Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Well Rehabilitation and Downhole Inspection

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of TustinView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Tustin, CA, 92780, USA

Set-Aside

NONE

Documents

This scope was carved out of CIP No. 60177.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Main Street Well 3 & Newport Well 3 Improvements Project (2026/2027)

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Tustin
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Tustin
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs comprehensive rehabilitation of municipal water-supply wells and diagnostic inspections for prime contractors on City of Tustin water well projects. Conducts downhole video inspection, electromagnetic casing-thickness analysis, nylon brushing of 16-inch casing, and chemical rehabilitation to remove mineral scale and biological fouling. Disinfects wells per ANSI/AWWA C654. Delivers digital video, annotated logs, and casing thickness reports.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and related site improvements. The project requires the provision of all necessary labor, materials, transportation, tools, and equipment to ensure a complete and operational system, including disinfection, startup, and commissioning. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for various trade scopes, including traffic control, survey and staking, trenchless construction, steel pipe welding, and electrical and instrumentation. All bids and quotes are due by September 18, 2026, at 2:00 PM PT. Because Garney Pacific, Inc. is a union contractor, all subcontractors must utilize union labor. Additionally, potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company and must provide their bond rate at the time of the bid. The primary point of contact for this solicitation is Alyssa Callaway.
Garney Pacific, Inc.

POSTED

about 11 hours ago

DEADLINE

in 10 days
View Details

More opportunities from California → City of Tustin

Same awarding agency

NAICS: 237110
SLED
Main Street Well 3 & Newport Well 3 Improvements Project (2026/2027)
Solicitation # CIP No. 60177
The City of Tustin is soliciting bids for the Main Street Well 3 and Newport Well 3 Improvements Project (CIP No. 60177), with an engineer's estimate of $775,000. The project involves comprehensive improvements to two municipal wells, including the removal, inspection, and rehabilitation of pumps and motors, downhole video inspections, and final commissioning. Specific requirements for Main Street Well 3 include converting the oil-lubricated lineshaft system to a continuous water-lubricated configuration and performing well rehabilitation. Newport Well 3 requires noninvasive electromagnetic casing-thickness inspections and upgrades to the magnetic flow meter, motor-operated valves, and PLC/SCADA systems. The contract will be awarded to the lowest responsive and responsible bidder, with a project schedule of 150 working days and a final completion deadline of June 30, 2027. Liquidated damages are set at $1,000 per day. Bidders must submit electronic proposals via the OpenGov portal by September 15, 2026, and provide a hard-copy bid bond to the City Clerk. The contractor is responsible for all quality assurance testing and must comply with the 2024 Standard Specifications for Public Works Construction, Cal-OSHA safety regulations, ADA standards, and California prevailing wage laws. Required documentation for submission includes a vendor questionnaire, unit prices, project references, and a compensation insurance certification.
Water and Sewer Line and Related Structures Construction

POSTED

28 days ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS