Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Wet Well Installation Specialist

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for a Wet Well Installation Specialist involves the installation of polymer concrete wet wells for prime contractors on OCWS lift station projects. The selected provider must utilize the caisson method, excavating from within the structure to ensure vertical sinking while maintaining a plumbness tolerance of 1/8 inch per foot. Additionally, the contractor is responsible for installing bottom seal plugs via the tremie concrete placement method to deliver a completely leak-free wet well. To qualify for this role, the contractor must demonstrate a proven track record by successfully completing three similar caisson installations in saturated soil environments. The opportunity is categorized under NAICS code 237110 and is managed by the Florida Water and Sewer agency, with a response deadline set for October 21, 2026.

General Info

Wet well installation subcontract for OCWS projects; caisson method required; deadline October 21, 2026.

Agency

Florida → Water and SewerView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of ITB WS 79-26.

The full solicitation package (23 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

West Sunset Lift Station

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Water and Sewer
ContactsNo contacts available
OfficeN/A
Organization / Agency
Florida → Water and Sewer
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs installation of polymer concrete wet wells for prime contractors on OCWS lift station projects. Executes the caisson method by excavating from within the structure to sink it vertically, maintaining plumbness within 1/8" per foot. Installs bottom seal plugs using the tremie concrete placement method. Requires successful completion of three similar caisson installations in saturated soils. Delivers a leak-free wet well.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 9 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 9 hours ago

DEADLINE

in about 23 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Florida → Water and Sewer

Same awarding agency

NAICS: 237110
New
SLED
West Sunset Lift Station
Solicitation # ITB WS 79-26
The West Sunset Lift Station project, solicitation ITB WS 79-26, is an infrastructure initiative by the Okaloosa Board of County Commissioners in Florida to replace an antiquated sanitary sewer lift station in Fort Walton Beach. The project involves site preparation, clearing, and the installation of a corrosion-proof polymer concrete precast wet well using the caisson method. Key equipment installations include 316 SS discharge piping, two 15 HP non-clog explosion-proof pumps, a guide rail system, and associated electrical components, including a motor control center and HMI control panels. The contract is based on a unit price bidding model and will be awarded to the lowest responsive and responsible bidder. The performance period requires substantial completion within 180 calendar days from the issuance of a Notice to Proceed. Bidders must comply with extensive regulatory and legal requirements, including SAM registration, Buy America certifications, E-Verify employment eligibility, and Florida-specific mandates such as the Anti-Human Trafficking Affidavit and the Scrutinized Companies List certification. The contractor is required to provide a bid bond, a 5% supply bond, and maintain builder's risk insurance, naming the County and Ardurra Group, Inc. as additional insureds. All work must adhere to the 100% design plans and technical specifications provided by Ardurra Group and the geotechnical report by Southern Earth Sciences, Inc.
Water and Sewer Line and Related Structures Construction

POSTED

about 14 hours ago

DEADLINE

in 30 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS