Whisper Way Storm Drainage Improvements Project

Closed
PE-66760-NONST-2024-000000002State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
RFB-PARKS-MISSISSIPPI RIVER BLVD RETAINING WALLS REBID
Solicitation # 1777
The City of Saint Paul Parks Department is soliciting bids for the Mississippi River Blvd Trail Improvement Project, which involves the removal and reconstruction of retaining walls, trails, and fencing near Princeton Avenue. The scope of work includes the removal of existing Loffelstein walls and bituminous walks, the installation of soldier pile walls with galvanized steel bridge plank lagging, and the paving of a new bituminous trail. The base bid must include an ADA trail transition to connect to the existing trail. Key deliverables include site protection, erosion control, and the installation of concrete pile caps and structural backfill. The contract will be awarded to the lowest responsible base bidder based on an evaluation of their experience, financial resources, and technical capabilities. Bidders must submit their responses via the City of Saint Paul Supplier Portal by December 9, 2026, using the required Excel bid form. Mandatory compliance requirements include adhering to the City of Saint Paul Little Davis-Bacon prevailing wage standards and Affirmative Action/Equal Employment Opportunity specifications. Upon award, the successful contractor must provide performance and payment bonds, certificates of insurance, and human rights compliance documentation. The work is subject to a one-year guarantee from the date of substantial completion.
City of Saint Paul

POSTED

about 9 hours ago

DEADLINE

in 29 days
NAICS: 237310
New
SLED
RFB-PW-SAINT ANTHONY MILL&VERLAY 2026
Solicitation # 1785
The City of Saint Paul Parks Department is soliciting bids for the 2026 Saint Anthony Mill and Overlay project, located along Saint Anthony Avenue and Rondo Avenue between Snelling Avenue and Marion Street. The scope of work focuses on pavement resurfacing via a standard 2-inch mill and overlay, as well as significant pedestrian and safety enhancements. Key deliverables include the construction of curb extensions, ADA-compliant pedestrian ramps, concrete curb replacement, storm sewer installation, and the paving of off-street bike paths. All work must adhere to the City of Saint Paul Department of Public Works governing specifications and the 2026 MnDOT Schedule of Materials Control. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit all documentation through the City of Saint Paul Supplier Portal by December 7, 2026, at 2:00 PM CST. Required financial protections include a performance bond and a payment bond, each equal to 100% of the contract amount, and general liability insurance with a $1,500,000 per occurrence limit. The project is subject to the Little Davis-Bacon Ordinance regarding prevailing wages and includes a Vendor Outreach Program to encourage the participation of local small, woman-owned, and minority-owned businesses. Contractors must also provide a signed statement under oath verifying compliance with minimum criteria per Minnesota Statutes.
City of Saint Paul

POSTED

about 9 hours ago

DEADLINE

in 27 days

AI Contract Overview

Show more

The project involves the removal of approximately 178 linear feet of two existing 24-inch CMP pipes, along with the demolition of a double wing catch basin, upstream headwall, and downstream headwall at the end of Whisper Way. These elements will be replaced with new storm drainage infrastructure, including two 36-inch RCP pipes of similar length, a double wing catch basin, and headwalls both upstream and downstream. The new pipes are to be installed at existing grades to avoid interference with existing utilities, with provisions made for positive drainage through tail ditches at both ends of the system. The work must be performed within limited easements—specifically, the right-of-way, a 20-foot permanent drainage easement, and a 30-foot temporary construction easement—while minimizing disturbance to existing driveways, curb, gutter, and pavement through the use of trench shoring methods. All new storm structures will include paved inverts as shown on the project drawings, and the contractor is responsible for locating and protecting existing utilities to prevent service interruptions during construction. The project is overseen by the City of Peachtree Corners, Georgia, with a response deadline of March 14, 2024, and the primary contact being Kevin Whigham.

General Info

Documents

1
PDF, High priority: read this firstadvertisement-for-bids
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 66760 DACULA, PE-66760-NONST-2024-000000002 to PE-66760-NONST-2024-000000002.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Peachtree Corners
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Demolish and remove (2) sections of existing 24¿ CMP pipes (178 L.F. +/- total length of pipe), (1) double wing catch basin, (1) upstream headwall, and (1) downstream headwall at the end cul-de-sac of Whisper Way. Install (2) new sections of 36¿ RCP pipes (178 L.F. +/- total length of pipe),(1) double wing catch basin, (1) upstream headwall, and (1) downstream headwall. Top of new storm pipes shall hold existing grade so as to not interfere with existing utilities. Contractor shall tail ditch upstream and downstream end at headwalls so there is positive drainage though the new storm pipe system. Disturbance to existing driveways, curb & gutter, and asphalt pavement shall be minimized with use of trench boxes and/or other shoring methods as existing and proposed easements are limited. No disturbance outside of right-of-way, 20¿ Permanent Drainage Easement, and 30¿ Temporary Construction Easement is allowed. Contractor shall install new paved invert to all new storm structures as illustrated on the Drawings. Contractor will be required to locate and protect all existing utilities without interruption of service.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS