Well Pump Replacement and Emergency Power Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for the Upper Lake County Water District involves the mechanical replacement of failing well pumps and the installation of emergency backup power systems. The scope of work specifically requires the removal and replacement of the well pump in Well 2, as well as the installation of emergency generators and transfer switches for Well 1. The contractor must ensure all work adheres to established electrical codes for emergency power and meets all necessary water well certifications. The primary objective of the project is to deliver fully operational well pumps and functional emergency power systems to maintain water district reliability.
General Info
Agency
Place of Performance
CA, 95485Set-Aside
Documents
This scope was carved out of Meadow Pointe Water System/Upper Lake County Water District Consolidation.
The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
