Wellhead Treatment Improvements At Pump Station 102A

Active
20261022026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Fresno, CA, 93727, USA

Set-Aside

NONE

Documents

4

20261020093507873 12700259 NIB.pdf

PDF

20261020093511821 12700259 Plans.pdf

PDF

20261020093515003 SOQ Forms.pdf

PDF

20261020102915167 12700259 Wellhead Treatment Improvements at PS102A Specifications_Final.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fresno
Contacts5 people available
OfficeN/A
Organization / AgencyCalifornia → City of Fresno
Office AddressN/A

Full Description

Show more
Bid #12700259: This project involves the construction of new water treatment facilities at a newly acquired property designated as Pump Station 102A, and a water main connection from Pump Station 102 to Pump Station 102A. The scope includes potholing, construction of an underground raw water transmission line, demolition and clearing, site grading, concrete driveway, yard piping, GAC system installation on a mat foundation, backwash standpipe and piping, chemical enclosure and electrical building, wrought iron perimeter fencing, and associated electrical and control systems improvements. The contractor is responsible for furnishing all labor, materials, and equipment to construct a remote Granular Activated Carbon (GAC) treatment facility.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves comprehensive wastewater infrastructure upgrades for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of 20-inch ductile iron force main and significant improvements to the Morgans Branch Pumping Station. Key station upgrades include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers and manholes, with a total project estimate of 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MBE/WBE compliance, including an EPA MBE participation goal of 10.9 percent. Bidders must provide a completed EJCDC C-410 Bid Form, bid security, and evidence of authority to sign. The successful contractor will be required to provide performance and payment bonds and maintain proof of insurance. Performance is subject to liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payment terms are set at thirty days after presentation to the owner, and the work must adhere to strict technical standards, including AWS D1.2 for welding and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing and restoration, as well as the relining, modification, or replacement of small and large diameter steel and ductile iron pipes and associated supports. Additional requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and the replacement of motor control center components. The project also encompasses electrical and instrumentation improvements, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is specifically targeting DBE, MBE, WBE, and SBE subcontractors, with a focus on services such as lead abatement, metals fabrication, painting, coatings, and trucking. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions to these documents must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 26 days
View Details

More opportunities from California → City of Fresno

Same awarding agency

NAICS: 237310
New
SLED
Chestnut Neighborhood Sidewalks
Solicitation # 12700243
The City of Fresno is soliciting bids for the Chestnut Neighborhood SRTS Project, a construction contract focused on installing new sidewalks and curb ramps within the area bounded by Chestnut, Tulare, Willow, and Belmont Avenues. The project includes work on several neighborhood streets, such as Garden, Winery, and Madison Avenues, with a total construction allocation of 1,865,000.00 dollars. The selected contractor must provide all necessary materials, labor, and equipment, completing all bid items within 90 working days from the Notice to Proceed. Performance is subject to a one-year warranty period for remedying defects and requires the use of the Construction Management Information System for daily reporting and project administration. Bidders must adhere to strict compliance standards, including Buy America requirements, California Labor Code prevailing wage laws, and various non-discrimination acts. A bid deposit of 10 percent of the total net bid amount is required, and the winning contractor must provide 100 percent performance and payment bonds. Additionally, the prime contractor is required to perform at least 30 percent of the total original contract price with its own organization. Submission requirements include a detailed bid proposal, a bidder's checklist, and various certifications regarding noncollusion, equal employment opportunity, and debarment status. The solicitation is open for responses until November 17, 2026.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS