This Government Contract opportunity from Department Of Agriculture was posted on May 30, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

West Dolores Road Improvement

Awarded
AG-82X9-S-08-0057Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Construction of The Recharge Master Plan Update (RMPU) Basin Improvements Project - Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-rmpu-basin-improvements-project-montclair-basin-0
The Recharge Master Plan Update Basin Improvements Project, managed by Granite Construction Company, involves the construction of two drop inlet diversion structures within the 25-foot-wide concrete San Antonio Creek Channel in Montclair, California. The scope of work includes excavating 8 to 10 feet below the channel floor, installing steel debris grates, and fitting wall-mounted steel gates on the east sides of the structures. Additionally, the project requires the installation of 4-foot-diameter discharge pipelines leading to Montclair Basins 2 and 3, which will be covered by 3 feet of soil and terminate in concrete outlet structures designed for flow dissipation. The project also encompasses the delivery of full electrical, instrumentation, and SCADA integration to manage gate actuation. Programming for these systems is strictly limited to approved integrators, specifically Technical Systems, Inc. or E Technologies Group. This solicitation is categorized under NAICS code 237990 and includes a Disadvantaged Business Enterprise set-aside. Interested parties should coordinate with the primary point of contact, Andrew Burk, regarding the submission requirements.
Granite Construction Company

POSTED

about 8 hours ago

DEADLINE

in about 17 hours
NAICS: 237990
New
SLED
6893
Solicitation # 49749
The Massachusetts Port Authority is soliciting proposals for the advance procurement, furnishing, and delivery of aviation electrical equipment for Logan International Airport in Boston, Massachusetts. The scope of work specifically requires the provision of L-868 Class IB stainless steel light bases (Size B, 12-inch diameter), as well as extensions, spacer rings, and 3/4-inch thick high-tensile machine steel flange rings with pavement dams. All equipment must comply with FAA Advisory Circulars 150/5345-53D and 150/5345-42K. Deliveries must be made to the Massport Central Stockroom no later than February 1, 2027, with a requirement for the supplier to provide at least seven calendar days of advance notice prior to shipment. Award selection is based on the best interest of the Authority, focusing on the responsiveness, capability, and responsibility of the proposer rather than solely on the lowest cost. As an Airport Improvement Program project, the contract is subject to extensive federal regulations, including Buy American preferences, Davis-Bacon wage requirements, and Civil Rights Title VI nondiscrimination assurances. Additionally, contractors must adhere to the Occupational Safety and Health Act of 1970, the Federal Fair Labor Standards Act, and specific prohibitions regarding certain telecommunications and video surveillance equipment. Proposers are required to submit unit pricing via Bid Express and provide necessary certifications regarding tax delinquency and felony convictions.
Massachusetts Port Authority - Goods & Services

POSTED

about 8 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
SLED
Gonyea Playfield
Solicitation # 2026-MPW-244
The Gonyea Playfield project, solicitation number 2026-MPW-244, is a community park improvement initiative for Pierce County Parks and Recreation in Parkland, Washington. The scope of work includes the construction of an inclusive play area, a nature play area, basketball courts, a perimeter loop path, flexible lawn areas, and a comfort station. Additional requirements involve stormwater management, utility and right-of-way improvements, site furnishings, signage, and landscape enhancements. The project is estimated at 3,390,000 dollars for the base bid and 1,385,000 dollars for additive alternates, which include a picnic shelter, skate spot, roly poly, site irrigation/trees, and right-of-way work. The contract will be awarded to the responsible bidder with the lowest responsive bid. Bids were due by November 18, 2026, and must have been submitted via the OpenGov Procurement Portal with a 5 percent bid bond. The successful contractor is required to provide a 100 percent payment and performance bond. Performance timelines mandate substantial completion of all base and alternate bid work within 275 calendar days of the Notice to Proceed, with final completion and acceptance required within a total of 305 calendar days. Compliance requirements include adhering to Washington State prevailing wage laws and ensuring that at least 15 percent of labor hours are performed by apprentices. The contractor must follow strict safety and environmental protocols, including the Pierce County Hot Work Procedure, ADA requirements for walkways, and specific hazardous material handling and disposal procedures for asbestos, lead, PCBs, and mercury. Quality assurance is managed through a mandatory testing and inspection program, with the contractor providing three days' notice to the County before work is ready for inspection.
Parks and Recreation

POSTED

about 11 hours ago

DEADLINE

in 15 days
NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for Contract 9585, Project 13863, to perform channel improvements at Castle Creek in Warner Park, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening it from Sherman Avenue to Warner Lagoon. Key activities include the removal of concrete, native plant restoration, storm sewer improvements, and the potential removal, salvage, and reinstallation of existing bridges. The project is supported by a Pre-Disaster Flood Resilience Grant from the Wisconsin Department of Military Affairs totaling 1,842,719.55 dollars and requires compliance with permits from the US Army Corps of Engineers and the Wisconsin Department of Natural Resources. Bidders must be pre-qualified by the Board of Public Works, specifically in category 246 for Ecological Restoration if the prime contractor does not hold that qualification. The solicitation mandates a 12 percent Small Business Enterprise goal and requires a 5 percent bid bond. Proposals must include a lump sum bid and detailed unit prices submitted electronically via Bid Express by November 5, 2026. Award criteria are based on a best value determination, and the successful contractor must adhere to strict erosion control standards and a one-year guarantee for seeded areas. Construction is required to commence within seven calendar days of a written notice to proceed.
City of Madison

POSTED

about 12 hours ago

DEADLINE

in 1 day
NAICS: 237990
New
SLED
2027 Mass Trails Grants
Solicitation # BD-27-1020-DCRCU-DC250-135070
The 2027 MassTrails Grant Program, administered by the Massachusetts Department of Conservation and Recreation, provides capital funding for the planning, design, engineering, permitting, construction, and maintenance of recreational trails and shared-use pathways. Eligible applicants include municipalities, non-profit organizations, federally or state-recognized Native nations, and state and federal agencies. Funding is sourced from the Recreational Trails Program and Commonwealth Trails, with grant awards ranging from 5,000 dollars to 100,000 dollars for RTP projects and up to 500,000 dollars for high-priority regional shared-use path projects. All grants require a minimum local match of 20 percent. Applications must be submitted electronically by February 1, 2027, and include a detailed budget, project timeline, locus maps, and landowner permissions. Projects are evaluated based on their ability to connect communities, serve diverse and underserved populations, adhere to accessibility guidelines, utilize funds efficiently, demonstrate project readiness, incorporate safety measures, and provide high-quality recreational experiences. Awarded contracts typically span one to two years, requiring the full expenditure of costs and matches by the end date. Compliance requirements include adherence to the Standard Commonwealth of Massachusetts Terms and Conditions, the Americans with Disabilities Act, and Title VI of the 1964 Civil Rights Act. Federally funded projects must comply with the Build America, Buy America Act, though a waiver is available for projects not exceeding 500,000 dollars through August 16, 2028. Additionally, land acquisitions must follow the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970. Final funding approval is subject to review by the Secretary and the Governor, with RTP funds requiring further approval from the Federal Highway Administration.
Department of Conservation and Recreation

POSTED

about 12 hours ago

DEADLINE

in 3 months

AI Contract Overview

Show more

The West Dolores Road Improvement project, solicitation number AG-82X9-S-08-0057, is a small business set-aside contract issued by the Department of Agriculture Forest Service through the Rocky Mountain Regional Office. The primary scope of work involves the hauling, placement, and compaction of Forest Service supplied aggregate from the Black Mesa Pit onto a contractor reconditioned roadbed. This work spans approximately 2.7 miles on the West Dolores road between Black Mesa road and Burro Bridge in Dolores, Colorado. The government established a budget of 60,000 dollars for the base project, with an estimated aggregate requirement of 2,151 cubic yards per mile, featuring a surface width of 22 feet and a minimum loose depth of 6 feet. In addition to the base aggregate work, the contract includes two optional bid items: clearing and brushing for two miles along the specified road section and asphalt patching of the bridge approaches at Burro Bridge. The project is governed by FP-03 Standard Specifications and Forest Service Supplemental Specifications, requiring strict adherence to traffic control plans and heavy construction wage determinations for Colorado. Contractors must also comply with comprehensive fire prevention and control plans for the San Juan National Forest and BLM San Juan Resource Area. The performance period is set for 30 calendar days following the Notice to Proceed.

General Info

Contract Value

$57,147.8

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Dolores County, Colorado, DOLORES, CO, 81323, USA

Set-Aside

NONE

Award Issued Date

Documents

14
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first6 pages · sow
High
HTML, High priority: read this first4 pages · wage-determination
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityother
Low
PDF, Low priorityother
Low
HTML

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 11:30 PM UTC to 9:30 PM UTC on May 19, 2008. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Rocky Mountain Regional Office
Contacts1 person available
OfficeLAKEWOOD, CO, 80401, USA
Office AddressLAKEWOOD, CO, 80401, USA
Contacts
Joe MilburnContracting Officer

Full Description

Show more
WEST DOLORES ROAD IMPROVEMENT. Haul, place and compact Forest Service supplied aggregate from Black Mesa Pit (7.4 miles) on a contractor reconditioned roadbed between Black Mesa road (NFSR 611) and Burro Bridge on the West Dolores road (NFSR 535) approximately 2.7 miles. The Government has $60,000 to spend on this project. The contractor will bid on how many cubic yards of aggregate they can place on the road. The Government estimates 2,151 CY per mile. Optional bid item #1: Clearing and brushing for two miles along the same section of road 2 past top of cut to 4 past fill side shoulder. Optional bid item #2: Asphalt patch of bridge approaches at Burro Bridge. This project is set aside for small business concerns. The solicitation for this project will only be made available through the Federal Business Opportunities website - www.fbo.gov.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS