Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on April 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Western Hills Neighborhood Revitalization - FHWA

Closed
260170State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; construction and utility tasks including tunneling, boring, jacking, and cathodic protection; and surface improvements such as asphalt paving, lighting, and landscaping. Additionally, the project requires various materials and support services, including ready mix, precast concrete, traffic control, and storm water pollution prevention. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certifications. To be considered, responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a bid submission deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
Roosevelt Way Preservation (FHWA)
Solicitation # 2025-074
The Roosevelt Way Preservation Project (Solicitation 2025-074) is a federally funded infrastructure initiative managed by the City of Seattle Public Works. The project scope encompasses comprehensive roadway improvements along Roosevelt Way NE from NE 92nd Street to Pinehurst Way NE, and Pinehurst Way NE from Roosevelt Way NE to 15th Avenue NE. Key work elements include planing asphalt overlay, removing and replacing concrete panels and base repair, intersection realignment at NE 113th Street, and the installation of curb bulbs at NE 114th and NE 115th Streets. Additional requirements include ADA-compliant curb ramps, sidewalk restoration, channelization, traffic signals, storm drainage, landscaping, and pedestrian safety enhancements. The engineer's estimate for the project is between $12,500,000 and $12,800,000. As a project funded by the Federal Highway Administration (FHWA) and the Seattle Transportation Plan Levy, the contract mandates strict adherence to federal regulations, including Buy America certifications and a 13 percent Federal Small Business Enterprise (FSBE) goal. Bidders must provide a bid guaranty of five percent of the total bid and maintain various state and local registrations, including a Seattle Business License and UBI number. The contract is administered through a base bid structure with specific unit price items. Performance is subject to quality control inspections, with specific oversight from KC Metro for shelter footings and the Owner's Inspector for CIPP installation. The final bid submission deadline was established as November 18, 2026.
Public Works

POSTED

about 23 hours ago

DEADLINE

in 4 days
NAICS: 237310
New
SLED
CSAH 102 (Douglas Drive) Safety Improvements
Solicitation # 2211300
The CSAH 102 (Douglas Drive) Safety Improvements project, administered by Hennepin County and the Minnesota Department of Transportation under state project number 027-702-003, involves comprehensive infrastructure work including grading, bituminous surfacing, ADA improvements, and signal system revisions. The scope of work requires the contractor to provide all necessary labor, materials, and equipment to complete the project in accordance with the Department of Transportation Standard Specifications for Construction, 2025 Edition. Key deliverables include as-built feature survey memorandums, drainage and signal system mark-up plans, and professional surveyor certifications. Technical requirements include specific grounding electrode system standards and strict labeling for epoxy-coated bars. Contract administration is governed by a combination of quality control performed by the contractor and quality assurance managed by the agency, with electrical and traffic signal systems requiring certification by the Project Engineer. Financial and legal protections include a required bid bond of 5% of the bid total, as well as payment and performance bonds equal to the contract amount. Bidders must comply with prevailing wage laws, EEO regulations, and provide a Disadvantaged Business Enterprise certification. Proposals must be submitted electronically via the ProcureWare website, with specific requirements for non-collusion declarations and responsible contractor certifications. The contract also includes provisions for cost and fuel escalation and mandates that construction surveyors meet all MnDOT 1508 requirements.
Hennepin County

POSTED

about 23 hours ago

DEADLINE

in 24 days

General Info

Documents

21
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this firstcontractor-responsibility-form
High
PDF, High priority: read this first5 pages · contract-terms-and-conditions
High
DOCX, High priority: read this first12 pages · sbe-provisions
High
PDF, High priority: read this first5 pages · instructions-to-bidders
High
PDF, High priority: read this first8 pages · contract-document
High
PDF, High priority: read this first19 pages · general-conditions
High
PDF, High priority: read this first25 pages · contract-clause
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this first1 page · contract-document
High
PDF
PDF
XLSX
PDF
PDF
PDF
XLSX
XLSX
PDF
PDF
PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Transportation & Mobility
Contacts2 people available
OfficeTucson, AZ, 85701, USA

Interested Companies (37)

Acclaimed Drain And Plumbing SolutionsTucson, AZ
Achen Gardner ConstructionChandler, AZ
Active land and yard cleaningTucson, AZ

See All 37 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
This project shall consist of roadway paving, sidewalk additions, ADA ramps, shared use park path, bus stop enhancements and shelters, and drainage improvements. All roadways within the project limits will be milled and repaved, and utility adjustments and roadway re-striping will happen concurrent with the work. Some sections of roadway will be reprofiled to assist with positive stormwater drainage. New sidewalk will be installed in areas of the neighborhood that lack pedestrian connections. Additionally, ADA ramps will be constructed at roadway intersections to meet ADA requirements. Bus stops along S Campbell Ave and E 36 th St will receive enhancements such as new bus pads, shelters, benches, and trash receptacles. A new shared use path will be installed within James Thomas Park.

More opportunities from Arizona → Transportation & Mobility

Same awarding agency

NAICS: 541330
SLED
Professional Design Services for 22nd St. Improvement Project- Interstate 10 to Kino Parkway
Solicitation # 270173
The City of Tucson's Transportation and Mobility agency is soliciting professional design services for the 22nd Street Improvement Project, spanning from Interstate 10 to Kino Parkway. This initiative, part of the RTA Next plan, focuses on a Complete Street Modernization to reconstruct the corridor into a four-lane median-divided roadway featuring bicycle and pedestrian facilities, full pavement reconstruction, and drainage improvements. A critical component of the project is the implementation of grade separation at the Union Pacific Railroad Nogales Subdivision. The initial contract is limited to the delivery of a Design Concept Report (DCR) that must adhere to the Tucson Street Design Guide and ADOT Stage Deliverables Checklist, including traffic reports, preliminary surveys, geotechnical reports, and itemized cost estimates. The overall goal is to reach substantial project completion by the end of 2031. Solicitation number 270173 was posted on November 2, 2026, with a response deadline of November 30, 2026. The selection process is points-based, evaluating firms on team experience and qualifications (35%), available resources and methodologies (20%), and firm policies and procedures. The City may use a one-step or two-step process, with final selection based on the most qualified offerors entering negotiations for fees and terms. Awardees must comply with Small Business Enterprise (SBE) participation goals and provide a good faith effort certification. The contract requires adherence to strict cybersecurity frameworks, such as NIST and ISO/IEC 27001, and mandates that key personnel remain stable throughout the project. All submissions must be made electronically via the City's OpenGov portal to be considered.
Engineering Services

POSTED

12 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS