Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from South Dakota was posted on May 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

West Sunnydale Road Reconstruction, Street and Utilities Improvements

Closed
RFB #24002State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work involves mowing, string trimming, edging, and cleanup for approximately 50 acres of maintained property and over 35 buildings. The contractor is responsible for providing all labor, supervision, equipment, materials, fuel, transportation, and insurance. Performance is based on a weekly schedule, with a requirement to maintain turf height between 3 and 4 inches. Any rejected work or identified deficiencies must be corrected within 48 hours at no additional cost to the government. The contract consists of an initial one-year term with the option for four additional one-year renewals. Award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. To be deemed technically acceptable, offerors must provide evidence of Kentucky state registration and licensing, verification of eligibility via the SAM portal, a detailed fixed-price quote, and a comprehensive submission including a technical proposal, company qualifications, three references, an equipment list, and a safety program. Compliance with the Federal Acquisition Regulation (FAR), OSHA, and EPA regulations is mandatory. Specifically, the contract adheres to the Davis-Bacon Act and Contractor Wage Rate Requirements under Wage Determination Number KY20210041. Payment is subject to net terms and requires the submission of weekly certified payroll and a signed Statement of Compliance with each invoice. Additionally, contractors must provide proof of their ability to secure performance and payment bonding. Quotes must be submitted electronically to the purchasing agent by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

12 minutes ago

DEADLINE

in about 8 hours
NAICS: 561730
New
SLED
IT, Lot Cleanup, Vegetation Control, Debris Removal, and Metal Product Decommissioning and Removing
Solicitation # RFP-Lot-Cleanup-CCT-IT-10_15.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for comprehensive lot cleanup, vegetation control, debris removal, and metal product decommissioning services for five designated lots located in Nespelem and Omak, Washington. The selected contractor will be responsible for providing all labor, equipment, and transportation to perform grass cutting, vegetation trimming, and the removal of loose garbage and abandoned materials. Additionally, the scope includes the decommissioning and removal of authorized products, equipment, and fixtures, with a strict requirement to notify the owner of any hazardous or contaminated materials discovered. The project concludes with a final site inspection to ensure all properties are left in a clean, orderly, and safe condition. Proposals are due by November 5, 2026, and must be submitted to the CCT IT Department. The contract term is for an as-needed period not to exceed three years, with payments contingent upon the availability of funds in the tribal treasury. Evaluation is based on a 100-point scale considering reliability, budget, and TERO designations, with a specific preference for responsible Indian Offerors whose prices are within 10 percent of the lowest non-Indian bid. Awardees must provide proof of insurance and sign a certification regarding debarment and suspension. Furthermore, any contract exceeding 100,000 dollars requires a performance bond, otherwise, a 25 percent retainage will be applied.
Confederated Tribes of the Colville Reservation

POSTED

about 15 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The City of Box Elder is seeking sealed bids for the West Sunnydale Road Reconstruction, Street and Utilities Improvements project, with bids due by 2:00 p.m. on June 17, 2025, at the City Hall. The project involves reconstructing approximately 3,100 linear feet of gravel roadway, installing gravel in certain areas, adding concrete curb and gutter, upgrading drainage systems with 18-inch and 24-inch storm sewer pipes, storm inlets, paving the street, constructing an asphalt sidewalk on one side, and implementing reseeding and erosion control measures. Bidders are encouraged to review the work sites to verify quantities and can obtain detailed project documents and specifications from Towey Design Group, Inc. An optional pre-bid meeting is scheduled for June 10, 2025, via Teams, with email registration required. All work must adhere to the Box Elder Standard Construction Specifications, and bid prices should reflect compliance with these standards. The contract emphasizes the importance of completing the project within the stipulated timeframe, with substantial completion required by October 17, 2025, and final readiness for inspection by November 7, 2025. The project’s estimated value ranges from 1.5 to 3 million dollars, and the City will award the contract within 21 days after the bid opening. For additional information or to submit questions, interested parties can contact Ashley Overeynder via email.

General Info

Agency

South Dakota → City of Box Elder

Place of Performance

SD, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Dakota → City of Box Elder
Contacts1 person available
OfficeN/A
Organization / Agency
South Dakota → City of Box Elder
Office AddressN/A
Contacts
Ashley OvereynderCity Official

Full Description

Show more
The City of Box Elder will be accepting sealed bids for the West Sunnydale Road Reconstruction, Street and Utilities Improvements, until 2:00 p.m. local time, June 17, 2025 , at the Box Elder City Hall, 420 Villa Drive, Box Elder, South Dakota, 57719. This project consists of the reconstruction of approximately 3,100 lf of gravel roadway with additional gravel, concrete curb & gutter in select locations, drainage improvement with 18” and 24” storm sewer piping, storm inlets, street paving, construction of an asphalt sidewalk along one side of the roadway and reseeding and erosion control measures. Bidders shall review the work areas to verify the quantities of work for the project. Project details, specifications, and bid documents may be obtained at the office of Towey Design Group, Inc., 147 Chisholm Dr., Box Elder, South Dakota, 57719. An optional pre-bid meeting will be held on June 10, 2025, at 1:30 p.m. local time via Box Elder City Hall, 420 Villa Drive, Box Elder, SD 57719. Email requests to join the Teams Meeting to: contact@example.gov Bidders must have access to a current set of Box Elder Standard Construction Specifications. All public improvements are required to conform to these specifications and bid prices must reflect these specifications. Bids may not be withdrawn prior to thirty (30) days after the bid opening. The Owner will award the bid within twenty-one (21) days after the bid opening. The Owner and Contractor hereby acknowledges that the time of completion of the work is of vital importance, and the Contractor will be required to complete the work within the time stipulated in the contract. Regardless of actual construction start date, all work associated with project shall be Substantially Complete by October 17, 2025, and completed ready for final inspection no later than November 7, 2025.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS