Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Illinois was posted on May 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Well 119 Maintenance & Rehabilitation

Closed
26-034State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; and specialized electrical and piping installations. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of September 17, 2026. The project is partially funded by the Water Infrastructure Finance and Innovation Act administered by the EPA, making it subject to the American Iron and Steel provisions, Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include DBE, SBE, MBE, WBE, SBRA, LSFA, and HUB Zone small businesses, with DBEs required to provide valid certification from recognized bodies such as the US EPA or SBA. Qualified respondents must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. This firm-fixed-price contract, with an estimated value between 1 million and 5 million dollars, involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal at an approved offshore site south of Oahu. The scope also includes vegetation clearance and revetted mole repairs, such as stone rework, filling voids with additional stone, and root removal. The period of performance is 200 calendar days from the receipt of the Notice to Proceed. The solicitation is set aside for HUBZone Small Businesses, who receive a 10 percent price evaluation preference. Award is based on the lowest responsive bid that complies with all material respects of the invitation. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act for wages, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Technical acceptance is based on third-party multi-beam hydrographic surveys and strict quality standards for stone materials. Bids must be submitted physically via commercial carrier or in-person by September 30, 2026, as electronic submissions are not permitted.
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract involves the maintenance and rehabilitation of Well 119, which was originally constructed in 1989 using drift formations and is gravel packed. The well features a 12-inch casing with a pitless adapter and a 20-inch casing extending from about 7 feet to 80 feet below ground, with screening between 80 feet and a total depth of 130 feet. The project focuses on formation redevelopment and includes inspection and repair of the well's equipment, such as electrical cables, motor, and column piping. A key operational issue has been over-pumping with the current pump, which has been managed by throttling the discharge valve. A new Byron Jackson Model 10MQH, 3-stage full-diameter submersible pump will be provided by the City for installation under this contract. The solicitation for this work is issued by the Water Production department based in Aurora, Illinois, with a response deadline of May 29, 2026. The contract is managed through the local government procurement system, and contact is facilitated through Robert Leible, Superintendent of Water Production, as well as the Purchasing Department. This rehabilitation project aims to restore optimal well performance by addressing long-standing operational inefficiencies and upgrading critical pump components.

General Info

Maintenance and rehabilitation of Well 119 including pump upgrade and formation redevelopment by May 29, 2026.

Agency

Illinois → Water ProductionView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

IL, USA

Set-Aside

NONE

Documents

(3)

Water Well No. 119 Rehabilitation Project Manual - Bid No. 26-034

PDFcontract-document

Well 119 Maintenance _ Rehabilitation.pdf

PDF

Well 119 Maintenance & Rehabilitation RFP 26-034

PDFrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → Water Production
Contacts2 people available
OfficeAurora, IL, 60502, USA
Organization / Agency
Illinois → Water Production
View Agency Profile
Office AddressAurora, IL, 60502, USA
Contacts
Robert LeibleSuperintendent of Water Production
Purchasing DivisionPurchasing Department

Interested Companies (11)

Show more
National Water Services
Paoli, IN
Water Well Solutions Illinois
Naperville, IL
Dodge Construction Network
Grand Prairie, TX

See All 11 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The existing Well 119 was originally constructed in 1989 and completed in drift formations and is gravel packed. The well consists of 12-inch casing (pitless adapter), 20-inch casing extending from approximately 7 feet to 80 feet below ground surface, and is screened from 80 feet to a total depth of 130 feet. The primary purpose and intent of this project is formation redevelopment, combined with inspection and repair of all related well equipment, including electrical cables, motor, and column piping. Over-pumping of the formation with the existing pump has been a long-standing operational issue and is currently mitigated through throttling of the discharge line valve. A replacement pump will be furnished by the City for installation under this contract. The pump is a Byron Jackson Model 10MQH, 3-stage, full-diameter submersible pump.

More opportunities from Illinois → Water Production

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS