bidders must submit their proposals with a security deposit of at least 5% of the total bid, and the project encourages participation from minority, women, and service-disabled veteran-owned businesses, with specific subcontracting goals. A pre-bid conference will be held on November 15, 2024, at the project site. The contract emphasizes strict adherence to procurement procedures, including formal communication for questions, and reserves the right to reject any or all bids. The project aims to ensure continuous building operation during upgrades through temporary power provisions and coordinated outage schedules, with completion expected within 180 days of the notice to proceed.

General Info

Place of Performance

NY, USA

Set-Aside

NONE

Documents

1

Project 151006/685.7 - Weiskotten Hall Addition (WHA) Electrical Equipment Upgrades

DOCX, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyState University of New York (SUNY)
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The State University of New York at Upstate Medical University will receive sealed bids for Project Number ­­­151006/685.7 Titled Weiskotten Hall Addition (WHA) Electrical Equipment Upgrades until 2:00 p.m. local time on Thursday, December 12, 2024 at: Delivered to: Mrs. Shawna Frigon/Ms. Ivy Lopez Contracts & Campus Purchasing SUNY Upstate Medical University Dr. Sarah Loguen Center, 2nd floor 650 South Salina Street, Room 2048 Syracuse, New York 13202 where such proposals will be publicly opened and read aloud. Proposals may be hand delivered or mailed to the above location and must be received at such time. Scope of work is to include all necessary labor, material, and equipment for the Weiskotten Hall Addition (WHA) Electrical Equipment Upgrades. The main features of the work shall include, but not be limited to the following: Electrical: Replacement and modernization of existing electrical infrastructure in the Weiskotten Hall Addition (WHA), NAB and Sliverman Buildings. In WHA replace 5kV MV switches (SS#4, SS#5, SS#6 & NAB) with new S&C custom switchgear with VISTA distributions ‘SSVS-1’ & ‘SSVS-2’, extension of existing 5kV MV feeders, replacement of step-down transformers (SS#4, SS#5 & SS#6) with new and associated HVLcc switches. In WHA replace existing 120/208V and 277/480V switchgear with new 120/208V, 4000A, 3-Phase, 4-Wire and 277/480V, 4000A, 3-Phase, 4-Wire Main-Tie-Main switchgear equipment. Furnish and install new step-down transformer SS#7 to supply one side of Main-Tie-Main 120/208V switchgear. In WHA furnish and install new 800A automatic transfer switch to replace existing allowing for space to install new electrical switchgear equipment. In WHA replace existing circuit breaker in emergency distribution board serving fire pump with new 800A. In WHA replace distribution panels ‘DLR’, ‘PP5’, ‘DVR’, ‘EDN, ‘DPNR’, ‘DER’, ‘DPMR’, ‘DPSR’, ‘EDS’ with new. Furnish and install normal and emergency conduit system with associated wiring between electric MV, 120/208V, 277/480V switchgear, distribution boards, ATS, panelboards, etc. In WHA replace existing vertical aluminum riser conductors with copper utilizing existing wire troughs. In WHA furnish and install feeders, panels and equipment in electrical closets on upper floors. In manhole MH-NA eliminate existing splice serving Clark Hall, Campus Activity and Jacobsen Hall buildings and supply them from new SSVS-1 MV distribution. In NAB building replace existing 5kV switch with new duplex HVLcc switch and install new 5kV feeders from SSVS-1 and SSVS-2 MV distributions in WHA. New duplex HVLcc shall supply existing 1000kVA step-down transformer. For Silverman building, install new 5kV feeder from SSVS-2 in WHA, 750kVA outdoor pad mount step-down transformer and new distribution board to supply existing loads in the building. Provide temporary distribution boards, panelboards, feeders, etc. as indicated on the design documents. Schedule all outages with Upstate Medical University. Provide temporary power to areas affected by power interruptions Transfer feeders to new distribution as called for on contract documents. Installation and removal of temporary required to maintain full functionality of the building during feeder cut overs and outages. General Construction: Selective demolition of existing walls floors and site work. The contractor will be responsible for coordinating all work indicated on contract documents with owner and SUCF. Construction of new 2-hour rated partitions, doors and soffits as indicated on the design documentation. Structural: Construction of new supports for conduit banks. Construction of new concrete pads for floor mount electrical equipment. Construction of new outdoor transformer pad to supply Silverman building. Asbestos Abatement: Abatement of sheetrock with ACM joint compound and disposal of presumed asbestos containing electrical equipment. All work on this Contract is to be completed within 180 days after the date of the Notice to Proceed. Complete sets of Contract Documents for bidding may be examined free of charge at the campus and at the following locations. SUNY Upstate, Design and Construction, 650 South Salina Street, 2nd floor, Syracuse, NY 13202. Complete sets of Contract Documents for bidding may ONLY be obtained from: Syracuse Blueprint Company, Inc., 825 East Genesee Street, Syracuse, NY  13210, Attn: Karen Johnson, E-mail: contact@example.gov, Ph. +1 (555) 000-0000, FAX: +1 (555) 000-0000, Section 143 of the State Finance Law requires payment of a deposit to receive these documents. Accordingly, a deposit check of $49.50 made payable to SUNY Upstate Medical University, is required. Deposits less than $50.00 are nonrefundable. Deposits will be waived for certified Minority and Women Owned and Service-Disabled Veteran Owned Businesses. A pre-bid conference and project walk-through will be held on Friday, November 15, 2024, at  10:00  AM with all contractors assembled at the Main Lobby of Weiskotten Hall, 766 Irving Ave, Syracuse, New York. Effective 1/1/06, in accordance with State Finance Law Section 139-j, all questions pertaining to the solicitation shall be made formally to the designated contact in Contracts & Campus Purchasing: Mrs. Shawna Frigon & Ms. Ivy Lopez SUNY - Upstate Medical University, 750 East Adams Street, Syracuse, New York 13210, Phone: +1 (555) 000-0000 +1 (555) 000-0000 Fax: +1 (555) 000-0000, PM: Rod Parks, Phone +1 (555) 000-0000 and Consultant: Lizardos Engineering Associates, PC Mechanical & Electrical Engineering, Kevin Zheng, Phone: +1 (555) 000-0000, X259. Contact made to other staff regarding this procurement may disqualify the firm and affect future procurements with government entities in the State of New York.  Please refer to the OGS’ (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil.html) for more information on this law. All questions pertaining to the solicitation during the restricted period shall be made formally to each Designated Staff concurrently:   Contracting Staff:                                   Shawna Frigon Contracts Administrator Contracts & Campus Purchasing SUNY - Upstate Medical University 750 East Adams Street Syracuse, New York 13210 Phone: (315) 464- 4680 Email: contact@example.gov Project Manager Rod Parks Project Manager Design and Construction SUNY - Upstate Medical University 750 East Adams Street Syracuse, New York 13210 Phone: (315) 382- 7365 Email: contact@example.gov Consultant Kevin Zheng Electrical Engineer Lizardos Engineering Associates 200 Old Country Road, Suite 670 Mineola, NY  11501 Phone +1 (555) 000-0000, X-259 e-mail: contact@example.gov Bids must be submitted in duplicate in accordance with the instructions contained in the Information for Bidders. Security will be required for each bid in an amount not less than five (5) percent of the Total Bid. It is the policy of the State of New York and the State University of New York to encourage minority business enterprise participation in this project by contractors, subcontractors and suppliers, and all bidders are expected to cooperate in implementing this policy. The State University of New York reserves the right to reject any or all bids. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Due date:12/12/2024 2:00 PM Eastern Standard Time Contract term: 180 Calendar Days County(ies): All NYS counties Location: 750 East Adams Street Business entities awarded an identical or substantially similar procurement contract within the past five years: RJ Ortlieb Murnane Building Contractors CBD C&S Companies GM Crisalli

More opportunities from State University of New York (SUNY)

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS