This Solicitation opportunity from Illinois was posted on May 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Well 119 Maintenance & Rehabilitation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the maintenance and rehabilitation of Well 119, which was originally constructed in 1989 using drift formations and is gravel packed. The well features a 12-inch casing with a pitless adapter and a 20-inch casing extending from about 7 feet to 80 feet below ground, with screening between 80 feet and a total depth of 130 feet. The project focuses on formation redevelopment and includes inspection and repair of the well's equipment, such as electrical cables, motor, and column piping. A key operational issue has been over-pumping with the current pump, which has been managed by throttling the discharge valve. A new Byron Jackson Model 10MQH, 3-stage full-diameter submersible pump will be provided by the City for installation under this contract. The solicitation for this work is issued by the Water Production department based in Aurora, Illinois, with a response deadline of May 29, 2026. The contract is managed through the local government procurement system, and contact is facilitated through Robert Leible, Superintendent of Water Production, as well as the Purchasing Department. This rehabilitation project aims to restore optimal well performance by addressing long-standing operational inefficiencies and upgrading critical pump components.
General Info
Agency
NAICS
Place of Performance
IL, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (51)
See All 51 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
