Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Multimodal Corridor Planning and PS&E Development

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Multimodal Corridor Planning and PS&E Development supports prime contractors on City of Tustin corridor projects. The scope of work involves performing multimodal engineering and planning, which includes data collection, safety and conflict analysis, and the development of corridor alternatives. The selected provider will utilize GIS and transportation modeling software to create concept-level programmatic cost estimates and a series of final PS&E packages at the 30, 60, and 90 percent draft stages. All deliverables must adhere to Vision Zero, City of Tustin, and OCTA standards, culminating in the delivery of a final PS&E package and a feasibility technical memorandum. The project is located in Tustin, California, under NAICS code 541330. Interested parties must submit their responses by the deadline of October 6, 2026.

General Info

Multimodal engineering and PS&E development for Tustin corridor projects due October 6, 2026.

Agency

California → City of TustinView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Tustin, CA, 92780, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260822030.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

First Street Multimodal Corridor Study

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Tustin
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Tustin
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs multimodal engineering and planning for prime contractors on City of Tustin corridor projects. Conducts data collection, conflict/safety analysis, and develops corridor alternatives. Prepares concept-level programmatic cost estimates and final PS&E packages (30%, 60%, and 90% drafts) using GIS and transportation modeling software. Adheres to Vision Zero, City of Tustin, and OCTA standards. Delivers the final PS&E package and feasibility technical memorandum.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is soliciting sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing various engineering supports including civil, structural, mechanical, electrical, and instrumentation and controls. Additional requirements include utility locating, potholing, geotechnical and geophysical investigations, BIM/3D modeling, land surveying, LIDAR, drone services, and comprehensive environmental services such as permitting, compliance monitoring, and hazardous materials surveys. Project management needs include CPM scheduling and commissioning and startup planning. Interested firms must contact Lead Estimator Joe Bockelman to receive an Invitation to Bid via the Building Connected system. The bid deadline is September 11, 2026. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit agreeing to reimburse the bond premiums. This solicitation specifically encourages participation from certified Disadvantaged Business Enterprises, including MBE, WBE, and OBE firms. Kiewit, a signatory to several collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project.
Kiewit Infrastructure West Co.

POSTED

about 11 hours ago

DEADLINE

in 2 days
View Details

More opportunities from California → City of Tustin

Same awarding agency

NAICS: 237110
SLED
Main Street Well 3 & Newport Well 3 Improvements Project (2026/2027)
Solicitation # CIP No. 60177
The City of Tustin is soliciting bids for the Main Street Well 3 and Newport Well 3 Improvements Project (CIP No. 60177), with an engineer's estimate of $775,000. The project involves comprehensive improvements to two municipal wells, including the removal, inspection, and rehabilitation of pumps and motors, downhole video inspections, and final commissioning. Specific requirements for Main Street Well 3 include converting the oil-lubricated lineshaft system to a continuous water-lubricated configuration and performing well rehabilitation. Newport Well 3 requires noninvasive electromagnetic casing-thickness inspections and upgrades to the magnetic flow meter, motor-operated valves, and PLC/SCADA systems. The contract will be awarded to the lowest responsive and responsible bidder, with a project schedule of 150 working days and a final completion deadline of June 30, 2027. Liquidated damages are set at $1,000 per day. Bidders must submit electronic proposals via the OpenGov portal by September 15, 2026, and provide a hard-copy bid bond to the City Clerk. The contractor is responsible for all quality assurance testing and must comply with the 2024 Standard Specifications for Public Works Construction, Cal-OSHA safety regulations, ADA standards, and California prevailing wage laws. Required documentation for submission includes a vendor questionnaire, unit prices, project references, and a compensation insurance certification.
Water and Sewer Line and Related Structures Construction

POSTED

28 days ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS