Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on May 26, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wetland Permit Work Construction at Fermilab

Closed
LBNF-342297-BWQFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

23891

Place of Performance

Batavia, IL, 60510, USA

Set-Aside

SBA

Documents

12

FRA RFP LBNF-342297-BWQ Package 4 - Sample Subcontract

PDF, High priority: read this firstrfp
High

FRA RFP No. LBNF-342297-BWQ: NSCF Wetland Permit Work Construction

PDF, High priority: read this firstrfp
High

LBNF-342297-BWQ Addendum 08

PDF, High priority: read this firstamendment
High

LBNF-342297-BWQ NSCF Wetland Permit Construction Specifications

PDF, High priority: read this firstspecifications
High

LBNF-342297-BWQ Package 2: Reference Drawings

PDF, High priority: read this firstspecifications
High

Addendum+1.zip

ZIP

Addendum+2.zip

ZIP

Addendum+3.zip

ZIP

Addendum+4.zip

ZIP

Addendum+5.zip

ZIP

Addendum+6.zip

ZIP

Addendum+7.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

8 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 19, 2023 to May 26, 2023. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 26, 2023 to Jun 1, 2023. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts2 people available
OfficeBatavia, IL, 60510, USA
Office AddressBatavia, IL, 60510, USA

Full Description

Show more
This Solicitation is for Wetland Permit Work located on-site at Fermilab and is comprised of the following elements. The Subcontractor's scope of work is not limited to the general work outline described below. The Subcontractor shall perform all work required to complete the construction work in accordance with the drawings and specifications. Tree Clearing Tree Clearing includes clearing, grubbing, tree and shrub protection, debris removal, surveying and accessories necessary for Tree Clearing for the areas in accordance with the Contract Documents. Tree Clearing shall wholly occur between November 15 and March 15. Site Work Site Work includes excavation, grading and stockpiling of wetland materials in all Temporarily and Permanently Impacted Areas as indicated on the Contract Documents, lined channels with outlets, surveying, silt fencing, erosion control blankets, riprap and accessories necessary for a complete installation. Please see the attached RFP files for more information. The anticipated period of perfomance for this work is November 2023 through March 2024. This is a small business set-aside; only firms certifying to be small businesses will be considered for award. Important dates and times: Mandatory Pre-proposal Conference via Zoom: May 4th, 2PM via Zoom. Please e-mail the solicitation contact with anticipated attendence list by April 28. Zoom link is in solicitation documents. Zoom meeting will be recorded. Questions due: May 12th, 2023. Proposals Due: 5PM, Friday, May 19th 2023. FRA intends to schedule OPTIONAL site visits prior to May 12th; notification will be provided via addenda to this SAM.gov posting with more details. ADDENDUM 1: Issued directly to attendees of mandatory pre-proposal conference, is being attached. Adddendum 1 includes information from the pre-proposal converence and information on an optional site visit May 11. ADDENDUM 2: Adddendum 2 includes information pertaining to the removal of quality requirements previously included in the RFP and pre-proposal presentation. ADDENDUM 3: Adds a Fully Burdened Rate Form and revised Mandatory Requirements Checklist to reflect this addition. Fully Burdened Rate Form is for suppliers to indicate fully burdened rates which may be used for the purposes of estimating and evalauting pricing for future potental change orders and not part of the RFP pricing evaluation. ADDENDUM 4: Provides Q&A Document, changes to RFP, and changes Proposal Due Date to 5/26/2023. ADDENDUM 5: Provides updated drawings. ADDENDUM 6: Provides updated wage decision modification numbers. ADDENDUM 7: Provides updated Terms and Conditions for Construction (5/2023) ADDENDUM 8: Extends due date for proposals to June 1st, 2023.

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 332323
New
Federal
Bar Grating and Saddle Clips
Solicitation # 388000kmb
Fermi Forward Discovery Group, LLC is soliciting firm-fixed price proposals under RFP 388000kmb for the fabrication and delivery of hot-dipped galvanized carbon steel bar grating and associated saddle clips. These materials are required for the VD Cryostat Roof Decking as part of the LBNF/DUNE project. The scope includes various sizes of bar grating with bearing bars measuring 1.5 inches tall by 3/16 inches thick and 19-W-4 spacing, along with Type W44 and W10 saddle clips. Technical requirements specify a minimum live load of 100 PSF, a minimum concentrated load of 1000 LB, and a maximum deflection of 0.25 inches. Proposals must be submitted via email to Karen Berger by 5:00 PM CT on November 6, 2026. A complete submission package requires a proposal including lead times, a completed first page of the RFP, the Subcontractor Annual Representations and Certifications (SARC), and the PROC-FRM-466 Proposal Certifications. Award will be based on the Lowest Price Technically Acceptable (LPTA) selection process, with a strong emphasis on strict adherence to technical specifications and FFDG terms and conditions to avoid disqualification. Delivery is required FOB Destination to the Dakota Warehouse in Rapid City, South Dakota. All items must be bundled and packaged to comply with the Ross Shaft Load Envelopes and Shipping Expectation guidelines to ensure compatibility with warehouse handling capabilities. Post-award deliverables include a detailed logistics and shipping plan and all applicable operator manuals. The contract is subject to various federal regulations, including Buy American requirements and FAR anti-discrimination laws.
Ornamental and Architectural Metal Work Manufacturing

POSTED

6 days ago

DEADLINE

in 8 days
View Details
NAICS: 332911
New
Federal
PIP-II CM 2K Pressure Safety Device - Rupture Disks
Solicitation # 387878-DSF
Fermi Forward Discovery Group, LLC, operating the Fermi National Accelerator Laboratory (Fermilab), is soliciting firm-fixed price proposals under solicitation 387878-DSF for the procurement of thirty-three cryogenic non-reclosable rupture disk cartridges. These components are required for the Proton Improvement Plan II (PIP-II) Cryomodule relief system and must be designed for sub-atmospheric cryogenic conditions of approximately 2 K and 30 mbar absolute pressure. The requirement includes disks with set pressures of 3.1 barg and 1.75 barg, constructed from Inconel, and equipped with normally closed burst alert sensors on the outlet. All disks must be ASME Section VIII Code NB/UD stamped and meet a helium leak rate specification of 10^-8 atm-cc/sec. Proposals must be submitted via email to Seth Fryar by October 30, 2026, at 2:00 PM Central Time. Submissions must include a technical proposal demonstrating merit and five years of relevant experience, a delivery schedule, and a price proposal using the provided Exhibit F pricing sheet. Award will be granted to the lowest evaluated proposal that meets all technical and past performance acceptability standards. The contract requires strict adherence to various federal regulations, including the Buy American Act, FAR anti-discrimination laws, and DOE site access and safety requirements. Delivery is FOB Destination to Batavia, Illinois, where Fermilab will conduct visual, mechanical, and certification inspections within two weeks of receipt.
Industrial Valve Manufacturing

POSTED

6 days ago

DEADLINE

in 1 day
View Details
NAICS: 331491
Federal
PIP-II Niobium Sheets, Rings, and Disks
Solicitation # 385634-DSF
Fermi National Accelerator Laboratory (FNAL), through the Fermi Forward Discovery Group, LLC, is soliciting firm-fixed price proposals for the manufacturing, testing, certification, and delivery of high-purity Niobium and Niobium-Alloy components. These materials, which include RRR300 Niobium sheets, Nb55Ti rings and disks, and forged Niobium rings, are critical for superconducting radio-frequency cavities used in the Proton Improvement Plan II (PIP-II) project. All deliverables must adhere to strict technical specifications, including a Residual Resistivity Ratio (RRR) value greater than 300 and compliance with ASTM B-391, B-393, and E-8/E-384 standards. Materials must be delivered FOB Destination to Batavia, Illinois, with specific requirements for non-abrasive packaging and permanent product inscription for traceability. Proposals are due by November 10, 2026, and must be submitted in two separate volumes: a technical proposal and a business/price proposal. Evaluation is based on a best-value trade-off where technical merit, quality assurance plans, and past experience are significantly more important than price. Offerors must provide a minimum of three relevant examples of similar work from the past five years and a detailed project schedule. Mandatory submissions include the SARC (PROC-FRM-100) and Proposal Certifications (PROC-FRM-466) forms. The contract incorporates various Federal Acquisition Regulation (FAR) and Department of Energy Acquisition Regulation (DEAR) clauses, including strict prohibitions against racially discriminatory DEI activities under FAR 52.222-90 and compliance with the Buy American Act.
Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding

POSTED

10 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS