Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on May 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Well 119 Maintenance & Rehabilitation

Closed
26-034State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 15 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The contract involves the maintenance and rehabilitation of Well 119, which was originally constructed in 1989 using drift formations and is gravel packed. The well features a 12-inch casing with a pitless adapter and a 20-inch casing extending from about 7 feet to 80 feet below ground, with screening between 80 feet and a total depth of 130 feet. The project focuses on formation redevelopment and includes inspection and repair of the well's equipment, such as electrical cables, motor, and column piping. A key operational issue has been over-pumping with the current pump, which has been managed by throttling the discharge valve. A new Byron Jackson Model 10MQH, 3-stage full-diameter submersible pump will be provided by the City for installation under this contract. The solicitation for this work is issued by the Water Production department based in Aurora, Illinois, with a response deadline of May 29, 2026. The contract is managed through the local government procurement system, and contact is facilitated through Robert Leible, Superintendent of Water Production, as well as the Purchasing Department. This rehabilitation project aims to restore optimal well performance by addressing long-standing operational inefficiencies and upgrading critical pump components.

General Info

Maintenance and rehabilitation of Well 119 including pump upgrade and formation redevelopment by May 29, 2026.

Documents

3

City of Aurora Well 119 Maintenance & Rehabilitation 26-034

PDF, High priority: read this firstitb
High

Water Well No. 119 Rehabilitation Project Manual - Bid No. 26-034

PDF, High priority: read this firstcontract-document
High

Well 119 Maintenance & Rehabilitation RFP 26-034

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → Water Production
Contacts2 people available
OfficeAurora, IL, 60502, USA
Organization / AgencyIllinois → Water Production
Office AddressAurora, IL, 60502, USA
Contacts
Robert LeibleSuperintendent of Water Production
Purchasing DivisionPurchasing Department

Interested Companies (11)

National Water ServicesPaoli, IN
Water Well Solutions IllinoisNaperville, IL
Dodge Construction NetworkGrand Prairie, TX

See All 11 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The existing Well 119 was originally constructed in 1989 and completed in drift formations and is gravel packed. The well consists of 12-inch casing (pitless adapter), 20-inch casing extending from approximately 7 feet to 80 feet below ground surface, and is screened from 80 feet to a total depth of 130 feet. The primary purpose and intent of this project is formation redevelopment, combined with inspection and repair of all related well equipment, including electrical cables, motor, and column piping. Over-pumping of the formation with the existing pump has been a long-standing operational issue and is currently mitigated through throttling of the discharge line valve. A replacement pump will be furnished by the City for installation under this contract. The pump is a Byron Jackson Model 10MQH, 3-stage, full-diameter submersible pump.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS